Project Calculator

Calculate the price of building works → Construction costings

Want to save hours of work creating price offers? Automate price offer creation and increase your success. Always current and accurate prices for all your services. Simple calculations that anyone can handle.

Demolition works
Demolition of cladding and paving
Ø Price: 20.5 $ - 30.7 $
0 m²
Demolition of partitions – brick
Ø Price: 33.1 $ - 49.7 $
0 m²
Dismantling HPL board core
Ø Price: 946.8 $ - 1420.2 $
0 pcs
Dismantling the bathtub
Ø Price: 124.6 $ - 186.8 $
0 pcs
Dismantling the washbasin
Ø Price: 54.6 $ - 82 $
0 pcs
Demolition of the old riser toilet screen
Ø Price: 124.2 $ - 186.4 $
0 pcs
Demolition of metal doorframes (concrete)
Ø Price: 89.1 $ - 133.7 $
0 pcs
Demolition of built-in wardrobe
Ø Price: 113.8 $ - 170.8 $
0 pcs
Tearing up old floating floors (parquet, linoleum)
Ø Price: 3.3 $ - 4.9 $
0 m²
Demolition of old kitchen cabinets
Ø Price: 174.5 $ - 261.7 $
0 pcs
Concrete cutting
Cutting of reinforced concrete panel (holes, windows, doors) up to 10 cm
Ø Price: 93 $ - 139.6 $
0 lm
Cutting of reinforced concrete panel (holes, windows, doors) up to 15 cm
Ø Price: 124.7 $ - 187.1 $
0 lm
Installation of the steel support structure in the cut-out hole
Ø Price: 628.3 $ - 942.5 $
0 pcs
Trimming of metal door frames into reinforced concrete panel up to 10 cm
Ø Price: 361.1 $ - 541.7 $
0 pcs
Trimming of metal door frames into reinforced concrete panel up to 15 cm
Ø Price: 293.8 $ - 440.6 $
0 pcs
Curving saw used for making a hole in a reinforced concrete panel up to 10 cm
Ø Price: 240.1 $ - 360.1 $
0 pcs
Curving saw used for making a hole in a reinforced concrete panel up to 15 cm
Ø Price: 342.7 $ - 514.1 $
0 pcs
Masonry works
Bricklaying of partitions up to a thickness of 12.5 cm
Ø Price: 35.2 $ - 52.8 $
0 m²
Meshing of masonry partitions
Ø Price: 23.4 $ - 35 $
0 m²
Bonding primer application to the walls and floor
Ø Price: 2.8 $ - 4.2 $
0 m²
Bricklaying – of building shell up to a thickness of 30 cm (Porotherm, Ytong brick)
Ø Price: 66.2 $ - 99.4 $
0 m³
Bricklaying of perimeter walls – Building shell up to a thickness of 30 cm (Porotherm, Ytong brick)
Ø Price: 82.2 $ - 123.2 $
0 m²
Bricklaying of chimney made of fireclay bricks with a ceramic liner
Ø Price: 83.7 $ - 125.5 $
0 lm
Bricklaying of the Schiedel-type chimney with a ceramic liner
Ø Price: 138.3 $ - 207.5 $
0 lm
Wall patching, rough patching (Rimano, MVR Uni)
Ø Price: 19.3 $ - 28.9 $
0 m²
Plastering of walls (lime-cement rough plaster)
Ø Price: 18.7 $ - 28.1 $
0 m²
Painting works
Scraping off old coating (paint)
Ø Price: 5.7 $ - 8.5 $
0 m²
Scraping off old oil colour (paint)
Ø Price: 13.7 $ - 20.5 $
0 m²
Bonding primer application to the walls and ceiling
Ø Price: 3.5 $ - 5.3 $
0 m²
Painting – wall priming (2× white coat)
Ø Price: 6.5 $ - 9.7 $
0 m²
Wall painting – colour coating
Ø Price: 7.2 $ - 10.8 $
0 m²
Installation of window corner iron – vertical edges of corners or around windows
Ø Price: 8.5 $ - 12.7 $
0 lm
Plaster finish application to the ceiling
Ø Price: 13.8 $ - 20.8 $
0 m²
Plaster finish application to the walls
Ø Price: 15 $ - 22.6 $
0 m²
Painting vertical radiator pipes
Ø Price: 7 $ - 10.6 $
0 lm
Painting cast iron radiators (1 rib)
Ø Price: 7.8 $ - 11.8 $
0 pcs
Venetian stucco – polished plaster finish
Ø Price: 114.1 $ - 171.1 $
0 m²
Taping – Fixing cracks in walls and ceiling
Ø Price: 7.5 $ - 11.3 $
0 lm
Acrylic coating application to joints
Ø Price: 5.8 $ - 8.8 $
0 lm
Wallpapering of walls (Vinyl, Non-Woven, Paper)
Ø Price: 24 $ - 36 $
0 m²
Plasterboard works
Installation of plasterboard walls – single single skin
Ø Price: 47.8 $ - 71.8 $
0 m²
Installation of plasterboard ceilings and suspended ceilings
Ø Price: 69.8 $ - 104.6 $
0 m²
Installation of plasterboard walls – double skin
Ø Price: 88.9 $ - 133.3 $
0 m²
Installation and fitting of acoustic / thermal insulation
Ø Price: 8.6 $ - 13 $
0 m²
Installation of atypical termination for hinged windows or LED strip
Ø Price: 83.6 $ - 125.4 $
0 lm
Acrylic coating application to plasterboard corners and joints
Ø Price: 2.8 $ - 4.2 $
0 lm
Cut openings for light fittings, speakers, etc. – up to 150 mm diameter
Ø Price: 17.9 $ - 26.9 $
0 pcs
Tiling works
Laying of cladding and tiles up to 60 cm
Ø Price: 87.6 $ - 131.4 $
0 m²
Laying of Gres cladding and tiles over 60 cm
Ø Price: 92 $ - 138 $
0 m²
Laying of cladding and paving – large format 60 x 120 cm
Ø Price: 159.1 $ - 238.7 $
0 m²
Laying of cladding and tiles – large format 120 x 260 cm
Ø Price: 342.7 $ - 514.1 $
0 m²
Lining of the perimeter plinth made of tiles – interior
Ø Price: 14.5 $ - 21.7 $
0 lm
Mosaic cladding
Ø Price: 133.1 $ - 199.7 $
0 m²
Water jet cutting 60 x 60 cm (Jolly edge)
Ø Price: 18.2 $ - 27.2 $
0 lm
Water jet cutting 120 x 120 cm (Jolly edge)
Ø Price: 20.9 $ - 31.3 $
0 lm
Water jet cutting (Jolly edge) – cutting in a tile
Ø Price: 34.5 $ - 51.7 $
0 lm
Installation and fitting – Jolly edges
Ø Price: 33.4 $ - 50 $
0 lm
Tiling from Listely / Bombata
Ø Price: 32.2 $ - 48.2 $
0 lm
Laying of paving – in a diagonal direction
Ø Price: 108 $ - 162 $
0 m²
Grouting cladding and paving
Ø Price: 5.8 $ - 8.6 $
0 m²
Grouting cladding and paving with a silicone grouting mixture
Ø Price: 12.2 $ - 18.2 $
0 m²
Silicon application to corners and angles
Ø Price: 6 $ - 9 $
0 lm
Waterproofing coating (around the bathtub, around the sink, under the shower enclosure)
Ø Price: 16.6 $ - 25 $
0 m²
Bonding waterproofing tapes to corners
Ø Price: 9.8 $ - 14.8 $
0 lm
Cutting holes in cladding and paving
Ø Price: 7.4 $ - 11 $
0 pcs
Installation of the bathtub and connection to the drain
Ø Price: 148.7 $ - 223.1 $
0 pcs
Masonry bathtub
Ø Price: 128.6 $ - 192.8 $
0 pcs
Bricklaying and weathering the shower step
Ø Price: 253.6 $ - 380.4 $
0 x
Installation of Geberit toilet construction + walling-in
Ø Price: 284.6 $ - 426.8 $
0 pcs
Installation and connection of toilet combi
Ø Price: 138.3 $ - 207.5 $
0 pcs
Cladding using natural / artificial stone / clinker bricks
Ø Price: 156.3 $ - 234.5 $
0 m²
Split stone cladding – (concrete fences, exterior plinth)
Ø Price: 166.8 $ - 250.2 $
0 m²
Installation of a bath / shower tap with a shower holder
Ø Price: 75.3 $ - 112.9 $
0 pcs
Installation of a water tap
Ø Price: 61.3 $ - 91.9 $
0 pcs
Curving saw used for making holes in paving and gres
Ø Price: 8.6 $ - 13 $
0 pcs
Installation of the cabinet under the washbasin
Ø Price: 110.2 $ - 165.2 $
0 pcs
Sticking the mirror
Ø Price: 101 $ - 151.6 $
0 pcs
Other unspecified works in this field (Hourly pay)
Ø Price: 82.6 $ - 124 $
0 h
Floor-laying works
Fully glued wood flooring – click / clack
Ø Price: 40.6 $ - 61 $
0 m²
Laying and gluing of new parquet blocks
Ø Price: 62.8 $ - 94.2 $
0 m²
Sanding wooden parquet including varnishing
Ø Price: 59.7 $ - 89.5 $
0 m²
Dismantling of old parquet floors – gently according to the laying plan
Ø Price: 13.8 $ - 20.6 $
0 m²
Tearing out old wooden parquet (nailed, glued to the resin)
Ø Price: 8.5 $ - 12.7 $
0 m²
Sanding of the sub-base before levelling from the adhesive – resin
Ø Price: 7.4 $ - 11.2 $
0 m²
Installation of laying and gluing the original parquet blocks – reconditioning
Ø Price: 41.8 $ - 62.6 $
0 m²
Leveling bedding (ECA) Expanded Clay Aggregate
Ø Price: 20.6 $ - 31 $
0 m²
Laying and installation of OSB boards on the floor by screwing together
Ø Price: 15.8 $ - 23.8 $
0 m²
Installation of Liapor dry flooring + plane gluing of Rigidur plates
Ø Price: 42.4 $ - 63.6 $
0 m²
Installation of dry flooring – Rigidur floor plate
Ø Price: 28.9 $ - 43.3 $
0 m²
Hardboard PTN – thermal + sound insulation (20 mm)
Ø Price: 4.2 $ - 6.2 $
0 m²
Bonding primer application on the floor before levelling
Ø Price: 3.1 $ - 4.7 $
0 m²
Expansion strip along the perimeter when levelling
Ø Price: 3.9 $ - 5.9 $
0 lm
Levelling (flattening) of the floor up to a maximum thickness of 2.9 cm
Ø Price: 13.4 $ - 20.2 $
0 m²
Sanding, sealing and 3 x varnishing of parquet flooring
Ø Price: 96.4 $ - 144.6 $
0 m²
Flame bonding of asphalt felt – horizontal surface (1× layer)
Ø Price: 12.6 $ - 19 $
0 m²
Bonding primer application on the floor before levelling + acrylic coating application to corners
Ø Price: 5.5 $ - 8.3 $
0 m²
Laying of floating floor
Laying of click / clack-type floating vinyl floor
Ø Price: 24.5 $ - 36.7 $
0 m²
Laying of floating laminate floor
Ø Price: 25.8 $ - 38.6 $
0 m²
Laying of floating wooden floor (click / clack)
Ø Price: 42.6 $ - 64 $
0 m²
Grinding and levelling of the sub-base before laying (concrete)
Ø Price: 11 $ - 16.4 $
0 m²
Acrylic coating application, sealing around baseboards
Ø Price: 2.7 $ - 4.1 $
0 lm
Fitting of floor perimeter trims
Ø Price: 11.2 $ - 16.8 $
0 lm
Electrical installation works
Wiring installation + assembly (1-room flat)
Ø Price: 2427.6 $ - 3641.4 $
0 x
Wiring installation + assembly (2-room flat)
Ø Price: 2905 $ - 4357.4 $
0 x
Wiring installation + assembly (3-room flat)
Ø Price: 3659.8 $ - 5489.6 $
0 x
Wiring installation + assembly (4-room flat)
Ø Price: 5316.6 $ - 7810.8 $
0 x
Wiring installation + assembly (5-room flat)
Ø Price: 6636.5 $ - 9749.9 $
0 x
Installation of computer network wiring – FTP cables
Ø Price: 973.1 $ - 1459.7 $
0 pcs
Cutting of grooves for wiring
Ø Price: 14.4 $ - 21.6 $
0 lm
Flushing walls after wiring installation
Ø Price: 18.5 $ - 27.7 $
0 lm
LED strip installation
Ø Price: 19.6 $ - 29.4 $
0 lm
Installation and connection of electrical fan (bathroom, toilet)
Ø Price: 143.3 $ - 214.9 $
0 pcs
Installation of recessed lighting fixture with framing
Ø Price: 46.6 $ - 70 $
0 pcs
Installation of a hanging chandelier
Ø Price: 107 $ - 160.6 $
0 pcs
Installation of a wall lamp
Ø Price: 34.2 $ - 51.4 $
0 pcs
External LV (low voltage) connection to the flat for the electricity meter
Ø Price: 1392.3 $ - 2088.5 $
0 pcs
Revision report for wiring (flat)
Ø Price: 525.1 $ - 787.7 $
0 x
Revision report for the external LV wiring connection (flat)
Ø Price: 474.3 $ - 711.5 $
0 x
Water installation works
Plumbing – installation of water distribution systems (flat)
Ø Price: 1285.2 $ - 1927.8 $
0 x
Cutting of grooves for plumbing (concrete)
Ø Price: 72.6 $ - 109 $
0 lm
Flushing walls after plumbing installation
Ø Price: 16.6 $ - 25 $
0 lm
Installation and connection of the Geberit structure (duofix / kombifix)
Ø Price: 253.4 $ - 380.2 $
0 pcs
Installation and cutting-in of the concealed fitting
Ø Price: 232.6 $ - 348.8 $
0 x
Installation of the connection and concreting the shower gutter
Ø Price: 246.9 $ - 370.3 $
0 x
Installation and fitting of inspection access door
Ø Price: 57.1 $ - 85.7 $
0 pcs
Installation of the washbasin
Ø Price: 82.2 $ - 123.2 $
0 x
Installation of a mixing body (iBox) – concealed shower fitting
Ø Price: 238.7 $ - 358.1 $
0 x
Installation of a mixer tap – washbasin, sink
Ø Price: 42.4 $ - 63.6 $
0 x
Installation of a mixer tap – bathtub
Ø Price: 85.4 $ - 128.2 $
0 x
Installation of shower bath glass (screen)
Ø Price: 197.4 $ - 296.2 $
0 x
Installation of valve for drier and washing machine + waste
Ø Price: 125.7 $ - 188.5 $
0 x
Installation of end valves
Ø Price: 14.1 $ - 21.1 $
0 pcs
Heating works
Draining the heating system
Ø Price: 153.4 $ - 230.2 $
0 x
Dismantling and installation of the radiator
Ø Price: 576.3 $ - 864.5 $
0 pcs
Blinding the radiator
Ø Price: 209.4 $ - 314 $
0 x
Cutting-in heating pipes
Ø Price: 63.6 $ - 95.4 $
0 lm
Concreting heating pipes
Ø Price: 21.8 $ - 32.8 $
0 lm
Installation of radiator valves
Ø Price: 45.4 $ - 68.2 $
0 pcs
Filling the heating system – at the end
Ø Price: 132.2 $ - 198.2 $
0 x
Pressurising and venting the radiator
Ø Price: 46.1 $ - 69.1 $
0 pcs
Gas installation works
Cutting of grooves for gas pipe installation (brick)
Ø Price: 43.4 $ - 65 $
0 lm
Cutting of grooves for gas pipe installations (concrete)
Ø Price: 89.4 $ - 134.2 $
0 lm
Blinding the gas pipe from the meter
Ø Price: 417.4 $ - 626 $
0 x
Relocation and connection of gas pipeline
Ø Price: 414.7 $ - 622.1 $
0 x
Installation and connection of the gas boiler
Ø Price: 1377 $ - 2065.6 $
0 x
Installation and connection of the hot service water heating reservoir
Ø Price: 1256.6 $ - 1885 $
0 x
Revision report for gas
Ø Price: 438.6 $ - 658 $
0 x
Installation of the kitchen
Installation of kitchen cabinets – without appliances
Ø Price: 110.1 $ - 165.1 $
0 lm
Invisible milled joint – of a worktop
Ø Price: 131.4 $ - 197 $
0 pcs
Fitting of appliances to the kitchen unit
Ø Price: 141.9 $ - 212.9 $
0 pcs
Installation and connection of the fume hood pipe
Ø Price: 144.6 $ - 216.8 $
0 pcs
Joinery works
Installation of wooden casing door frames + door hanging
Ø Price: 145.9 $ - 218.9 $
0 pcs
Installation and fitting of wooden stair treads
Ø Price: 111.4 $ - 167.2 $
0 pcs
Installation and fitting of wooden stair treads with a riser
Ø Price: 159.8 $ - 239.6 $
0 pcs
Grinding stair treads + 3× varnishing – reconditioning the original ones
Ø Price: 70.1 $ - 105.1 $
0 pcs
Installation of stair wooden handrail
Ø Price: 34.2 $ - 51.2 $
0 lm
Interlocking paving + kerbs
Sub-base preparation – levelling bedding
Ø Price: 5.6 $ - 8.4 $
0 m²
Compacting of the sub-base using a vibratory plate
Ø Price: 12.1 $ - 18.1 $
0 m²
Laying of interlocking paving
Ø Price: 36.9 $ - 55.3 $
0 m²
Final gritting with sweeping into joints
Ø Price: 2.5 $ - 3.7 $
0 m²
Installation and fitting of kerbs in dry concrete
Ø Price: 26.6 $ - 39.8 $
0 lm
Building thermal insulation / Facade works
Covering of fillings of external openings with frames and door frames, railings, flashings
Ø Price: 5.6 $ - 8.4 $
0 m²
Installation of thermal insulation of walls with polystyrene, full gluing
Ø Price: 10.9 $ - 16.3 $
0 m²
Installation of thermal insulation of walls with mineral wool, full-surface gluing including anchoring
Ø Price: 20 $ - 30 $
0 m²
External wall plaster, thin-layered, mineral self-cleaning – scraped, in a thickness of 2 mm
Ø Price: 22.3 $ - 33.5 $
0 m²
Lintel moulding with a dripstone (PVC)
Ø Price: 3.8 $ - 5.8 $
0 lm
Window and door infinity expansion profile (plastic)
Ø Price: 8.8 $ - 13.2 $
0 lm
End profile for flashing (plastic)
Ø Price: 8.5 $ - 12.7 $
0 lm
Installation – PVC angle bead
Ø Price: 2.9 $ - 4.3 $
0 lm
Movement of building materials on the site up to a height of 10 m
Ø Price: 91.4 $ - 137 $
0 t
Coating of external walls with glass-textile grid + adhesive (double skimming)
Ø Price: 32.7 $ - 49.1 $
0 m²
Assembly, disassembly and rental of scaffolding up to 10 m of height / day
Ø Price: 10.1 $ - 15.1 $
0 m²
Carpentry constructions
Dismantling roof decking
Ø Price: 3.3 $ - 4.9 $
0 m²
Dismantling pitched roof battens
Ø Price: 5.1 $ - 7.7 $
0 m²
Dismantling pin-jointed truss structures
Ø Price: 3.7 $ - 5.5 $
0 lm
Saw timber / wood staining + cleaning
Ø Price: 6.2 $ - 9.2 $
0 m²
Installation of wooden joist ceilings
Ø Price: 10.2 $ - 15.4 $
0 lm
Installation of standard roof truss structures
Ø Price: 15.1 $ - 22.7 $
0 lm
Installation of truss with wooden tie-beams
Ø Price: 9.8 $ - 14.6 $
0 m²
Installation of sheathing paper
Ø Price: 6.6 $ - 10 $
0 m²
Installation of lathing and counter battens of roofs
Ø Price: 4.6 $ - 7 $
0 m²
Installation of a wooden decking
Ø Price: 11.9 $ - 17.9 $
0 m²
Plumbing works
Bonding of asphalt cardboard with flame – horizontal surface (1× layer)
Ø Price: 21.8 $ - 32.8 $
0 m²
Bonding of asphalt cardboard with flame – vertical surface (1× layer)
Ø Price: 34 $ - 51 $
0 m²
Facade cladding, angle standing seam system
Ø Price: 44.1 $ - 66.1 $
0 m²
Fitting of eaves gutter and gutter hooks
Ø Price: 16.7 $ - 25.1 $
0 lm
Installation of a rainwater downspout
Ø Price: 19.5 $ - 29.3 $
0 lm
Installation of external sills on reinforcing strips
Ø Price: 39.3 $ - 58.9 $
0 lm
Installation of lathing under the roof cladding on the roof truss
Ø Price: 7.4 $ - 11 $
0 m²
Installation of counter battens
Ø Price: 7.8 $ - 11.8 $
0 m²
Fitting and installation of the moisture stop
Ø Price: 5.2 $ - 7.8 $
0 m²
Double standing seam / rolled roofing installation – pitched (saddle) roof
Ø Price: 36.2 $ - 54.2 $
0 m²
Attic cladding on flat roof (along the perimeter)
Ø Price: 40.7 $ - 61.1 $
0 lm
Installation of coating waterproofing, Fatrafol PVC film (flat roof)
Ø Price: 48.5 $ - 72.7 $
0 m²
Spark test on PVC foil (flat roof)
Ø Price: 2.7 $ - 4.1 $
0 m²
Laying and installation of ceramic / concrete roof tiles
Ø Price: 55.7 $ - 83.5 $
0 m²
Spray foam insulation closed structure
Ø Price: 41.8 $ - 62.8 $
0 m²
Spray foam insulation (blown Pur insulation from 20 – 25 cm) open structure
Ø Price: 37.5 $ - 56.3 $
0 m²
Spray foam insulation (blown Pur insulation from 30 – 35 cm) open structure
Ø Price: 62.6 $ - 93.8 $
0 m²
Concreting works
Laying of asphalt insulation (IPA) together with welding of joints
Ø Price: 7 $ - 10.4 $
0 m²
Formwork installation for the cast ceiling slab – Doka, Peri system
Ø Price: 24.8 $ - 37.2 $
0 m²
Asphalt primer
Ø Price: 5 $ - 7.6 $
0 m²
Concreting the 100 mm thick foundation slab
Ø Price: 19.4 $ - 29.2 $
0 m²
Concreting the 150 mm thick foundation slab
Ø Price: 22 $ - 33 $
0 m²
Concreting the 200 mm thick foundation slab
Ø Price: 24 $ - 36 $
0 m²
Laying and installation of Welded Wire Mesh (WWM) including tying 100 × 100 mm
Ø Price: 7 $ - 10.6 $
0 m²
Fitting and laying of Welded Wire Mesh (WWM) including tying 150×150 mm
Ø Price: 11 $ - 16.4 $
0 m²
Formwork removal (disassembly) of the Doka, Peri system
Ø Price: 16.3 $ - 24.5 $
0 m²
Installation of ceramic ceiling
Ø Price: 49.7 $ - 74.5 $
0 m²
Installation of formwork for straight staircase
Ø Price: 168.3 $ - 252.5 $
0 lm
Removal of stair formwork
Ø Price: 28.9 $ - 43.3 $
0 lm
Transport + Cleaning
Delivery and carrying away the new material
Ø Price: 438.6 $ - 658 $
0 pcs
Removal of debris + waste disposal in a container
Ø Price: 571.2 $ - 856.8 $
0 x
Collection of debris in vans – if it is impossible to bring a container
Ø Price: 2.6 $ - 3.8 $
0 km
Removal of debris and waste to the container – without lift, 1 floor
Ø Price: 195.2 $ - 292.8 $
0 fl
Delivery of new building material – without lift, 1 floor
Ø Price: 261.9 $ - 392.9 $
0 fl
Cleaning of corridors and staircases 1 ×
Ø Price: 59.3 $ - 88.9 $
0 x
Final cleaning of the flat from coarse dirt (the price is without window cleaning)
Ø Price: 440.6 $ - 661 $
0 x
Movement of building materials on the site – flats, houses, buildings
Ø Price: 351.9 $ - 527.9 $
0 t
Transport and carrying away the final material (tiles, sanitary ware, parquet flooring)
Ø Price: 430.2 $ - 645.4 $
0 x
Transport and purchase of material
Ø Price: 272.3 $ - 408.5 $
0 pcs
Other
Tearing up window sills
Ø Price: 32.2 $ - 48.2 $
0 pcs
Flushing and fixing entrance doors
Ø Price: 327.4 $ - 491.2 $
0 pcs
Fixing the door passage with moulding installation – door opening
Ø Price: 167 $ - 250.6 $
0 pcs
Installation of the sliding door housing into the wall – Eclisse
Ø Price: 330.5 $ - 495.7 $
0 x
Installation and fitting of sliding doors into the housing
Ø Price: 192.8 $ - 289.2 $
0 pcs
Wall levelling (if necessary)
Ø Price: 19.3 $ - 28.9 $
0 m²
Installation of transition flooring trims
Ø Price: 27.9 $ - 41.9 $
0 pcs
Material
Container 4 m3 – mixed waste / construction debris
Ø Price: 488.6 $ - 732.8 $
0 pcs
Container 7 m3 – mixed waste / construction debris
Ø Price: 520.7 $ - 781.1 $
0 pcs
Container 9 m3 – mixed waste / construction debris
Ø Price: 620.7 $ - 931.1 $
0 pcs
Container rental / day
Ø Price: 3.6 $ - 5.4 $
0 x
Consumables for the flat: adhesives, mortar, blocks, concrete, grouting mixture
Ø Price: 2359.4 $ - 3539.2 $
0 pcs
Wall cladding / average price
Ø Price: 57 $ - 85.6 $
0 m²
Paving / average price
Ø Price: 61.8 $ - 92.8 $
0 m²
Plaster finishes, paint, corner mouldings, bonding primer
Ø Price: 2650.4 $ - 3975.6 $
0 pcs
Wiring material – for a standard flat
Ø Price: 1301.5 $ - 1952.3 $
0 pcs
Plumbing for a standard flat – toilet, kitchen, bathroom
Ø Price: 526.2 $ - 789.2 $
0 pcs
Painting materials for the apartment: paint, putty knife, primer, foil, tape
Ø Price: 1534 $ - 2301 $
0 pcs
Levelling compound up to a thickness of 2.5 cm
Ø Price: 17.4 $ - 26.2 $
0 m²
Floating laminate floor (average price)
Ø Price: 24.8 $ - 37.2 $
0 m²
Plasterboard, window corner iron, tapes, screws, finish
Ø Price: 17.4 $ - 26.2 $
0 m²
Floating wooden floor (average price)
Ø Price: 68.9 $ - 103.3 $
0 m²
ECA (Expanded Clay Aggregate)1–4 mm dry levelling sub-base using up to a thickness of 20 cm
Ø Price: 46.8 $ - 70.2 $
0 m³
RIGIDUR EE 20 floor board, screws, adhesive
Ø Price: 25.8 $ - 38.6 $
0 m²
RIGIDUR EE 25 floor board, screws, adhesive
Ø Price: 22.8 $ - 34.2 $
0 m²
Wood / saw timber material – for truss construction
Ø Price: 566.6 $ - 849.8 $
0 m³
OSB Egger 3 – construction board with a click system, thickness 22 mm
Ø Price: 57.5 $ - 86.3 $
0 pcs
Block paving – material (pavers only)
Ø Price: 32 $ - 48 $
0 m²
Carpentry fasteners – for truss construction
Ø Price: 39.4 $ - 59 $
0 m³
Carpentry fasteners and protecting means, clamps, nails, strip steel, wood screws
Ø Price: 40 $ - 60 $
0 m²
Doka formwork rental, Peri / 1 day
Ø Price: 0.3 $ - 0.5 $
0 m²
Calculation
Logo
OH
Edit In progress

Appt. renovation - Mrs. Harris, 27 Oak Street

Person

Olivia Harris

Location

27 Oak Street,
Manchester M1 4AB

Total: £26,850 Warning
Share Copy Delete
Schedule 3 min ago

Removal of tiles and paving

Quantity
56
Price
16.30 £ Edit
Total 913 £
Face Face
+1577 more

1579 professionals on NUMIQ have already created
13230 calculations for their customers

A quote for building work determines whether you win the job or not.

Your estimates, always with you

Your estimates, always with you

All your estimates live on your phone, tablet or laptop. On site and in the office. Anytime.

Has the client seen your quote?

Has the client seen your quote?

Send the estimate straight to the client. In NUMIQ you can see whether the client has viewed your estimate. Everything neatly in one place.

Win 30% more jobs.

Win 30% more jobs.

Your estimates will be detailed, polished and, above all, accurate. Become a NUMIQ professional. We’ll help you increase your win rate.

Average prices or your own rates.

Average prices or your own rates.

NUMIQ shows you market prices for building work that you can easily adjust to suit your business

Create your estimate for free

Register for free

Probably the simplest construction estimating tool in the world.

Automate quote creation and forget about tedious forms. NUMIQ uses up-to-date, accurate prices and lets you create simple estimates anyone can handle. With faster preparation, you’ll win more jobs.

Probably the simplest construction estimating tool in the world.

Keep track: see whether the client has viewed and accepted your quote.

The system lets you send quotes directly to clients, and in a clear interface you can see who opened them, asked a question, or approved the quote. Everything is in one place, so you can respond quickly and close more deals. No more quotes getting lost.

Keep track: see whether the client has viewed and accepted your quote.

Your own rates, invoicing and secure online payments in one solution.

NUMIQ lets you use average market prices or set your own price list. Create an invoice in a few clicks, and thanks to the integrated, secure payment gateway the client can pay online by card or via Stripe or PayPal. Handle the whole process from quote to paid invoice on a single platform.

Your own rates, invoicing and secure online payments in one solution.