
Heating work
Heating work
Ažurirano 01.11.2024 21:10
Heating work i njihove prednosti
Heating needs to be planned
An expert will calculate exactly what heater you need in each room to keep you comfortable
Underfloor or radiator heating?
Think carefully about which type of heating is best for you. The differences are big.
A good heating engineer comes at a price
A well-planned heating system needs to be fitted flawlessly, additional repairs are very expensive.
Ostale cene za heating work
What affects the price of heating work?
Aside from the value of experience with the expertise of the heating technician, these are the basic factors that determine the price of your heating work:
- House size: the more rooms, the larger the floor area, the more heaters, the more work and the higher the price
- Type of heating: underfloor heating is more difficult to install than radiator heating. The installation of a heat pump requires the expertise of a heating engineer. It is also easier to install an electric boiler than a gas or solid fuel boiler
In addition to selecting the appropriate type of heating, wiring and radiators, it is important to budget the dimensions of the heated space very well, not only the area, but also the height of the ceilings, the orientation of the rooms to the cardinal points, to take care of the corner (end) rooms that do not adjoin another heated space, and to take care of the correct procedure of work, so that the heating works efficiently and smoothly.
If the heating is not designed correctly, the rooms will not reach the desired temperature or the heating will be unnecessarily energy-intensive and expensive.
In this article, we will look at the key aspects to consider when renovating your heating system.
Planning and preparation of heating installation
Proper planning of the heating system is absolutely essential. It often happens that the heating system fails to heat a room in the house and other rooms overheat - so the boiler runs unnecessarily and increases costs, or even the heating system is oversized and the boiler does not reach the optimum operating temperature and does not achieve the ideal consumption.
We even encountered a situation where the heating was very slow to react to changes in the outside temperature and there were big fluctuations in the indoor temperature - it was never comfortable, just very warm or very cold.
Avoid problems you will never solve and plan well:
- Expert advice: it is important to consult a heating expert before starting any work. The heating engineer will assess the current state of the heating system, propose an optimal solution and draw up a renovation project.
- Choosing the type of heating: there is a wide range of heating systems to choose from, such as gas boilers, heat pumps, solid fuel stoves, electric heating and underfloor heating. The choice depends on various factors such as energy efficiency requirements, fuel availability, investment costs and space availability.
- Choosing radiators: radiators should match the heat output of the heating system and the size of the rooms. The design and type of material the radiators are made of is also an important factor. The choice of radiators also depends on the size of the room and the insulation of the building, also an important aspect that plays a role whether the room is an end room or adjacent to an adjacent flat, also whether it is north facing. All this must be taken into account when planning the heating and the size of the radiators.
- Obtaining permits:Depending on the extent of the renovation, it may be necessary to obtain a building permit or other permits from the relevant authorities.
Procedure of heating works:
- Removing the old heating system: before installing the new system, the old radiators, pipes and other components must be removed.
- Pipe installation: the new pipe must be installed according to the design and in compliance with the technical standards. It is important to insulate the pipe to prevent heat loss.
- Installation of radiators: the radiators are mounted on the walls or floor in accordance with the project and in compliance with the technical regulations.
- Connection to the heating system: the radiators are connected to the pipes and to the boiler.
- Commissioning:After installation is complete, the system is filled with water or other heat carrier and vented. This is followed by adjustment of the control and commissioning.
Important aspects to consider:
- Safety: when working with the heating system it is important to observe safety regulations and use protective equipment.
- Quality of materials: it is important to use quality materials and components to guarantee a long service life and trouble-free operation of the heating system.
- Expert work: heating renovation should be carried out by an experienced heating engineer with the appropriate qualifications.
- Warranty: it is important to choose a contractor who provides a warranty for the work carried out and the materials used.
How to choose between radiator and underfloor heating
Choosing the right heating system for your home is a key decision that will affect the comfort and energy efficiency of your home. Two of the most commonly used systems are radiator heating and underfloor heating.
Both systems have their advantages and disadvantages, so it is important to consider various factors when deciding which system is best for you.
In principle, we can assess that radiator heating has lower initial costs, but is more expensive to operate and underfloor heating is, on the contrary, a more economical solution in the long run.
Radiator heating
Traditional, easier to build and repair, with a lower purchase price and the advantage of faster heating of the room.
Advantages of radiator heating
- Faster response:
The radiators heat up quickly and start radiating heat immediately. This means that the room can be heated up in a relatively short time, which is particularly advantageous on cold mornings or when the temperature drops suddenly. Alternatively, for holiday properties where heating is intermittent, a radiator is a suitable medium.
- Easier installation:
Installing radiators is usually less demanding than installing underfloor heating. This is particularly true in existing buildings where extensive structural alterations are not necessary.
- Lower initial costs:
Radiator systems are often cheaper to install compared to underfloor heating. This can be a significant factor, especially if you have a limited renovation or new build budget.
Disadvantages of radiator heating
- Less even heat:
Radiators usually provide less even heat distribution in the room, which can lead to temperature differences. The surroundings of the radiator may be warmer, while more distant parts of the room remain cooler.
- Aesthetics and space:
Radiators can take up wall space and don't always fit in with the aesthetic design of an interior. They can limit furniture placement options and can be visually distracting.
- Higher operating costs:
Radiator systems can have higher running costs, especially if they are connected to older or less efficient boilers. Higher water temperatures in the system increase energy consumption.
Underfloor heating
A modern way of heating in living spaces, it creates a more pleasant temperature comfort, its operation is more economical, it does not require any radiators, but
Advantages of underfloor heating
- Even heat distribution:
Underfloor heating ensures even heat distribution throughout the room. The heat rises evenly from the floor, creating comfortable and constant temperature conditions throughout the room.
- Invisible and aesthetic:
This system is hidden under the floor, so it does not interfere with the design of the room and does not restrict the placement of furniture. It provides greater freedom in interior design and use of space.
- Energy efficiency:
Underfloor heating can be more energy efficient because it operates at lower temperatures and uses radiant heat. This can lead to lower energy bills and greater environmental sustainability.
Disadvantages of underfloor heating
- Higher initial costs:
Installing underfloor heating is usually more expensive and time-consuming, especially for renovations. It requires special materials and professional installation.
- Slower reaction:
Underfloor heating has a longer response time, which means the room heats up more slowly. This can be disadvantageous if you need to change the temperature in a room quickly.
- Complexity of repairs:
If there is a problem, repairs can be more complex and costly as they require access to the system under the floor. This may mean having to remove part of the floor, which is difficult and can disrupt your home.
Factors to consider when choosing the type of heating
- Building and floor type:
For new builds or extensive renovations, installing underfloor heating can be easier and more efficient. In existing buildings, it may be more practical and cost-effective to opt for radiator heating. Consideration should be given to whether the floor is suitable for underfloor heating, for example its thickness and type of material.
- Initial budget:
If you are on a budget, radiator heating may be a better option due to the lower initial cost. Underfloor heating requires a larger investment but can pay off in the long run.
- Energy efficiency:
If long-term energy savings are important to you, underfloor heating may be a better choice, especially if combined with modern heating systems such as heat pumps. The energy savings can offset the higher initial costs.
- Maintenance and durability:
Consider maintenance costs and potential repairs. Radiators are usually easier and cheaper to maintain, while underfloor heating can be more challenging to repair. Radiator systems may have a longer life and easier access to individual components.
- Comfort:
If you prefer even heat distribution and greater comfort, underfloor heating may be a better choice. This system creates a cosy environment with no cold spots and provides a feeling of warmth directly from the floor, which is particularly pleasant in the winter months.
The choice between radiator and underfloor heating depends on your specific needs, preferences and budget. Radiator heating is suitable for those looking for a quick solution with a lower initial cost, while underfloor heating offers greater comfort and energy efficiency, albeit at a higher initial cost and installation complexity. Carefully consider all of the above factors and consult the experts to make an informed decision that best suits your requirements.
Installation of a gas or electric boiler for hot water and heating: detailed procedure
The installation of a gas or electric boiler for water heating and heating is a complex process that should be carried out by a professionally trained and certified plumber. However, in this article we will give you an overview of the basic steps involved in the installation of such boilers.
Preparation:
- Boiler selection: Before installation, it is important to choose the right type of boiler for your needs and requirements. Consideration should be given to the boiler output, fuel type (gas or electricity), hot water tank capacity (if required) and boiler dimensions.
- Obtaining permits: for the installation of a gas boiler you must obtain a permit from the gas company. Depending on local regulations, a building permit may also be required.
- Space preparation: The space for the boiler must meet technical requirements such as sufficient ventilation, access to water and gas supply (in the case of a gas boiler) and condensate drainage.
Installation procedure:
- Boiler installation: The boiler is mounted on the wall or floor in accordance with the instructions for use and technical regulations.
- Connection to mains: the boiler is connected to the water, gas (in the case of a gas boiler) and electricity mains. Connection should be carried out by a professionally trained plumber.
- Commissioning: after the boiler is connected to the distribution system, commissioning is carried out. This includes adjusting the controls, checking the boiler for leaks and functionality.
- Inspection: after commissioning, the boiler must be inspected by an authorised person.
Important aspects:
- Safety: when installing the boiler, it is important to observe safety regulations and use protective equipment.
- Quality of materials: it is important to use quality materials and components to guarantee a long service life and trouble-free operation of the boiler.
- Expert work: the installation of the boiler should be carried out by an experienced and qualified installer.
- Warranty: it is important to choose a contractor who provides a warranty for the work carried out and the materials used.
Installation of heating distribution (new pipes) and connection of radiators
The installation of heating ductwork and the connection of radiators is a complex process that requires specialist knowledge and skills. If you do not have experience installing heating systems, it is advisable to contact a licensed plumber.
Installation procedure:
- Planning: before installation it is important to carefully plan the layout of the radiators and the routing of the pipes. Take into account the size of the room, the heat loss of the building and the desired degree of heating.
- Material selection: choose quality materials suitable for your heating system. This includes pipes, fittings, radiators, boilers and control valves.
- Preparation: before installation, you need to prepare the space. Drill the holes for the pipes and mount the brackets for the radiators.
- Pipe installation: install the pipe according to the plan. Ensure that fittings are properly connected and joints are sealed.
- Mounting the radiators: mount the radiators on the brackets and connect them to the pipes. Do not forget to install the control valves.
- Pressure test: after installation is complete, pressure test the system to check the tightness of the connections.
- Commissioning: Fill the system with water and commission the boiler. Test the heating and temperature control.
Important notes:
- Read the manufacturer's instructions for the boiler, radiators and other materials before installation.
- Observe safety regulations when working with electricity and gas.
- In the event of a water leak, turn off the system immediately and contact your plumber.
- Regularly inspect and maintain your heating system to ensure optimal functionality and efficiency.
Tools and materials:
- Drill
- The Hammer
- Keys
- Screwdrivers
- Level
- Marking tape
- Pipe shears
- Sealing tape
- Lubricant for threads
- Pipelines
- Shapes
- Radiators
- Boiler
- Control valves
Tips:
- When choosing radiators, take into account the size of the room and the heat loss.
- Ventilate rooms when painting radiators.
- Before installing the radiators, check their flatness.
- Don't forget to bleed the radiators after filling the system with water.
Additional information: in addition to the above steps, it is important to read the boiler manual and follow all the manufacturer's instructions. If you have any questions or are unsure, contact a professionally trained installer.
Conclusion: heating renovation is a complex process that requires careful planning, expertise and experience. Installing a gas or electric boiler is a complex process that requires expertise and experience. If you do not have sufficient knowledge and experience, we do not recommend that you carry out the boiler installation yourself. By following the above advice and considerations, you can ensure that your refurbishment goes smoothly and that you have a high quality and efficient heating system that will serve you for many years to come.
Advantages and comparison of gas boiler, electric boiler and heat pump
When choosing a heating system for the home, it is important to consider the different options and their advantages. Gas boilers, electric boilers and heat pumps are three popular solutions, each with their own advantages and specifics. This article provides detailed information on each of these systems and how they compare.
Gas boiler
Gas boilers are a traditional and often used solution for heating homes. Their main advantage is their high efficiency at relatively low fuel costs. Modern gas boilers are also capable of quickly heating water and heating rooms, which is particularly advantageous during cold winter days. The reliability of gas boilers is another important factor as they provide stable and consistent heating with minimal maintenance. In addition, modern technology allows for reduced emissions, contributing to a greener solution. The lower cost of a gas boiler is also an advantage.
- Efficiency: high efficiency at low fuel costs.
- Heating speed: Fast heating of water and heating spaces.
- Reliability: stable and reliable operation with minimal maintenance.
- Low emissions: modern gas boilers produce fewer harmful emissions.
Electric boiler
Electric boilers are easy to install and do not require a connection to the gas network or chimney, making them suitable for locations where gas is not available. One of the biggest advantages of electric boilers is their safety as they do not need fuel, eliminating the risk of gas leaks or carbon monoxide build-up. Electric boilers have fewer moving parts, which means less maintenance and longer equipment life.
- Ease of installation: easy to install without the need for a chimney or gas connection.
- Safety: does not require fuel, eliminating the risk of gas leaks or carbon monoxide formation.
- Low maintenance: Fewer moving parts means less maintenance required.
Heat pump
Heat pumps are a modern and energy-efficient solution that uses renewable energy sources. Their main advantage is their high efficiency, which can be up to three times higher than traditional boilers. As a result, heat pumps have lower operating costs and are environmentally friendly as they produce minimal CO2 emissions. Although they are complex and costly to install, the long-term savings and environmental benefits make them an attractive choice for many customers. However, a heat pump is several times more expensive than, for example, a gas boiler.
- Energy efficiency: higher efficiency than traditional boilers, uses renewable energy sources.
- Low operating costs: lower operating costs compared to gas and electric boilers.
- Eco-friendly: minimal CO2 emissions, environmentally friendly.
Comparison of systems
When comparing gas boilers, electric boilers and heat pumps, it is important to consider several factors. In principle, however, a heat pump is best, but a gas boiler has the lowest purchase price.
Cost of operation:
- Heat pumps are the most economical, thanks to their high energy efficiency.
- Gas boilers have medium operating costs but are cheaper to fuel.
- Electric boilers have the highest operating costs due to the higher price of electricity.
Ecological impact, legislative requirements:
- Heat pumps are the most environmentally friendly, use renewable energy sources and produce minimal emissions.
- Gas boilers, especially modern ones, have lower emissions than older models but are still dependent on fossil fuels. Their use may be restricted by legislation in the future.
- Electric boilers can be less environmentally friendly, depending on the source of electricity. If the electricity is generated from renewable sources, the ecological impact is lower.
Installation and maintenance:
- Electric boilers are the easiest to install and maintain as they do not require a gas connection or chimney.
- Gas boilers are moderately demanding to install and maintain.
- Heat pumps are the most complex to install, but their low maintenance costs and long-term savings often outweigh the initial investment.
Choosing the right heating system depends on individual needs and conditions. Each system has its advantages, so it is important to consider all factors before making a final decision.