NUMIQ is a construction price list. It produces accurate estimates for 23 trades - bathrooms, kitchens, flooring, electrical, masonry, heating and more.
Pick a trade, city and enter quantities. Prices recalculate instantly.
Labor prices without material
| Work name | Unit | Price/unit | Quantity | Total | |
|---|---|---|---|---|---|
| PreparationUpdated: 26.10.2026 | |||||
| m² | 5,40 € Didn't match your prices? Click the pencil to set your own price. We remember it in this browser - next visit you'll see your prices. | - | |||
| lm | - | ||||
| lm | 1,90 € | - | |||
| m² | 1,00 € | - | |||
| m² | 3,50 € | - | |||
Local crack repairs and patching | pcs | 3,50 € | - | ||
| m² | 6,50 € | - | |||
| m² | 7,50 € | - | |||
| m² | - | ||||
| lm | - | ||||
Removing old wallpaper | m² | 3,50 € | - | ||
| PaintingUpdated: 22.10.2026 | |||||
| m² | 2,10 € | - | |||
| m² | - | ||||
Oil-based paint application to plinth | m² | 7,50 € | - | ||
Ceiling painting | m² | 2,90 € | - | ||
| lm | 3,00 € | - | |||
Painting cast iron radiators | pcs | 65,00 € | - | ||
| pcs | 2,40 € | - | |||
| m² | - | ||||
| Project overheadsUpdated: 22.10.2026 | |||||
Mobile aluminium scaffold tower for high ceilings | m² | 3,00 € | - | ||
| Other worksUpdated: 23.10.2026 | |||||
Post-work clean up | hr | 20,00 € | - | ||
Other unspecified works in trade | hr | - | |||
| Total labor- | |||||
Enter at least one quantity to create a proposal
| Work name | Unit | From |
|---|---|---|
| Painting - basic white emulsion (2 coats) | m² | 2,10 € |
| Wall painting - coloured finish | m² | 2,80 € |
| Oil-based paint application to plinth | m² | 7,50 € |
| Ceiling painting | m² | 2,90 € |
| Painting vertical heating pipes | lm | 3,00 € |
| Painting cast iron radiators | pcs | 65,00 € |
| Painting radiators (per section) | pcs | 2,40 € |
| Wallpapering walls | m² | 11,50 € |
| Work name | Unit | From |
|---|---|---|
| Scraping off old oil-based paint | m² | 5,40 € |
| Crack bridging and repair of large cracks | lm | 3,00 € |
| Acrylic sealing of joints | lm | 1,90 € |
| Priming walls and ceilings | m² | 1,00 € |
| Scraping off old (water-based) paint | m² | 3,50 € |
| Local crack repairs and patching | pcs | 3,50 € |
| Skimming walls | m² | 6,50 € |
| Skimming ceilings | m² | 7,50 € |
| Venetian plaster - polished finish | m² | 49,00 € |
| Fitting corner beads | lm | 2,90 € |
| Removing old wallpaper | m² | 3,50 € |
| Work name | Unit | From |
|---|---|---|
| Mobile aluminium scaffold tower for high ceilings | m² | 3,00 € |
| Work name | Unit | From |
|---|---|---|
| Post-work clean up | hr | 20,00 € |
| Other unspecified works in trade | hr | 24,00 € |
| Work name | Unit | From |
|---|---|---|
| Remove old nailed/glued wood parquet flooring | m² | 12,00 € |
| Careful removal of old parquet to laying plan | m² | 5,10 € |
| Install laminate flooring | m² | 12,50 € |
| Install click vinyl flooring | m² | 15,50 € |
| Install click/lock engineered wood flooring | m² | 12,50 € |
| Full-bond solid/engineered wood flooring | m² | 12,00 € |
| Install underfloor heating (electric mat) | m² | 15,00 € |
| Install parquet blocks | m² | 25,00 € |
| Install Chevron parquet flooring | m² | 29,00 € |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | 19,50 € |
| Sand and 3x lacquer parquet flooring | m² | 25,00 € |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | 30,00 € |
| Install skirting boards | lm | 4,00 € |
| Caulking around skirting boards | lm | 1,90 € |
| Install transition strips | pcs | 8,00 € |
| Work name | Unit | From |
|---|---|---|
| Dry screed installation up to 200 mm - expanded clay | m² | 18,00 € |
| Installing Rigidur gypsum fibre floor panels, adhesive-bonded | m² | 12,50 € |
| Polyurethane decorative poured floor | m² | 55,00 € |
| Epoxy poured floor up to 4mm | m² | 60,00 € |
| Epoxy poured floor with Terrazzo/Marble pattern | m² | 75,00 € |
| Work name | Unit | From |
|---|---|---|
| Removal of existing floating flooring | m² | 2,80 € |
| Skirting board removal | m | 1,20 € |
| Removal of glued linoleum flooring | m² | 4,50 € |
| Grinding concrete subfloor | m² | 9,50 € |
| Subfloor sanding before levelling (adhesive/tar removal) | m² | 4,50 € |
| Subfloor priming + corner caulking | m² | 3,50 € |
| Subfloor priming | m² | 1,90 € |
| Self-levelling compound | m² | 6,90 € |
| Perimeter expansion tape | lm | 2,50 € |
| Expanded clay (Liapor) levelling fill | m² | 14,50 € |
| Install OSB boarding to floor | m² | 19,50 € |
| Wood fibre underlay board 20 mm (thermal and impact sound insulation) | m² | 23,00 € |
| Torch-on bitumen felt (1 layer) | m² | 32,00 € |
| Force-fit joint stitching with resin and wave connectors | pc | 18,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unclassified works | hr | 20,00 € |
| Work name | Unit | From |
|---|---|---|
| Single-layer plasterboard stud partition | m² | 23,50 € |
| Double-layer plasterboard stud partition | m² | 34,00 € |
| Plasterboard wall lining | m² | 18,00 € |
| Plasterboard flat ceiling | m² | 23,00 € |
| Sloped ceiling plasterboarding | m² | 28,00 € |
| Lay-in grid ceiling (incl. gridwork) | m² | 24,00 € |
| High-impact plasterboard partition | m² | 24,00 € |
| Vapour barrier installation in plasterboard ceiling | m² | 1,40 € |
| Stud wall insulation | m² | 2,50 € |
| Lightweight mobile aluminium scaffold tower for high ceilings | m² | 3,00 € |
| Work name | Unit | From |
|---|---|---|
| Plasterboard corner beads | lm | 2,50 € |
| Applying acrylic sealant to plasterboard joints and corners | lm | 1,10 € |
| Access hatches | pcs | 45,00 € |
| Cut-outs for light fittings in plasterboard | pcs | 11,50 € |
| Door frame reinforcement in plasterboard partition with UA profiles | pcs | 61,00 € |
| Plasterboard niches and shelving | pcs | 55,00 € |
| Bespoke termination for LED strip / curtain track | lm | 24,00 € |
| Work name | Unit | From |
|---|---|---|
| Carrying up plasterboard sheets / boards | t | 55,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified work in the trade | hr | 28,00 € |
| Work name | Unit | From |
|---|---|---|
| Standard wall/floor tiling up to 60 cm | m² | 39,00 € |
| Porcelain tiling over 60 cm | m² | 49,00 € |
| XL format wall/floor tiling 60×120 | m² | 55,00 € |
| XXL format wall/floor tiling 120×260 | m² | 102,00 € |
| Mosaic tiling | m² | 65,00 € |
| Natural/artificial stone / clinker tiling | m² | 59,00 € |
| Split face stone cladding (fences, plinth) | m² | 49,00 € |
| Decorative strip / Listello tiling | lm | 2,50 € |
| Diagonal floor tiling up to 600 mm | m² | 45,00 € |
| Grouting | m² | 1,90 € |
| Silicone grouting | m² | 3,60 € |
| Siliconing internal corners and edges | lm | 1,90 € |
| Microcement decorative coating 2-3 mm | m² | 80,00 € |
| Waterjet cutting 60×60 (mitred edge) | lm | 5,90 € |
| Waterjet cutting 120×120 (mitred edge) | lm | 7,90 € |
| Waterjet cutting - tile cut-out | lm | 10,50 € |
| Mitred edge (installation and fitting) | lm | 59,00 € |
| Skirting from tiles | lm | 6,50 € |
| Cutting holes in tiles | pcs | 12,00 € |
| Core drilling holes in floor and porcelain tiles | pcs | 12,50 € |
| Work name | Unit | From |
|---|---|---|
| Bath installation (tiling work) | pcs | 61,00 € |
| Bath boxing-in and waste connection | pcs | 75,00 € |
| Shower tray step construction and sloping | pcs | 95,00 € |
| WC concealed cistern frame installation + boxing in | pcs | 130,00 € |
| Close coupled WC installation | pcs | 45,00 € |
| Bath / shower mixer tap installation | pcs | 55,00 € |
| Basin installation | pcs | 35,00 € |
| Basin mixer tap installation | pcs | 25,00 € |
| Installation of glass screen on shower tray | pc | 95,00 € |
| Installation of walk-in shower glass screen with U-channel | pc | 190,00 € |
| Installation of glass bath screen | pc | 85,00 € |
| Vanity unit installation | pcs | 60,00 € |
| Fixing mirror with adhesive | pcs | 50,00 € |
| Work name | Unit | From |
|---|---|---|
| Primer application before tiling | m² | 1,90 € |
| Waterproofing (bathroom) | m² | 7,00 € |
| Installation of waterproofing sealing tape in corners | lm | 8,70 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified work | hr | 40,00 € |
| Work name | Unit | From |
|---|---|---|
| Remove old mouldings | lm | 1,50 € |
| Install skirting boards | lm | 6,50 € |
| Install ceiling cornices | lm | 5,50 € |
| Timber wall cladding | m² | 28,00 € |
| Work name | Unit | From |
|---|---|---|
| Install curtain poles & rails | pcs | 25,00 € |
| Install internal blinds | pcs | 45,00 € |
| Install external roller shutters / blinds | pcs | 65,00 € |
| Work name | Unit | From |
|---|---|---|
| Install interior doors | pcs | 65,00 € |
| Install door lining & hang door | pcs | 75,00 € |
| Install sliding door pocket frame (Eclisse) | pcs | 150,00 € |
| Install sliding door into pocket frame | pcs | 75,00 € |
| Work name | Unit | From |
|---|---|---|
| Install stair treads | pcs | 65,00 € |
| Install stair treads with risers | pcs | 95,00 € |
| Sand stair treads + 3 coats varnish | pcs | 55,00 € |
| Install timber handrail | lm | 15,00 € |
| Work name | Unit | From |
|---|---|---|
| Install PVC or timber window | pcs | 65,00 € |
| Install external window sill | lm | 12,00 € |
| Install internal window sill | lm | 11,00 € |
| Work name | Unit | From |
|---|---|---|
| Install and hang timber shelving | pcs | 15,00 € |
| Install bespoke fitted wardrobe | hr | 39,00 € |
| Work name | Unit | From |
|---|---|---|
| Install kitchen units | lm | 55,00 € |
| Invisible routed worktop joint | pcs | 60,00 € |
| Fit kitchen appliances into units | pcs | 55,00 € |
| Install and connect extractor hood ducting | pcs | 55,00 € |
| Adjust and cut worktop | lm | 19,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified carpentry works | hr | 39,00 € |
| Work name | Unit | From |
|---|---|---|
| Partition walling up to 12.5 cm (brick/Ytong) | m² | 19,00 € |
| Walling up to 30 cm (Porotherm, Ytong) | m² | 25,00 € |
| Wall and floor primer application | m² | 1,90 € |
| Mesh reinforcement for internal blockwork | m² | 11,50 € |
| Wall repairs (Rimano, Rotband) | m² | 8,90 € |
| Wall plastering (base coat) | m² | 14,50 € |
| Fine lime-cement render (Feinputz) | m² | 9,50 € |
| Stucco render | m² | 9,50 € |
| Machine-applied renders (lime-cement) | m² | 12,50 € |
| Gypsum / skim plaster | m² | 12,00 € |
| External renders | m² | 15,50 € |
| Lintel installation | pcs | 25,00 € |
| Block up openings | m² | 25,00 € |
| Chimney construction (chamotte + ceramic liner) | lm | 55,00 € |
| Schiedel-type chimney construction | lm | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| External wall construction up to 30 cm thick | m² | 25,00 € |
| Load-bearing external wall construction | m³ | 65,00 € |
| Non-load bearing external wall construction | m² | 25,00 € |
| Work name | Unit | From |
|---|---|---|
| Application of external scratch coat | m² | 12,00 € |
| Application of silicone facade render | m² | 15,00 € |
| Facade insulation with EPS | m² | 25,00 € |
| Work name | Unit | From |
|---|---|---|
| Cladding plinth with artificial stone | m² | 35,00 € |
| External cladding with natural stone | m² | 55,00 € |
| Cladding with split-face stone (fences, plinth) | m² | 59,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works in trade | hr | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| Break out ceramic wall tiles | m² | 8,50 € |
| Break out floor tiles | m² | 9,00 € |
| Remove bath | pcs | 45,00 € |
| Remove WC | pcs | 25,00 € |
| Remove basin | pcs | 17,00 € |
| Demolish brick partition wall up to 150mm thick | m² | 15,00 € |
| Demolish solid / fair-faced brickwork | m² | 16,00 € |
| Demolish concrete wall / partition | m³ | 150,00 € |
| Demolish reinforced concrete slab up to 12 cm | m² | 54,00 € |
| Strip PVC or carpet floor coverings | m² | 4,00 € |
| Remove floating floor (parquet, linoleum) | m² | 2,50 € |
| Remove door with timber frame | pcs | 25,00 € |
| Cutting concrete and removing steel door frame | pcs | 120,00 € |
| Break out metal door frame from concrete | pcs | 45,00 € |
| Remove panel radiator | pcs | 35,00 € |
| Remove cast iron radiator | pcs | 45,00 € |
| Remove plasterboard ceiling and structure | m² | 9,50 € |
| Complete demolition of prefabricated bathroom core | pcs | 550,00 € |
| Strip old internal plaster | m² | 8,50 € |
| Remove kitchen unit | pcs | 70,00 € |
| Break out fitted wardrobe | pcs | 50,00 € |
| Break out WC soil pipe enclosure | pcs | 35,00 € |
| Remove window sills | pcs | 10,00 € |
| Rubble removal and disposal | t | 130,00 € |
| Removal and disposal of asbestos / asbestos cement | m² | 20,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works | hr | 25,00 € |
| Transport and hazardous waste disposal of asbestos / transite | t | 245,00 € |
| Work name | Unit | From |
|---|---|---|
| Cutting RC panel up to 10 cm | lm | 35,00 € |
| Cutting RC panel up to 15 cm | lm | 50,00 € |
| Cutting concrete walls up to 150 mm thick | lm | 50,00 € |
| Cutting concrete floors up to 100 mm deep | lm | 25,00 € |
| Core drilling holes ø up to 100 mm | pc | 90,00 € |
| Core drilling holes ø 100-200 mm | pc | 140,00 € |
| Core drilling holes ø over 200 mm | pc | 220,00 € |
| Forming opening in RC panel up to 10 cm | pcs | 75,00 € |
| Forming opening in RC panel up to 15 cm | pcs | 105,00 € |
| Installation of steel support structure (welded) | pcs | 350,00 € |
| Trimming metal door frames in RC up to 10 cm | pcs | 105,00 € |
| Trimming metal door frames in RC up to 15 cm | pcs | 125,00 € |
| Chasing for services (electrical, water) | lm | 15,00 € |
| Cutting out window or door opening | pcs | 450,00 € |
| Cutting opening in reinforced concrete panel | pcs | 250,00 € |
| Cutting asphalt surfaces | lm | 15,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works in trade | hr | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| Electrical installation for studio flat - first fix + second fix | pcs | 1 200,00 € |
| Electrical installation for 1-bed flat - first fix + second fix | pcs | 1 400,00 € |
| Electrical installation for 2-bed flat - first fix + second fix | pcs | 1 550,00 € |
| Electrical installation for 3-bed flat - first fix + second fix | pcs | 1 800,00 € |
| Electrical installation for 4-bed flat - first fix + second fix | pcs | 2 350,00 € |
| Work name | Unit | From |
|---|---|---|
| Data cabling installation (FTP) | pcs | 350,00 € |
| 230V socket outlet point - first fix | pcs | 6,80 € |
| Switch point - first fix | pcs | 8,50 € |
| Lighting point - first fix | pcs | 8,40 € |
| 230V socket / switch - second fix | pcs | 11,00 € |
| Pulling power cable (up to 3x2.5) | lm | 1,50 € |
| Pulling data/comms cable (FTP, coaxial) | lm | 1,20 € |
| Chasing for cable - brick / aerated concrete | lm | 5,80 € |
| Chasing for cable - concrete / panel | lm | 8,50 € |
| Making good walls after electrical installation | lm | 7,50 € |
| Install and connect consumer unit | pcs | 150,00 € |
| Connect 1-phase circuit breaker | pcs | 35,00 € |
| Connect RCD (Residual Current Device) | pcs | 12,00 € |
| Install and connect doorbell | pcs | 55,00 € |
| Connect and fit room thermostat | pcs | 35,00 € |
| Install LED strip with aluminium profile | lm | 12,00 € |
| Installation of recessed spotlight in plasterboard ceiling | pcs | 50,00 € |
| Install pendant light fitting | pcs | 55,00 € |
| Install wall-mounted light fitting | pcs | 14,00 € |
| Install and connect extractor fan (bathroom/WC) | pcs | 55,00 € |
| TV / data socket point - first fix | pcs | 12,00 € |
| TV / data socket - second fix | pcs | 50,00 € |
| Professional connection of 400V hob | pcs | 55,00 € |
| Install external LV connection to flat | pcs | 450,00 € |
| Work name | Unit | From |
|---|---|---|
| Electrical Installation Certificate / EICR (flat) | pcs | 190,00 € |
| External LV connection inspection report | pcs | 250,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified electrical works | hr | 49,00 € |
| Work name | Unit | From |
|---|---|---|
| Installation of wall-hung WC duct frame | pcs | 150,00 € |
| Install and fit access panels | pcs | 45,00 € |
| Installation of concealed WC frame | pcs | 120,00 € |
| Install and brick-up bath | pcs | 90,00 € |
| Install ceramic basin | pcs | 50,00 € |
| Shower tray installation | pcs | 130,00 € |
| Install shower enclosure glass (screen) | pcs | 180,00 € |
| Installation of shower enclosure | pc | 150,00 € |
| Install deck-mounted tap | pcs | 35,00 € |
| Install wall-mounted bath/shower mixer | pcs | 65,00 € |
| Install concealed shower valve body (iBox) | pcs | 120,00 € |
| Install concealed mixer tap | pcs | 90,00 € |
| Cold and hot water outlet point | pcs | 35,00 € |
| Internal waste and drainage outlet point | pcs | 25,00 € |
| Install washing machine/dishwasher valve and trap | pcs | 55,00 € |
| Hang and connect electric water heater up to 120 l | pcs | 190,00 € |
| Install whole-house water filter | pcs | 55,00 € |
| Installation of domestic sewage treatment plant / septic tank on gravel bed | pc | 600,00 € |
| Hot water circulation pipework | lm | 9,00 € |
| Pressure test internal water supply pipework | hr | 35,00 € |
| Chase cutting for plumbing (concrete) | lm | 29,00 € |
| Make good walls after plumbing | lm | 8,50 € |
| Install and chase in concealed valve body | pcs | 95,00 € |
| Install shower channel + screed in | pcs | 140,00 € |
| Install stopcocks / isolation valves | pcs | 13,00 € |
| Install valve for dryer/washer + waste | pcs | 55,00 € |
| Connect pipework to cast iron waste stack | pcs | 55,00 € |
| Work name | Unit | From |
|---|---|---|
| Plumbing pipework installation for flat (WC, bathroom, kitchen) | pcs | 850,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works in trade | hr | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| Split air conditioning installation (indoor/outdoor unit) up to 3m pipe run | pc | 299,30 € |
| Multi-split air conditioning installation (2 indoor + 1 outdoor unit, up to 3 m pipe run) | set | 648,50 € |
| Multi-split AC installation (3 indoor + 1 outdoor unit) incl. pipework up to 3 m | set | 947,80 € |
| Chasing walls for air conditioning pipework | m | 24,95 € |
| Making good chases after air conditioning pipework installation | m | 10,50 € |
| Electrical cable supply line | m | 13,50 € |
| Hole through non-load-bearing wall up to 100 mm thick | ea | 25,00 € |
| Core drill penetration load-bearing wall up to 25 cm | pc | 40,00 € |
| Refrigerant pipe run extension over 3 m, 2.5 to 3.5 kW unit | m | 32,50 € |
| Refrigerant pipe run extension over 3 m, 5 kW unit | m | 36,60 € |
| Refrigerant pipe run extension over 3 m, 7 kW unit | m | 40,70 € |
| Lightweight mobile aluminium scaffold tower for exterior work up to 2 storeys | storey | 100,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unlisted works | hr | 48,00 € |
| Work name | Unit | From |
|---|---|---|
| Forming and welding internal gas piping | lm | 18,00 € |
| Laying external gas main in ground | lm | 15,00 € |
| Chasing gas pipe - brickwork | lm | 15,00 € |
| Chasing gas pipe - concrete | lm | 35,00 € |
| Install gas ball valve | pcs | 15,00 € |
| Connect gas cooker | pcs | 55,00 € |
| Connect gas boiler (install & hook up) | pcs | 550,00 € |
| Boiler commissioning and set-up | pcs | 110,00 € |
| Blank off gas pipework | pcs | 150,00 € |
| Relocate and reconnect gas pipework | pcs | 129,00 € |
| Install DHW cylinder | pcs | 390,00 € |
| Gas pipeline pressure test | pcs | 90,00 € |
| Gas appliance inspection (safety check) | pcs | 170,00 € |
| Install gas leak detector | pcs | 35,00 € |
| Relocate gas meter | pcs | 150,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unlisted works in trade | hr | 50,00 € |
| Work name | Unit | From |
|---|---|---|
| Partition walling up to 12.5 cm (brick/Ytong) | m² | 19,00 € |
| Walling up to 30 cm (Porotherm, Ytong) | m² | 25,00 € |
| Wall and floor primer application | m² | 1,90 € |
| Mesh reinforcement for internal blockwork | m² | 11,50 € |
| Wall repairs (Rimano, Rotband) | m² | 8,90 € |
| Wall plastering (base coat) | m² | 14,50 € |
| Fine lime-cement render (Feinputz) | m² | 9,50 € |
| Stucco render | m² | 9,50 € |
| Machine-applied renders (lime-cement) | m² | 12,50 € |
| Gypsum / skim plaster | m² | 12,00 € |
| External renders | m² | 15,50 € |
| Lintel installation | pcs | 25,00 € |
| Block up openings | m² | 25,00 € |
| Chimney construction (chamotte + ceramic liner) | lm | 55,00 € |
| Schiedel-type chimney construction | lm | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| External wall construction up to 30 cm thick | m² | 25,00 € |
| Load-bearing external wall construction | m³ | 65,00 € |
| Non-load bearing external wall construction | m² | 25,00 € |
| Work name | Unit | From |
|---|---|---|
| Application of external scratch coat | m² | 12,00 € |
| Application of silicone facade render | m² | 15,00 € |
| Facade insulation with EPS | m² | 25,00 € |
| Work name | Unit | From |
|---|---|---|
| Cladding plinth with artificial stone | m² | 35,00 € |
| External cladding with natural stone | m² | 55,00 € |
| Cladding with split-face stone (fences, plinth) | m² | 59,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works in trade | hr | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| Break out ceramic wall tiles | m² | 8,50 € |
| Break out floor tiles | m² | 9,00 € |
| Remove bath | pcs | 45,00 € |
| Remove WC | pcs | 25,00 € |
| Remove basin | pcs | 17,00 € |
| Demolish brick partition wall up to 150mm thick | m² | 15,00 € |
| Demolish solid / fair-faced brickwork | m² | 16,00 € |
| Demolish concrete wall / partition | m³ | 150,00 € |
| Demolish reinforced concrete slab up to 12 cm | m² | 54,00 € |
| Strip PVC or carpet floor coverings | m² | 4,00 € |
| Remove floating floor (parquet, linoleum) | m² | 2,50 € |
| Remove door with timber frame | pcs | 25,00 € |
| Cutting concrete and removing steel door frame | pcs | 120,00 € |
| Break out metal door frame from concrete | pcs | 45,00 € |
| Remove panel radiator | pcs | 35,00 € |
| Remove cast iron radiator | pcs | 45,00 € |
| Remove plasterboard ceiling and structure | m² | 9,50 € |
| Complete demolition of prefabricated bathroom core | pcs | 550,00 € |
| Strip old internal plaster | m² | 8,50 € |
| Remove kitchen unit | pcs | 70,00 € |
| Break out fitted wardrobe | pcs | 50,00 € |
| Break out WC soil pipe enclosure | pcs | 35,00 € |
| Remove window sills | pcs | 10,00 € |
| Rubble removal and disposal | t | 130,00 € |
| Removal and disposal of asbestos / asbestos cement | m² | 20,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works | hr | 25,00 € |
| Transport and hazardous waste disposal of asbestos / transite | t | 245,00 € |
| Work name | Unit | From |
|---|---|---|
| Pouring strip foundations into trench | m³ | 40,00 € |
| Laying and levelling blinding concrete | m² | 8,00 € |
| Pouring slab foundations, 100 mm thick | m² | 6,80 € |
| Pouring slab foundations, 150 mm thick | m² | 7,80 € |
| Pouring slab foundations, 200 mm thick | m² | 9,50 € |
| Formwork for foundations and walls | m² | 18,00 € |
| Shuttering for floor slab (Doka/Peri system) | m² | 12,00 € |
| Striking floor slab formwork | m² | 5,80 € |
| Tying reinforcement bars | t | 350,00 € |
| Laying and tying mesh reinforcement 100×100 | m² | 2,70 € |
| Laying and tying mesh reinforcement 150×150 | m² | 3,00 € |
| Pouring concrete stairs including formwork | m³ | 120,00 € |
| Erecting stair formwork | lm | 51,00 € |
| Dismantling stair formwork | lm | 12,00 € |
| Hand-laid floor screed up to 7 cm | m² | 9,00 € |
| Machine-applied screeds - cementitious | m² | 10,50 € |
| Machine-applied screeds - anhydrite self-levelling | m² | 11,80 € |
| Installation of ceramic beam and block floor | m² | 20,00 € |
| Bituminous primer coat | m² | 3,50 € |
| Laying bitumen felt damp-proof membrane (DPM) | m² | 2,80 € |
| Cutting expansion joints | lm | 5,00 € |
| Power floating concrete floor | m² | 4,50 € |
| Pumping concrete mix | m³ | 15,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works in the trade | hr | 40,00 € |
| Work name | Unit | From |
|---|---|---|
| Cutting RC panel up to 10 cm | lm | 35,00 € |
| Cutting RC panel up to 15 cm | lm | 50,00 € |
| Cutting concrete walls up to 150 mm thick | lm | 50,00 € |
| Cutting concrete floors up to 100 mm deep | lm | 25,00 € |
| Core drilling holes ø up to 100 mm | pc | 90,00 € |
| Core drilling holes ø 100-200 mm | pc | 140,00 € |
| Core drilling holes ø over 200 mm | pc | 220,00 € |
| Forming opening in RC panel up to 10 cm | pcs | 75,00 € |
| Forming opening in RC panel up to 15 cm | pcs | 105,00 € |
| Installation of steel support structure (welded) | pcs | 350,00 € |
| Trimming metal door frames in RC up to 10 cm | pcs | 105,00 € |
| Trimming metal door frames in RC up to 15 cm | pcs | 125,00 € |
| Chasing for services (electrical, water) | lm | 15,00 € |
| Cutting out window or door opening | pcs | 450,00 € |
| Cutting opening in reinforced concrete panel | pcs | 250,00 € |
| Cutting asphalt surfaces | lm | 15,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works in trade | hr | 45,00 € |
| Work name | Unit | From |
|---|---|---|
| Removal of block paving | m² | 2,70 € |
| Excavation for paving sub-base | m³ | 35,00 € |
| Laying geotextile membrane | m² | 1,90 € |
| Preparation of gravel sub-base including compaction | m² | 7,50 € |
| Levelling bedding / laying course | m² | 2,50 € |
| Formation of sub-base up to 30 cm deep | m² | 2,00 € |
| Formation of sub-base up to 50 cm deep | m² | 2,70 € |
| Compaction of sub-base with vibratory plate | m² | 3,90 € |
| Work name | Unit | From |
|---|---|---|
| Laying block paving, 4-6 cm thick | m² | 11,00 € |
| Laying block paving, 8-10 cm thick | m² | 15,00 € |
| Laying decorative block paving | m² | 18,00 € |
| Surcharge for small pavers up to 10×10 cm | m² | 5,50 € |
| Cutting block paving, 4-6 cm thick | lm | 3,50 € |
| Cutting block paving, 8-10 cm thick | lm | 5,50 € |
| Jointing with silica sand | m² | 1,90 € |
| Final sanding and brushing into joints | m² | 1,00 € |
| Work name | Unit | From |
|---|---|---|
| Installation of garden kerbs | lm | 5,50 € |
| Installation of road kerbs | lm | 7,50 € |
| Installation of kerbs into semi-dry concrete | lm | 10,50 € |
| Installation of paving into concrete (as kerb alternative) | lm | 4,20 € |
| Work name | Unit | From |
|---|---|---|
| Installation of palisades up to 50 cm | pcs | 4,50 € |
| Installation of palisades over 50 cm | pcs | 6,50 € |
| Construction of exterior steps from palisades | lm | 39,00 € |
| Installation of timber / WPC decking | m² | 32,50 € |
| Work name | Unit | From |
|---|---|---|
| Installation of drainage channel into concrete | lm | 6,80 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified paving works | hr | 39,00 € |
| Work name | Unit | From |
|---|---|---|
| Concrete foundation for fence | m³ | 70,00 € |
| Work name | Unit | From |
|---|---|---|
| Laying concrete fence blocks | pcs | 4,00 € |
| Building fence piers | lm | 22,00 € |
| Install concrete fencing up to 1.8 m | lm | 20,00 € |
| Install concrete fencing up to 2.1 m | lm | 23,00 € |
| Install concrete fencing up to 2.4 m | lm | 24,00 € |
| Fencing with DT 12/15 blocks | m² | 15,00 € |
| Fencing with DT 20/25 blocks | m² | 17,00 € |
| Remove old fencing | lm | 8,80 € |
| Install fence post up to 2.4 m | pcs | 25,00 € |
| Install fence post up to 2.7 m | pcs | 28,00 € |
| Install fence post up to 3.8 m | pcs | 35,00 € |
| Install fence strut up to 2.7 m | pcs | 1,70 € |
| Install barbed wire extension arm | pcs | 1,40 € |
| Tension straining wire | lm | 0,50 € |
| Tension barbed wire | lm | 0,75 € |
| Install fence frame | pcs | 55,00 € |
| Install bespoke fence frame | pcs | 69,00 € |
| Install fence panels | pcs | 85,00 € |
| Install mesh fencing up to 1.4 m | lm | 2,50 € |
| Install mesh fencing up to 1.8 m | lm | 2,70 € |
| Install mesh fencing over 3.0 m | lm | 3,70 € |
| Blockwork corner bonding | pcs | 1,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified work in trade | hr | 25,00 € |
| Work name | Unit | From |
|---|---|---|
| External wall insulation with polystyrene (full adhesive bond and anchoring) | m² | 25,00 € |
| External wall insulation with mineral wool (inc. fixings) | m² | 28,00 € |
| Install ETICS system up to 20 cm | m² | 13,00 € |
| Window reveal insulation (XPS) | lm | 3,00 € |
| Ceiling/loft insulation | m² | 10,00 € |
| Vapour barrier installation | m² | 4,00 € |
| Thin-coat external render (scraped 2 mm) | m² | 13,50 € |
| Apply fibreglass mesh to walls + adhesive | m² | 12,50 € |
| Install PVC corner bead | lm | 1,90 € |
| Install APU bead with mesh | lm | 0,90 € |
| Window head drip bead | lm | 2,50 € |
| Sprayed foam insulation (closed cell) | m² | 19,00 € |
| Sprayed foam insulation (open cell up to 25 cm) | m² | 23,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified trade works | hr | 50,00 € |
| Façade scaffolding erection | m² | 4,50 € |
| Scaffolding dismantling after external wall insulation | m² | 2,20 € |
| Scaffolding hire 100 m² | day | 14,95 € |
| Scaffolding hire 300 m² | day | 45,00 € |
| Scaffolding hire 1000 m² | day | 100,00 € |
| Work name | Unit | From |
|---|---|---|
| Install guttering (eaves) | lm | 9,50 € |
| Install gutter bracket | pcs | 9,00 € |
| Install downpipe | lm | 9,00 € |
| Install downpipe clip | pcs | 3,50 € |
| Install gutter outlet | pcs | 12,00 € |
| Work name | Unit | From |
|---|---|---|
| Removal of gutters and downpipes incl. brackets | m | 4,50 € |
| Removal of ridge tiles, verge trims, chimney flashings and valley gutters | lm | 5,50 € |
| Removal of sheet metal roofing | m² | 4,50 € |
| Remove roof tiles (clay or concrete) | m² | 8,50 € |
| Strip roof battens incl. de-nailing | m² | 2,70 € |
| Roof truss dismantling | m² | 14,50 € |
| Removal of metal sheet roofing - unscrewing and lowering sheets | m² | 6,00 € |
| Work name | Unit | From |
|---|---|---|
| Timber roof truss installation (load-bearing structure) | m² | 20,00 € |
| Install battening for tiled roof | m² | 3,50 € |
| Install counter-battening | m² | 3,90 € |
| Install vapour barrier | m² | 2,90 € |
| Cladding facade - standing seam | m² | 20,00 € |
| Lock seam / standing seam metal roof covering | m² | 19,00 € |
| Install PVC waterproofing membrane (flat roof) | m² | 17,00 € |
| Spark test PVC membrane (flat roof) | m² | 1,50 € |
| Lay ceramic/concrete tile covering | m² | 30,00 € |
| Work name | Unit | From |
|---|---|---|
| Torch-on felt, horizontal surface (1x layer) | m² | 9,20 € |
| Torch-on felt, vertical surface (1x layer) | m² | 15,00 € |
| Work name | Unit | From |
|---|---|---|
| Window sill flashing | lm | 16,00 € |
| Work name | Unit | From |
|---|---|---|
| Flat roof parapet capping | lm | 19,00 € |
| Roof cleaning and painting | m² | 12,00 € |
| Work name | Unit | From |
|---|---|---|
| Chimney flashing | lm | 22,00 € |
| Wall / penetration flashing | lm | 16,00 € |
| Capping wall / gable | lm | 18,00 € |
| Install drip edge | lm | 10,00 € |
| Work name | Unit | From |
|---|---|---|
| Spray foam insulation - closed cell | m² | 17,00 € |
| Spray foam insulation - open cell (20-25 cm) | m² | 13,00 € |
| Spray foam insulation - open cell (30-35 cm) | m² | 17,50 € |
| Blown-in glass wool insulation for lofts and cavity walls | m² | 15,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified work | hr | 40,00 € |
| Work name | Unit | From |
|---|---|---|
| Manual excavation (soil class 1-2) | m³ | 25,00 € |
| Manual excavation up to 1m depth (soil class 3) | m³ | 32,00 € |
| Manual excavation up to 1m depth (soil class 4) | m³ | 40,00 € |
| Mechanical strip foundation excavation (width from 50 cm) | m³ | 15,00 € |
| Mechanical pad foundation excavation (width from 80 cm) | m³ | 25,00 € |
| Mechanical bulk excavation | m³ | 12,00 € |
| Mechanical trenching for utilities | lm | 7,50 € |
| Hand trimming of strip foundation up to 1m depth | lm | 12,00 € |
| Hand trimming of pad foundation up to 1m depth | m² | 13,00 € |
| Hand trimming of formation level | m² | 5,00 € |
| Hand auger excavation up to 25 cm diameter | pcs | 4,50 € |
| Hand auger excavation up to 35 cm diameter | pcs | 6,50 € |
| Work name | Unit | From |
|---|---|---|
| Backfill with soil and compaction | m³ | 30,00 € |
| Backfill with gravel / crushed aggregate | m³ | 10,00 € |
| Fills with sand-gravel + compaction | m³ | 9,50 € |
| Sub-base compaction with vibratory plate | m² | 3,50 € |
| Compaction with vibratory roller | m² | 2,80 € |
| Work name | Unit | From |
|---|---|---|
| Spoil removal (incl. loading) | m³ | 10,00 € |
| Soil removal / Sand-gravel delivery | km | 3,50 € |
| Work name | Unit | From |
|---|---|---|
| Trench shoring up to 2m depth | m² | 20,00 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified works | hr | 22,00 € |
| Work name | Unit | From |
|---|---|---|
| Dismantle old roof truss | m² | 12,00 € |
| Dismantle roof sarking | m² | 1,60 € |
| Dismantle pitched roof battens | m² | 2,70 € |
| Dismantle framed roof structures | lm | 1,90 € |
| Work name | Unit | From |
|---|---|---|
| Lay vapour barrier | m² | 2,00 € |
| Lay roofing underlay (membrane under covering) | m² | 2,90 € |
| Work name | Unit | From |
|---|---|---|
| Staining timber / wood + cleaning | m² | 2,50 € |
| Timber impregnation (coating / spray) | m² | 3,50 € |
| Work name | Unit | From |
|---|---|---|
| Install timber floor joists | lm | 4,50 € |
| Install traditional pitched roof structures | lm | 6,80 € |
| Install trussed rafters (timber connector plates) | m² | 4,70 € |
| Install wall plate | lm | 10,00 € |
| Install rafters | lm | 7,50 € |
| Install collar ties | lm | 5,50 € |
| Install purlins / posts | lm | 7,90 € |
| Pitched roof truss installation | m² | 38,90 € |
| Roof truss installation (hipped / pyramid roof) | m² | 25,00 € |
| Work name | Unit | From |
|---|---|---|
| Install breathable membrane | m² | 2,90 € |
| Roof battening | m² | 5,50 € |
| Roof battening and counter-battening | m² | 2,60 € |
| Counter-battening | m² | 3,90 € |
| Roof sarking with OSB / planed boards | m² | 9,50 € |
| Install timber sarking | m² | 5,90 € |
| Work name | Unit | From |
|---|---|---|
| Other unspecified carpentry works | hr | 29,00 € |
| Work name | Unit | From |
|---|---|---|
| External surface-mounted roller shutters - PVC / aluminium | m² | 35,00 € |
| External wooden roller shutters | m² | 45,00 € |
| External venetian blinds | m² | 45,00 € |
| Zip screen blinds, PVC-coated fibreglass, wind-resistant | m² | 45,00 € |
| Bioclimatic aluminium pergola with louvred roof | m² | 85,00 € |
| Retractable folding arm awning | pc | 145,00 € |
| Traditional window shutters (wood / aluminium) - hinged, solid or louvred | m² | 65,00 € |
| Natural screening roll (bamboo, reed, willow) | m² | 8,50 € |
| Fixed brise-soleil / architectural solar shading for commercial buildings | m² | 55,00 € |
| Work name | Unit | From |
|---|---|---|
| Removal of external venetian blinds | pc | 15,00 € |
| Zip screen blind removal | pc | 25,00 € |
| Dismantling folding arm and retractable awnings | pc | 50,00 € |
| Pergola removal | ea | 300,00 € |
| Removal of traditional window shutter | pc | 12,50 € |
See proposals you can now send to your own customers
Pricebook for construction workDon't need the Estimator? Build proposals straight from the pricebook.
A few clicks and you have a real estimate. No strings attached.
Painting labour rates vary by region. Based on your city, we'll estimate the average market hourly rate in your area.
From entire rooms to specialised work
Interior work
Built by contractors for contractors. No fluff.
Bathrooms, kitchens, flooring, painting, electrical, masonry and more - AI prices them for you, you just review.
Generate a document you can be proud of with one click. The client gets it - you get the job.
Send a link, an email or download a PDF - whichever you prefer.
An estimate that used to take you a full evening? Now done in a few clicks.
A professional-looking proposal is more likely to convert. Simple.
NUMIQ tracks unknowns and warns you before the project goes over budget.
Three steps and the proposal is out
The Estimator asks about scope - you just answer, no spreadsheets
You have an estimate instantly. Want to tweak? No problem.
Link, email or PDF - the client signs online, you get started.
All plans include AI estimates, unlimited edits, proposal sharing, PDF export and all features. The only difference is the number of active estimates.
Try NUMIQ with one active estimate
For tradespeople ready to grow
Most popular - handle more jobs
For professionals with high volume
OPEN unlocks every price for 5 days. It is a one-off unlock - handy for a single job that does not need a monthly subscription.