Decorative Tile Trims (Listels / Bombati)

Fitting listels or bombati means setting narrow decorative strips in a level line within the tiling, mitring them at corners and grouting. Guide price: €2.50 per running metre. Corners, profile and material affect the cost most.

Updated 09/2026·11 min read·20 price list items
Standard labour price
€2.50/ lm
Indicative range
€2.00 - €3.25
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Decorative Tile Trims (Listels / Bombati)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
XXL format wall/floor tiling 120×260m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Groutingm²€1.90 / m²m²enter quantity-
Silicone groutingm²€3.60 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Skirting from tileslm€6.50 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What listels and bombati are and when they are used

Listels and bombati are narrow decorative strips set into standard wall tiling. They form a horizontal line in a bathroom, frame the splashback behind kitchen units or neatly finish tiling that stops short of the ceiling. The strip should sit in line with the surrounding tiles so the line reads as one piece. This work is usually done as part of new tiling services. A listel can be set into existing tiling, but the job is considerably harder.

A listel (also called a listello or border tile) is a narrow strip fitted between rows of tiles. It can be plain, relief, patterned, glass, metal or stone. Widths usually range from about 1 to 10 cm. The length often matches one tile, for example 20, 25, 30 or 60 cm, so that it lines up with the tile joints.

A bombato is the name usually given in showrooms to a narrow strip with a raised, rounded profile, often only 1 to 3 cm wide. In the UK, similar pieces are often sold as pencil or dado rail tiles. It has a three-dimensional look, casts a shadow and is often used as the top edge of tiling or as a strong dividing line. Names vary between manufacturers, so it is worth checking the cross-section of the piece in the showroom.

For the tiler, the main differences are thickness and shape. A flat listel is laid much like a tile. A raised bombato stands proud of the wall, is harder to cut and makes corners more difficult.

What needs deciding before tiling starts

A line in the tiling cannot be moved later without breaking out tiles. Its height also sets how every row above and below it is cut. These points should be agreed before the first row is fixed.

  • Height of the line: in bathrooms the height often relates to the taps, a shelf or the window sill. In kitchens the line usually runs just above the worktop or below the wall units. The height should be worked out so that no thin slivers of tile are left above or below it, as these look poor and are difficult to fix.
  • Where the line runs: on one wall only, behind the kitchen units or around the whole room. This determines the number of corners and the length in running metres.
  • Flush or proud: whether the strip sits flush with the tiles or deliberately stands out. With a bombato the profile decides this, with a flat listel it is a choice.
  • Corner detail: whether external corners will be mitred or the manufacturer supplies corner pieces. Corner pieces should be ordered together with the listels.
  • Suitability for wet areas: in wet zones such as a shower enclosure, choose pieces the manufacturer approves for bathroom use. Some decorative listels are intended for dry interiors only.
  • Quantity and batch: about 10 % is normally added to the measured length, more where there are many mitred corners or the material is fragile. All pieces should come from the same production batch, as shade and pattern can vary slightly between batches. Pieces bought later may not match.
  • Grout and adhesive colour: the grout should match or complement the surrounding tiles. With some materials the adhesive colour also matters, see the materials section below.

Listel materials and what they require

  • Ceramic and porcelain: the most common choice, coping well with moisture and cleaning. Cut with a diamond blade, ideally on a wet saw.
  • Glass: needs a white adhesive suitable for glass and mosaic, because grey adhesive shows through. Coarse grout and abrasive sponges should be kept off the glossy surface, as it scratches easily.
  • Metal: stainless steel or aluminium strips are cut with a metal-cutting disc and the cut edges must be deburred. Metal expands with temperature differently from ceramic, so it needs a flexible adhesive recommended by the manufacturer for metal. Standard rigid tile adhesive can let go over time. Flexible adhesive is especially important where the wall heats up, for example behind a hob.
  • Natural stone: it is absorbent, so it is usually sealed before grouting to stop grout pigment soaking in. Light-coloured stone needs a light adhesive.

How to fit a listel into tiling step by step

  1. Marking the line and setting out: before the first tile goes on, the height of the line is marked around the whole room with a laser or a long spirit level. Rows are then set out downwards and upwards from it to avoid thin cuts. A small error in one corner grows considerably by the end of the wall.
  2. Dry layout: pieces are laid out side by side to see where the joints fall and where cuts are needed. With patterned pieces, check that the design runs on.
  3. Tiling below the line: the lower rows are set from the marked height, not from the floor. On an uneven floor the first full row is often supported on a batten and the bottom row is cut in later. The adhesive is left to set as stated on the packaging.
  4. Matching thickness: a listel is often thinner or thicker than the tile. The adhesive bed is adjusted so that the face sits flush with the tiles, or so that the strip stands proud evenly along its whole length.
  5. Cutting: pieces are cut with a blade suited to the material and the edges are lightly smoothed.
  6. Fixing: adhesive is applied to both the wall and the back of the piece (back-buttering) so that no voids remain. This matters even more with relief and raised pieces, as a hollow piece breaks off easily when knocked.
  7. Corners: at external corners the strips are mitred at 45 degrees, or corner pieces are used if the manufacturer supplies them. At internal corners a flat listel is usually butt-jointed, with one piece covering the end of the other. A raised bombato or deep relief needs a mitre at internal corners too, otherwise the profiles will not meet.
  8. Checking level and joints: after pressing in, height and plane are checked with a spirit level. Joints are held with spacers or wedges, their width usually matching the surrounding tiling, typically 2 to 3 mm for wall tiles. Excess adhesive is removed from the joints while still soft.
  9. Tiling above the line: the next rows of tiles continue, resting on the line.
  10. Grouting: grouting starts only once the adhesive has set, usually after at least 24 hours with standard cement-based adhesive, sooner with rapid-setting adhesive as stated on the packaging. Joints are filled with the same or a matching grout as the surrounding tiling. Relief parts are cleaned carefully with a damp sponge so that no dried grout is left in them. Internal corners and junctions with sanitaryware are left for flexible silicone sealant.

Price of listel tiling per running metre: what it depends on

The work is priced per running metre, that is, by the length of the line. To estimate the length, add up the lengths of all walls the line runs along and deduct breaks such as doors or windows. The guide price for labour is €2.50 per running metre. This applies to a typical situation, and the final figure is mainly affected by these factors:

  • Number of corners and breaks: the simplest job is a straight line along one wall with no corners. Every external corner, window and recess means an accurate mitre cut. A line around a whole room with many corners takes noticeably longer.
  • Profile: a flat ceramic listel of the same thickness as the tile is the quickest. A raised bombato or deep relief is hard to mitre and the work is much slower.
  • Material: fragile glass and thin stone need more careful cutting, special adhesive and, for stone, sealing. Metal needs a different disc, flexible adhesive and deburring.
  • Listel size relative to the tiles: when the listel length does not match the tile size, the joints have to be lined up painstakingly. This is common with standard tiling up to 60 cm, and more so with large format 60 x 120 cm tiles or large format slabs of 120 x 260 cm, where the strip lengths rarely match the tile modules.
  • Condition of the wall: on an uneven wall the strip has to be packed out with adhesive, which takes more time and material.
  • New or existing tiling: inserting into existing tiling is the most expensive option. A full row of tiles has to be removed without damaging the neighbouring ones and the old adhesive cleaned off the wall, which often takes longer than fitting the listel itself.
  • Broken pieces: the job also costs more when some pieces break during cutting. With expensive decorative pieces this can add more to the material cost than to the labour.

When comparing quotes, ask whether the price per running metre includes mitring corners, adhesive and grouting, or whether any of these are charged separately.

How to prepare the site so the work runs smoothly

A tiler works efficiently when there is nothing to wait for and nothing changes during fixing. It helps when:

  • all listels, corner pieces and spares are on site at once, unpacked and checked for damage,
  • the positions of taps, basin, mirror and shelf are clear before starting, and in kitchens the height of the worktop and wall units,
  • water pipes and electrical cables in the wall are finished, so that new tiling does not have to be chased out,
  • the grout and adhesive colours are chosen in advance, not on the day of grouting,
  • all walls are freely accessible and the room is at normal room temperature.

The job takes longer if the line height is changed after the lower rows are fixed, if missing pieces have to be reordered or if a decision on the corners is still awaited.

Typical mistakes and how they show later

The line is not level. It is set from the floor or the previous row instead of a laser. Floors are rarely level and the error shows immediately in the line, most of all at corners where the ends do not meet.

The height was not worked out in advance. Tiling below the line starts without setting out and a thin sliver of tile is left above the line or at the ceiling, which looks like a mistake.

A piece stands proud or is sunk. Nobody dealt with the different thickness of listel and tile. Under side lighting every step is clearly visible.

Hollow spots. Adhesive is applied only in dabs. The piece sounds hollow when tapped and may crack or break off when knocked over time, especially a raised bombato.

Poor corners. An inaccurate mitre with an open joint or chipped glaze. In a bathroom, water gets into the open joint and dirt collects there.

Grout left in the relief. It is not removed in time, dries in the grooves and is then hard to clean.

Metal on rigid adhesive. A metal strip moves differently from the tiles with temperature changes and can come loose over time without flexible adhesive.

Unsealed stone. It absorbs grout pigment and is left with dark edges.

Unsuitable cleaning products. Acidic cleaners dull or stain metal and stone.

A decorative piece in a wet area where it does not belong. A listel intended only for dry interiors may lose colour or shine, or come away, if used in a shower enclosure.

DIY guide: what to watch for when doing it yourself

If you are tiling yourself and have experience with at least standard wall tiling, a straight line of flat ceramic listels is manageable. The method is the same as in the steps above. With glass, stone or a raised bombato with many corners, it is more sensible to call in a tiler, and the same applies to inserting a listel into existing tiling.

  • Before cutting the first real piece, try a mitre on an offcut or a spare piece.
  • Cut mitres on a bench wet saw rather than freehand with an angle grinder, as the cut is more accurate and the glaze chips less.
  • Start in the least visible corner, for example behind the door, so that any imperfect joint is out of sight.
  • Keep the laser on throughout fixing the line and check the height every few pieces, not only at the end of the wall.
  • Apply adhesive only to a section you can fix and check before it starts to set.
  • Wear safety glasses and gloves when cutting, as cut edges of ceramic and glass are sharp.

How to check the finished work

  • the line is level along its whole length and meets up at the corners,
  • the face of the listel sits flush with the tiles, or stands proud evenly along its whole length,
  • no piece sounds hollow when tapped,
  • external corners are accurately mitred, without chipped glaze or open joints, and internal corners are neatly overlapped or mitred,
  • joints are the same width and colour as in the surrounding tiling,
  • no adhesive or grout residue is left in the relief or on glossy surfaces,
  • the pattern runs on and all pieces are the same shade,
  • there are no thin slivers of tile above or below the line,
  • internal corners and junctions with sanitaryware are finished with flexible silicone,
  • a few spare pieces have been left for any future repair.

Frequently asked questions

The guide price for labour is €2.50 per running metre. Expect to pay more for a line with many mitred corners, for a raised bombato, glass or stone, and above all for inserting into existing tiling.