A construction estimate  in minutes

Numbers first. Everything else after.

Construction price list 2026 → estimate your project

Pick a trade, city and enter quantities. Prices recalculate instantly.

Current region:Slovensko

Painting and decorating cost

Labor prices without material

Work nameUnitPrice/unitQuantityTotal

Preparation

Updated: 17.11.2026
m²
€5.40
lm
-
lm
€1.90
m²
€1.00
m²
€3.50
pcs
€3.50
m²
€6.50
m²
€7.50
m²
-
lm
-
Removing old wallpaper
m²
€3.50

Painting cost

Updated: 30.11.2026
m²
€2.10
m²
-
Oil-based paint application to plinth
m²
€7.50
m²
€2.90
Acetone-based stain-blocking primer for water and nicotine stains
m²
€3.80
lm
€3.00
pcs
€65.00
pcs
€2.40
m²
-

Project overheads

Updated: 26.11.2026
m²
€3.00

Other works

Updated: 24.11.2026
Post-work clean up
hr
€20.00
Other unspecified works in trade
hr
-
Total labor-

Enter at least one quantity to create a proposal

Painting and decorating cost

Painting cost

Painting and decorating - Painting
Work nameUnitFrom
Painting - basic white emulsion (2 coats)m²€2.10
Wall painting - coloured finishm²€2.80
Oil-based paint application to plinthm²€7.50
Ceiling paintingm²€2.90
Acetone-based stain-blocking primer for water and nicotine stainsm²€3.80
Painting vertical heating pipeslm€3.00
Painting cast iron radiatorspcs€65.00
Painting radiators (per section)pcs€2.40
Wallpapering wallsm²€11.50

Project overheads

Painting and decorating - Project overheads
Work nameUnitFrom
Mobile aluminium scaffold tower for high ceilingsm²€3.00

Other works

Painting and decorating - Other works
Work nameUnitFrom
Post-work clean uphr€20.00
Other unspecified works in tradehr€24.00

Flooring cost

Preparation

Flooring - Preparation
Work nameUnitFrom
Removal of existing floating flooringm²€2.80
Skirting board removalm€1.20
Removal of glued linoleum flooringm²€4.50
Grinding concrete subfloorm²€9.50
Subfloor sanding before levelling (adhesive/tar removal)m²€4.50
Subfloor priming + corner caulkingm²€3.50
Subfloor primingm²€1.90
Self-levelling compoundm²€6.90
Perimeter expansion tapelm€2.50
Expanded clay (Liapor) levelling fillm²€14.50
Install OSB boarding to floorm²€19.50
Wood fibre underlay board 20 mm (thermal and impact sound insulation)m²€23.00
Torch-on bitumen felt (1 layer)m²€32.00
Force-fit joint stitching with resin and wave connectorspc€18.00

Other works

Flooring - Other works
Work nameUnitFrom
Other unclassified workshr€20.00

Plasterboard and dry lining cost

Plasterboard systems cost

Plasterboard and dry lining - Plasterboard systems
Work nameUnitFrom
Single-layer plasterboard stud partitionm²€23.50
Double-layer plasterboard stud partitionm²€34.00
Plasterboard wall liningm²€18.00
Plasterboard flat ceilingm²€23.00
Sloped ceiling plasterboardingm²€28.00
Lay-in grid ceiling (incl. gridwork)m²€24.00
High-impact plasterboard partitionm²€24.00
Vapour barrier installation in plasterboard ceilingm²€1.40
Stud wall insulationm²€2.50
Lightweight mobile aluminium scaffold tower for high ceilingsm²€3.00
Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm)m²€4.00

Overheads

Plasterboard and dry lining - Overheads
Work nameUnitFrom
Carrying up plasterboard sheets / boardst€55.00

Other works

Plasterboard and dry lining - Other works
Work nameUnitFrom
Other unspecified work in the tradehr€28.00

Tiling cost

Wall and floor tiling cost

Tiling - Wall and floor tiling
Work nameUnitFrom
Standard wall/floor tiling up to 60 cmm²€39.00
Porcelain tiling over 60 cmm²€49.00
XL format wall/floor tiling 60×120m²€55.00
XXL format wall/floor tiling 120×260m²€102.00
Mosaic tilingm²€65.00
Natural/artificial stone / clinker tilingm²€59.00
Split face stone cladding (fences, plinth)m²€49.00
Decorative strip / Listello tilinglm€2.50
Diagonal floor tiling up to 600 mmm²€45.00
Groutingm²€1.90
Silicone groutingm²€3.60
Siliconing internal corners and edgeslm€1.90
Microcement decorative coating 2-3 mmm²€80.00
Waterjet cutting 60×60 (mitred edge)lm€5.90
Waterjet cutting 120×120 (mitred edge)lm€7.90
Waterjet cutting - tile cut-outlm€10.50
Mitred edge (installation and fitting)lm€59.00
Skirting from tileslm€6.50
Cutting holes in tilespcs€12.00
Core drilling holes in floor and porcelain tilespcs€12.50

Other works

Tiling - Other works
Work nameUnitFrom
Other unspecified workhr€40.00

Carpentry and joinery cost

Mouldings and cladding cost

Carpentry and joinery - Mouldings and cladding
Work nameUnitFrom
Remove old mouldingslm€1.50
Install skirting boardslm€6.50
Install ceiling corniceslm€5.50
Timber wall claddingm²€28.00

Window coverings cost

Carpentry and joinery - Window coverings
Work nameUnitFrom
Install curtain poles & railspcs€25.00
Install internal blindspcs€45.00
Install external roller shutters / blindspcs€65.00

Stairs and balustrades cost

Carpentry and joinery - Stairs and balustrades
Work nameUnitFrom
Install stair treadspcs€65.00
Install stair treads with riserspcs€95.00
Sand stair treads + 3 coats varnishpcs€55.00
Install timber handraillm€15.00

Windows and sills cost

Carpentry and joinery - Windows and sills
Work nameUnitFrom
Install PVC or timber windowpcs€65.00
Install external window silllm€12.00
Install internal window silllm€11.00

Furniture and shelving cost

Carpentry and joinery - Furniture and shelving
Work nameUnitFrom
Install and hang timber shelvingpcs€15.00
Install bespoke fitted wardrobehr€39.00

Kitchens cost

Carpentry and joinery - Kitchens
Work nameUnitFrom
Install kitchen unitslm€55.00
Invisible routed worktop jointpcs€60.00
Fit kitchen appliances into unitspcs€55.00
Install and connect extractor hood ductingpcs€55.00
Adjust and cut worktoplm€19.00

Other works

Carpentry and joinery - Other works
Work nameUnitFrom
Other unspecified carpentry workshr€39.00

Bricklaying and plastering cost

Bricklaying and blocklaying cost

Bricklaying and plastering - Bricklaying and blocklaying
Work nameUnitFrom
External wall construction up to 30 cm thickm²€25.00
Load-bearing external wall constructionm³€65.00
Non-load bearing external wall constructionm²€25.00

Renders and facades cost

Bricklaying and plastering - Renders and facades
Work nameUnitFrom
Application of external scratch coatm²€12.00
Application of silicone facade renderm²€15.00
Facade insulation with EPSm²€25.00

Tiling and cladding cost

Bricklaying and plastering - Tiling and cladding
Work nameUnitFrom
Plinth cladding with manufactured stonem²€35.00
Exterior natural stone claddingm²€55.00
Split stone wall cladding (fences, plinths)m²€59.00

Other works

Bricklaying and plastering - Other works
Work nameUnitFrom
Other unspecified works in tradehr€45.00

Strip-out and demolition cost

Demolition and dismantling works cost

Strip-out and demolition - Demolition and dismantling works
Work nameUnitFrom
Break out ceramic wall tilesm²€8.50
Break out floor tilesm²€9.00
Remove bathpcs€45.00
Remove WCpcs€25.00
Remove basinpcs€17.00
Demolish brick partition wall up to 150mm thickm²€15.00
Demolish solid / fair-faced brickworkm²€16.00
Demolish concrete wall / partitionm³€150.00
Demolish reinforced concrete slab up to 12 cmm²€54.00
Strip PVC or carpet floor coveringsm²€4.00
Remove floating floor (parquet, linoleum)m²€2.50
Remove door with timber framepcs€25.00
Cutting concrete and removing steel door framepcs€120.00
Break out metal door frame from concretepcs€45.00
Remove panel radiatorpcs€35.00
Remove cast iron radiatorpcs€45.00
Remove plasterboard ceiling and structurem²€9.50
Complete demolition of prefabricated bathroom corepcs€550.00
Strip old internal plasterm²€8.50
Remove kitchen unitpcs€70.00
Break out fitted wardrobepcs€50.00
Break out WC soil pipe enclosurepcs€35.00
Remove window sillspcs€10.00
Rubble removal and disposalt€130.00
Removal and disposal of asbestos / asbestos cementm²€20.00

Other works

Strip-out and demolition - Other works
Work nameUnitFrom
Other unspecified workshr€25.00
Transport and hazardous waste disposal of asbestos / transitet€245.00

Concrete cutting and core drilling cost

Concrete cutting cost

Concrete cutting and core drilling - Concrete cutting
Work nameUnitFrom
Cutting RC panel up to 10 cmlm€35.00
Cutting RC panel up to 15 cmlm€50.00
Cutting concrete walls up to 150 mm thicklm€50.00
Cutting concrete floors up to 100 mm deeplm€25.00
Core drilling holes ø up to 100 mmpc€90.00
Core drilling holes ø 100-200 mmpc€140.00
Core drilling holes ø over 200 mmpc€220.00
Forming opening in RC panel up to 10 cmpcs€75.00
Forming opening in RC panel up to 15 cmpcs€105.00
Installation of steel support structure (welded)pcs€350.00
Trimming metal door frames in RC up to 10 cmpcs€105.00
Trimming metal door frames in RC up to 15 cmpcs€125.00
Chasing for services (electrical, water)lm€15.00
Cutting out window or door openingpcs€450.00
Cutting opening in reinforced concrete panelpcs€250.00
Cutting asphalt surfaceslm€15.00

Other works

Concrete cutting and core drilling - Other works
Work nameUnitFrom
Other unspecified works in tradehr€45.00

Electrical installation cost

Electrical works cost

Electrical installation - Electrical works
Work nameUnitFrom
Data cabling installation (FTP)pcs€350.00
230V socket outlet point - first fixpcs€6.80
Switch point - first fixpcs€8.50
Lighting point - first fixpcs€8.40
230V socket / switch - second fixpcs€11.00
Pulling power cable (up to 3x2.5)lm€1.50
Pulling data/comms cable (FTP, coaxial)lm€1.20
Chasing for cable - brick / aerated concretelm€5.80
Chasing for cable - concrete / panellm€8.50
Making good walls after electrical installationlm€7.50
Install and connect consumer unitpcs€150.00
Connect 1-phase circuit breakerpcs€12.00
Connect RCD (Residual Current Device)pcs€30.00
Install and connect doorbellpcs€55.00
Connect and fit room thermostatpcs€35.00
Install LED strip with aluminium profilelm€12.00
Installation of recessed spotlight in plasterboard ceilingpcs€50.00
Install pendant light fittingpcs€55.00
Install wall-mounted light fittingpcs€14.00
Install and connect extractor fan (bathroom/WC)pcs€55.00
TV / data socket point - first fixpcs€12.00
TV / data socket - second fixpcs€50.00
Professional connection of 400V hobpcs€55.00
Install external LV connection to flatpcs€450.00

Inspections cost

Electrical installation - Inspections
Work nameUnitFrom
Electrical Installation Certificate / EICR (flat)pcs€190.00
External LV connection inspection reportpcs€250.00

Other works

Electrical installation - Other works
Work nameUnitFrom
Other unspecified electrical workshr€49.00

Plumbing cost

Plumbing works cost

Plumbing - Plumbing works
Work nameUnitFrom
Installation of wall-hung WC duct framepcs€150.00
Install and fit access panelspcs€45.00
Installation of concealed WC framepcs€120.00
Install and brick-up bathpcs€90.00
Install ceramic basinpcs€50.00
Shower tray installationpcs€130.00
Install shower enclosure glass (screen)pcs€180.00
Installation of shower enclosurepc€150.00
Install deck-mounted tappcs€35.00
Install wall-mounted bath/shower mixerpcs€65.00
Install concealed shower valve body (iBox)pcs€120.00
Install concealed mixer tappcs€90.00
Cold and hot water outlet pointpcs€35.00
Internal waste and drainage outlet pointpcs€25.00
Install washing machine/dishwasher valve and trappcs€55.00
Hang and connect electric water heater up to 120 lpcs€104.35
Install whole-house water filterpcs€55.00
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00
Hot water circulation pipeworklm€9.00
Pressure test internal water supply pipeworkhr€35.00
Chase cutting for plumbing (concrete)lm€29.00
Make good walls after plumbinglm€8.50
Install and chase in concealed valve bodypcs€95.00
Install shower channel + screed inpcs€140.00
Install stopcocks / isolation valvespcs€13.00
Install valve for dryer/washer + wastepcs€55.00
Connect pipework to cast iron waste stackpcs€55.00

Other works

Plumbing - Other works
Work nameUnitFrom
Other unspecified works in tradehr€45.00

Heating and air conditioning cost

Heating works cost

Heating and air conditioning - Heating works
Work nameUnitFrom
Remove & re-install radiator (complete)pcs€180.00
Remove gas / electric boilerpcs€110.00
Remove hot water cylinderpcs€109.00
Install & connect panel radiatorpcs€100.00
Install bathroom towel radiatorpcs€120.00
Lay underfloor heating insulation boardm²€3.50
Underfloor heating pipe installationm€4.50
Install underfloor heating manifoldpcs€300.00
Install gas condensing boilerpcs€350.00
Installation of air-to-water heat pumppc€950.00
Earth / bond heating systempcs€75.00
Replace thermostatic radiator valve (TRV)pcs€19.00
Replace return valvepcs€19.00
Install circulation pumppcs€100.00
Pre-wire for smart thermostat connectionpcs€190.00
Install & connect low-loss headerpcs€350.00
Install expansion vesselpcs€54.00
Install recirculation pipeworkpcs€160.00
Install domestic hot water (DHW) / recirculation pumppcs€35.00
Thread pipeworkpcs€55.00
Flame weld metal pipeworkpcs€20.00
Pressure test heating systemhr€130.00
Drain heating systempcs€55.00
Fill, bleed & balance heating systemhr€70.00
Pipework for radiatorslm€9.00
Flush & clean existing heating systemhr€50.00
Pipe freezingpcs€50.00
Cap off radiatorpcs€65.00
Fill heating systempcs€54.00
Chase heating pipes in floorlm€24.00
Concrete-in heating pipes in floorlm€6.50
Install radiator bracketpcs€17.00
Install thermostatic radiator valve (TRV) & headpcs€19.00
Pressurise & bleed radiatorpcs€12.00

Air conditioning cost

Heating and air conditioning - Air conditioning
Work nameUnitFrom
Split air conditioning installation (indoor/outdoor unit) up to 3m pipe runpc€299.30
Multi-split air conditioning installation (2 indoor + 1 outdoor unit, up to 3 m pipe run)set€648.50
Multi-split AC installation (3 indoor + 1 outdoor unit) incl. pipework up to 3 mset€947.80
Chasing walls for air conditioning pipeworkm€24.95
Making good chases after air conditioning pipework installationm€10.50
Electrical cable supply linem€13.50
Hole through non-load-bearing wall up to 100 mm thickea€25.00
Core drill penetration load-bearing wall up to 25 cmpc€40.00
Refrigerant pipe run extension over 3 m, 2.5 to 3.5 kW unitm€32.50
Refrigerant pipe run extension over 3 m, 5 kW unitm€36.60
Refrigerant pipe run extension over 3 m, 7 kW unitm€40.70
Lightweight mobile aluminium scaffold tower for exterior work up to 2 storeysstorey€100.00

Other works

Heating and air conditioning - Other works
Work nameUnitFrom
Other unlisted workshr€48.00

Gas installation cost

Gas installations cost

Gas installation - Gas installations
Work nameUnitFrom
Forming and welding internal gas pipinglm€18.00
Laying external gas main in groundlm€15.00
Chasing gas pipe - brickworklm€15.00
Chasing gas pipe - concretelm€35.00
Install gas ball valvepcs€15.00
Connect gas cookerpcs€55.00
Connect gas boiler (install & hook up)pcs€550.00
Boiler commissioning and set-uppcs€110.00
Blank off gas pipeworkpcs€150.00
Relocate and reconnect gas pipeworkpcs€129.00
Install DHW cylinderpcs€390.00
Gas pipeline pressure testpcs€90.00
Gas appliance inspection (safety check)pcs€170.00
Install gas leak detectorpcs€35.00
Relocate gas meterpcs€150.00

Other works

Gas installation - Other works
Work nameUnitFrom
Other unlisted works in tradehr€50.00

Additional works

Moving materials and debris

Additional works - Moving materials and debris
Work nameUnitFrom
Masking and surface protection with plastic sheeting/paperm²€1.80
Carrying materials upstairs without a lift (1 t per floor)t€50.00
Carrying debris downstairs without a lift, bagging included (1 t per floor)t€35.00
Carrying materials up by lift (1 t)t€15.00
Carrying debris down by lift, bagging included (1 t)t€15.00
Dismantling and breaking up old furniture - full apartmentt€250.00
On-site material handlinghr€15.00
Carrying drywall boards and metal studs to floort€45.00
Material procurement and deliverykm€0.85
Loading, horizontal/vertical transport, and haulage of ceramic tilest€48.50
Loading, transport and handling of laminate, vinyl and wood flooringt€48.50
Parking fee – city centre / old townday€21.75

Bricklaying and plastering cost

Bricklaying and blocklaying cost

Bricklaying and plastering - Bricklaying and blocklaying
Work nameUnitFrom
External wall construction up to 30 cm thickm²€25.00
Load-bearing external wall constructionm³€65.00
Non-load bearing external wall constructionm²€25.00

Renders and facades cost

Bricklaying and plastering - Renders and facades
Work nameUnitFrom
Application of external scratch coatm²€12.00
Application of silicone facade renderm²€15.00
Facade insulation with EPSm²€25.00

Tiling and cladding cost

Bricklaying and plastering - Tiling and cladding
Work nameUnitFrom
Plinth cladding with manufactured stonem²€35.00
Exterior natural stone claddingm²€55.00
Split stone wall cladding (fences, plinths)m²€59.00

Other works

Bricklaying and plastering - Other works
Work nameUnitFrom
Other unspecified works in tradehr€45.00

Strip-out and demolition cost

Demolition and dismantling works cost

Strip-out and demolition - Demolition and dismantling works
Work nameUnitFrom
Break out ceramic wall tilesm²€8.50
Break out floor tilesm²€9.00
Remove bathpcs€45.00
Remove WCpcs€25.00
Remove basinpcs€17.00
Demolish brick partition wall up to 150mm thickm²€15.00
Demolish solid / fair-faced brickworkm²€16.00
Demolish concrete wall / partitionm³€150.00
Demolish reinforced concrete slab up to 12 cmm²€54.00
Strip PVC or carpet floor coveringsm²€4.00
Remove floating floor (parquet, linoleum)m²€2.50
Remove door with timber framepcs€25.00
Cutting concrete and removing steel door framepcs€120.00
Break out metal door frame from concretepcs€45.00
Remove panel radiatorpcs€35.00
Remove cast iron radiatorpcs€45.00
Remove plasterboard ceiling and structurem²€9.50
Complete demolition of prefabricated bathroom corepcs€550.00
Strip old internal plasterm²€8.50
Remove kitchen unitpcs€70.00
Break out fitted wardrobepcs€50.00
Break out WC soil pipe enclosurepcs€35.00
Remove window sillspcs€10.00
Rubble removal and disposalt€130.00
Removal and disposal of asbestos / asbestos cementm²€20.00

Other works

Strip-out and demolition - Other works
Work nameUnitFrom
Other unspecified workshr€25.00
Transport and hazardous waste disposal of asbestos / transitet€245.00

Concrete works cost

Concrete works cost

Concrete works - Concrete works
Work nameUnitFrom
Pouring strip foundations into trenchm³€40.00
Laying and levelling blinding concretem²€8.00
Pouring slab foundations, 100 mm thickm²€6.80
Pouring slab foundations, 150 mm thickm²€7.80
Pouring slab foundations, 200 mm thickm²€9.50
Formwork for foundations and wallsm²€18.00
Shuttering for floor slab (Doka/Peri system)m²€12.00
Striking floor slab formworkm²€5.80
Tying reinforcement barst€350.00
Laying and tying mesh reinforcement 100×100m²€2.70
Laying and tying mesh reinforcement 150×150m²€3.00
Pouring concrete stairs including formworkm³€120.00
Erecting stair formworklm€51.00
Dismantling stair formworklm€12.00
Hand-laid floor screed up to 7 cmm²€9.00
Machine-applied screeds - cementitiousm²€10.50
Machine-applied screeds - anhydrite self-levellingm²€11.80
Installation of ceramic beam and block floorm²€20.00
Bituminous primer coatm²€3.50
Laying bitumen felt damp-proof membrane (DPM)m²€2.80
Cutting expansion jointslm€5.00
Power floating concrete floorm²€4.50
Pumping concrete mixm³€15.00

Other works

Concrete works - Other works
Work nameUnitFrom
Other unspecified works in the tradehr€40.00

Concrete cutting and core drilling cost

Concrete cutting cost

Concrete cutting and core drilling - Concrete cutting
Work nameUnitFrom
Cutting RC panel up to 10 cmlm€35.00
Cutting RC panel up to 15 cmlm€50.00
Cutting concrete walls up to 150 mm thicklm€50.00
Cutting concrete floors up to 100 mm deeplm€25.00
Core drilling holes ø up to 100 mmpc€90.00
Core drilling holes ø 100-200 mmpc€140.00
Core drilling holes ø over 200 mmpc€220.00
Forming opening in RC panel up to 10 cmpcs€75.00
Forming opening in RC panel up to 15 cmpcs€105.00
Installation of steel support structure (welded)pcs€350.00
Trimming metal door frames in RC up to 10 cmpcs€105.00
Trimming metal door frames in RC up to 15 cmpcs€125.00
Chasing for services (electrical, water)lm€15.00
Cutting out window or door openingpcs€450.00
Cutting opening in reinforced concrete panelpcs€250.00
Cutting asphalt surfaceslm€15.00

Other works

Concrete cutting and core drilling - Other works
Work nameUnitFrom
Other unspecified works in tradehr€45.00

Paving and block paving cost

Exterior elements cost

Paving and block paving - Exterior elements
Work nameUnitFrom
Installation of palisades up to 50 cmpcs€4.50
Installation of palisades over 50 cmpcs€6.50
Construction of exterior steps from palisadeslm€39.00
Installation of timber / WPC deckingm²€32.50

Drainage cost

Paving and block paving - Drainage
Work nameUnitFrom
Installation of drainage channel into concretelm€6.80

Other works

Paving and block paving - Other works
Work nameUnitFrom
Other unspecified paving workshr€39.00

Foundations and fencing cost

Foundations cost

Foundations and fencing - Foundations
Work nameUnitFrom
Concrete foundation for fencem³€70.00

Fencing cost

Foundations and fencing - Fencing
Work nameUnitFrom
Laying concrete fence blockspcs€4.00
Building fence pierslm€22.00
Install concrete fencing up to 1.8 mlm€20.00
Install concrete fencing up to 2.1 mlm€23.00
Install concrete fencing up to 2.4 mlm€24.00
Fencing with DT 12/15 blocksm²€15.00
Fencing with DT 20/25 blocksm²€17.00
Remove old fencinglm€8.80
Install fence post up to 2.4 mpcs€25.00
Install fence post up to 2.7 mpcs€28.00
Install fence post up to 3.8 mpcs€35.00
Install fence strut up to 2.7 mpcs€1.70
Install barbed wire extension armpcs€1.40
Tension straining wirelm€0.50
Tension barbed wirelm€0.75
Install fence framepcs€55.00
Install bespoke fence framepcs€69.00
Install fence panelspcs€85.00
Install mesh fencing up to 1.4 mlm€2.50
Install mesh fencing up to 1.8 mlm€2.70
Install mesh fencing over 3.0 mlm€3.70
Blockwork corner bondingpcs€1.00

Other works

Foundations and fencing - Other works
Work nameUnitFrom
Other unspecified work in tradehr€25.00

Insulation cost

Other works

Insulation - Other works
Work nameUnitFrom
Other unspecified trade workshr€50.00
Façade scaffolding erectionm²€4.50
Scaffolding dismantling after external wall insulationm²€2.20
Scaffolding hire 100 m²day€14.95
Scaffolding hire 300 m²day€45.00
Scaffolding hire 1000 m²day€100.00

Roof plumbing and sheet metal cost

Gutters and downpipes cost

Roof plumbing and sheet metal - Gutters and downpipes
Work nameUnitFrom
Install guttering (eaves)lm€9.50
Install gutter bracketpcs€9.00
Install downpipelm€9.00
Install downpipe clippcs€3.50
Install gutter outletpcs€12.00

Dismantling cost

Roof plumbing and sheet metal - Dismantling
Work nameUnitFrom
Removal of gutters and downpipes incl. bracketsm€4.50
Removal of ridge tiles, verge trims, chimney flashings and valley gutterslm€5.50
Removal of sheet metal roofingm²€4.50
Remove roof tiles (clay or concrete)m²€8.50
Strip roof battens incl. de-nailingm²€2.70
Roof truss dismantlingm²€14.50
Removal of metal sheet roofing - unscrewing and lowering sheetsm²€6.00

Roofs and coverings cost

Roof plumbing and sheet metal - Roofs and coverings
Work nameUnitFrom
Timber roof truss installation (load-bearing structure)m²€20.00
Install battening for tiled roofm²€3.50
Install counter-batteningm²€3.90
Install vapour barrierm²€2.90
Cladding facade - standing seamm²€20.00
Lock seam / standing seam metal roof coveringm²€19.00
Install PVC waterproofing membrane (flat roof)m²€17.00
Spark test PVC membrane (flat roof)m²€1.50
Lay ceramic/concrete tile coveringm²€30.00

Waterproofing cost

Roof plumbing and sheet metal - Waterproofing
Work nameUnitFrom
Torch-on felt, horizontal surface (1x layer)m²€9.20
Torch-on felt, vertical surface (1x layer)m²€15.00

Window sills cost

Roof plumbing and sheet metal - Window sills
Work nameUnitFrom
Window sill flashinglm€16.00

Roofs and parapets cost

Roof plumbing and sheet metal - Roofs and parapets
Work nameUnitFrom
Flat roof parapet cappinglm€19.00
Roof cleaning and paintingm²€12.00

Flashing cost

Roof plumbing and sheet metal - Flashing
Work nameUnitFrom
Chimney flashinglm€22.00
Wall / penetration flashinglm€16.00
Capping wall / gablelm€18.00
Install drip edgelm€10.00

Other works

Roof plumbing and sheet metal - Other works
Work nameUnitFrom
Other unspecified workhr€40.00

Excavation and groundworks cost

Excavations cost

Excavation and groundworks - Excavations
Work nameUnitFrom
Manual excavation (soil class 1-2)m³€25.00
Manual excavation up to 1m depth (soil class 3)m³€32.00
Manual excavation up to 1m depth (soil class 4)m³€40.00
Mechanical strip foundation excavation (width from 50 cm)m³€15.00
Mechanical pad foundation excavation (width from 80 cm)m³€25.00
Mechanical bulk excavationm³€12.00
Mechanical trenching for utilitieslm€7.50
Hand trimming of strip foundation up to 1m depthlm€12.00
Hand trimming of pad foundation up to 1m depthm²€13.00
Hand trimming of formation levelm²€5.00
Hand auger excavation up to 25 cm diameterpcs€4.50
Hand auger excavation up to 35 cm diameterpcs€6.50

Backfilling and compaction cost

Excavation and groundworks - Backfilling and compaction
Work nameUnitFrom
Backfill with soil and compactionm³€30.00
Backfill with gravel / crushed aggregatem³€10.00
Fills with sand-gravel + compactionm³€9.50
Sub-base compaction with vibratory platem²€3.50
Compaction with vibratory rollerm²€2.80

Waste removal

Excavation and groundworks - Waste removal
Work nameUnitFrom
Spoil removal (incl. loading)m³€10.00
Soil removal / Sand-gravel deliverykm€3.50

Shoring cost

Excavation and groundworks - Shoring
Work nameUnitFrom
Trench shoring up to 2m depthm²€20.00

Other works

Excavation and groundworks - Other works
Work nameUnitFrom
Other unspecified workshr€22.00

Roof carpentry cost

Dismantling cost

Roof carpentry - Dismantling
Work nameUnitFrom
Dismantle old roof trussm²€12.00
Dismantle roof sarkingm²€1.60
Dismantle pitched roof battensm²€2.70
Dismantle framed roof structureslm€1.90

Insulation cost

Roof carpentry - Insulation
Work nameUnitFrom
Lay vapour barrierm²€2.00
Lay roofing underlay (membrane under covering)m²€2.90

Treatment

Roof carpentry - Treatment
Work nameUnitFrom
Staining timber / wood + cleaningm²€2.50
Timber impregnation (coating / spray)m²€3.50

Other works

Roof carpentry - Other works
Work nameUnitFrom
Other unspecified carpentry workshr€29.00

Shading and blinds cost

Shading and blinds cost

Shading and blinds - Shading and blinds
Work nameUnitFrom
External surface-mounted roller shutters - PVC / aluminiumm²€35.00
External wooden roller shuttersm²€45.00
External venetian blindsm²€45.00
Zip screen blinds, PVC-coated fibreglass, wind-resistantm²€45.00
Bioclimatic aluminium pergola with louvred roofm²€85.00
Retractable folding arm awningpc€145.00
Traditional window shutters (wood / aluminium) - hinged, solid or louvredm²€65.00
Natural screening roll (bamboo, reed, willow)m²€8.50
Fixed brise-soleil / architectural solar shading for commercial buildingsm²€55.00

Removal of shading systems cost

Shading and blinds - Removal of shading systems
Work nameUnitFrom
Removal of external venetian blindspc€15.00
Zip screen blind removalpc€25.00
Dismantling folding arm and retractable awningspc€50.00
Pergola removalea€300.00
Removal of traditional window shutterpc€12.50

Additional works

Moving materials and debris

Additional works - Moving materials and debris
Work nameUnitFrom
Masking and surface protection with plastic sheeting/paperm²€1.80
Carrying materials upstairs without a lift (1 t per floor)t€50.00
Carrying debris downstairs without a lift, bagging included (1 t per floor)t€35.00
Carrying materials up by lift (1 t)t€15.00
Carrying debris down by lift, bagging included (1 t)t€15.00
Dismantling and breaking up old furniture - full apartmentt€250.00
On-site material handlinghr€15.00
Carrying drywall boards and metal studs to floort€45.00
Material procurement and deliverykm€0.85
Loading, horizontal/vertical transport, and haulage of ceramic tilest€48.50
Loading, transport and handling of laminate, vinyl and wood flooringt€48.50
Parking fee – city centre / old townday€21.75

See proposals you can now send to your own customers

Pricebook for construction workDon't need the Estimator? Build proposals straight from the pricebook.

Project calculator for contractors

The Estimator prices your project

A few clicks and you have a real estimate. No strings attached.

Step 1 of 6: Painting location

Painting location

Painting labour rates vary by region. Based on your city, we'll estimate the average market hourly rate in your area.

To determine market rates, we need to know where the painting work will be carried out. Enter the city for the project. You can then adjust, add, or remove individual prices.

Why contractors love NUMIQ

All your estimates in one place - always at hand.

23 trades

Bathrooms, kitchens, flooring, painting, electrical, masonry and more - NUMIQ prices them for you, you just review.

Proposals that sell

Generate a document you can be proud of with one click. The client gets it - you get the job.

Share in 10 seconds

Send a link, an email or download a PDF - whichever you prefer.

Estimate from a floor plan

Upload a floor plan of a flat or house and NUMIQ recognises the rooms, dimensions and work involved. Your whole flat is priced in a few minutes.

More yeses from clients

A professional-looking proposal is more likely to convert. Simple.

Margin under control

NUMIQ tracks unknowns and warns you before the project goes over budget.

How it works

Three steps and you know what it will cost

01

Enter the project

Upload a floor plan of the whole flat or photos of a room, let the Estimator guide you, or pick the work straight from the price list.

02

NUMIQ prices it

You have an estimate instantly. Want to tweak? No problem.

03

A professional proposal

Every job and material with its price, clearly laid out. Share it with a link or download it as a PDF.

No hidden fees

Plans differ by the number of active estimates, access to all pricebook prices, and NUMIQ estimates from floor plans and photos.

FREE

For testing with one active estimate

€0/mo + VAT
1 active calculation
Estimator
PDF export
Selected pricebook prices are locked

START

For tradespeople ready to grow

€9/mo + VAT
1 active calculation
Estimator
Estimate from a floor plan
Estimate from photos
PDF export
All pricebook prices unlocked
Most popular

PRO

Handle more jobs

€19/mo + VAT
20 active calculations
Estimator
Estimate from a floor plan
Estimate from photos
PDF export
All pricebook prices unlocked

MAX

For professionals with high volume

€49/mo + VAT
99 active calculations
Estimator
Estimate from a floor plan
Estimate from photos
PDF export
All pricebook prices unlocked
OPEN€5 / 5 daysFloor-plan estimate included

OPEN unlocks all pricebook prices and NUMIQ estimates from floor plans and photos for 5 days. It is a one-off unlock - handy for a single job that does not need a monthly subscription.