nahlad

Kitchen installation price

Kitchen installation is one of the most important parts of completing a new home or interior renovation. Proper fitting and quality installation guarantee that the kitchen will not only be aesthetically perfect, but also fully functional. In this article, we'll give you an overview of what kitchen installation involves, what your options are when choosing installation services, and what prices you can expect. We'll also explore individual specifics, such as invisible milled joints for worktops, fitting appliances into kitchen units, and fitting and connecting an oven hood. At the end of the article, you'll find tips on how to cut costs without sacrificing quality.

Price for kitchen installation

Average price for installation of kitchen cabinets with appliances

Calculate the price of construction works

506,0 £/x

Average price Updated 23.12.2024 21:48

Other prices for kitchen installation

Kitchen installation Price 12.05.2025

Price The price shown is only for labor (handwork) without material. The price of construction works is usually final for natural persons. If the customer is a legal entity (company), the calculation of VAT is based on the agreement with the contractor, depending on whether the contractor and the customer are VAT payers or non-payers.

Quantity

Sum

Kitchen cabinet assembly - without appliances

119,6 £

bm

0 £

Invisible milled joint - worktop

101,2 £

psc

0 £

Installation and connection of the extractor pipe

119,6 £

psc

0 £

Unspecified other jobs in this field (Hourly wage) Práce, ktorých hodnota sa nedá určiť jednotkovou cenou (nie sú uvedené v cenníku vyššie) sa počítajú hodinovou sadzbou. Ak je práca neštandarná, napríklad murovanie neštandardných rozmerov, maľovanie členitých stien a pod. použite hodinovú sadzbu.

LOCKEDPlease log in or register to view LOCKED items.

hour

LOCKEDPlease log in or register to view LOCKED items.

Kitchen installation and their benefits

Invisible worktop joint

The smooth connection without visible lines gives the kitchen an elegant look.

Safe fitting of appliances

The professional fitting guarantees the safety and reliability of the appliances.

Solid and stable kitchen

Tight fitting ensures stability and longer life of the line.

Installation of kitchen cabinets - without appliances

The installation of a kitchen unit without appliances is a basic service, where a professional team will assemble and install the kitchen unit according to the exact dimensions and design you have prepared. This service includes:

  • Kitchen cabinet assembly - Individual cabinets, drawers, shelves and other kitchen cabinet components are professionally assembled and fixed to the wall or floor, according to the kitchen design.
  • Precise alignment and fitting - Careful alignment and stable fitting are key when fitting a kitchen cabinet, so that all doors and drawers work correctly and the cabinet stays securely in place.

The price for the basic assembly of a kitchen cabinet without appliances ranges from £200 to £400, depending on the size and complexity of the assembly. For larger and more complicated assemblies, where additional elements also need to be installed, the price can rise up to £500. 

Calculate the price of construction works

Invisible milled worktop joint

One of the important details that fundamentally affects the final look of a kitchen cabinet is the way the worktop is connected. The invisible milled joint is a modern solution that ensures perfect interconnection of the worktops without visible lines or gaps. This milling method creates a smooth, seamless transition between the individual worktop parts while significantly improving the overall aesthetic impression.

The process includes:

  • Joint milling - Special milling tools are used to adjust the edges of the board so that the joint is smooth and unobtrusive.
  • Gluing and finishing - Once the milled joint is formed, the boards are glued together using a durable adhesive that can withstand the pressure, temperature and humidity common in kitchen environments.

The price for an invisible milled worktop joint is around £70 to £100 per joint, depending on the thickness and material of the worktop. For larger and more demanding kitchens, several joints may be required, which can affect the final price.

Calculate the price of construction works

Fitting appliances into kitchen cabinets

Fitting appliances such as an oven, hob, microwave or dishwasher is one of the key activities involved in fitting a kitchen. When fitting appliances, it is essential to comply with safety regulations and standards, especially for appliances that require connection to the mains electricity or water pipes. This work includes:

  • Precise fitting into prepared holes - Each appliance must be perfectly inserted into its place, taking into account the need for ventilation and safe connection to the electrical wiring.
  • Connecting to mains or mains water - Some appliances, such as a dishwasher, require a connection to the water supply, which requires professional intervention and often plumbing experience.

The price for fitting one appliance ranges between £50 to £100, with the final price depending on the number and type of appliances that need to be installed. If you have multiple appliances, you can apply for a discount for installation as part of a comprehensive service.

Installation and connection of the fume cupboard oven

The cooker hood is an important part of the kitchen unit that ensures extraction of steam, odours and excessive moisture from cooking. Correct connection of the hood is key to its efficient operation, as incorrect connections can lead to steam leaks and reduce overall efficiency. The installation and connection of the hood oven includes:

  • Wall or cabinet installation - Depending on the type of hood, it can be mounted on the wall or in the upper cabinet of the kitchen unit.
  • Connection to the extraction system - The oven hood must be securely and tightly connected to the ventilation system to ensure that the extraction system is functional and prevents odours from returning to the kitchen.

The price for the installation and connection of the fume cupboard ranges from £100 and £200, depending on the type of fume cupboard and the complexity of its installation. High-performance and larger models may require a special connection, which may slightly increase the price of the service.

Calculate the price of construction works

Other unspecified work in this field (hourly rate of pay)

When carrying out kitchen work, there are often various additional tasks that are not directly related to the basic installation, but are necessary to complete the overall appearance and functionality of the kitchen. This may include adjusting electrical wiring, finishing tiling, or minor adjustments and repairs that arise during the course of the work. An hourly rate of pay is commonly used for these tasks, which provides flexibility and coverage for the work as needed.

The hourly wage for unspecified work in the kitchen industry is around £30 to £50. These jobs may include:

  • Minor alterations and repairs - Adjusting holes, repairing sockets, moving wiring or fine-tuning bespoke details.
  • Installation of lighting elements - Additional lighting in the form of LED strips, spot lights that give the kitchen a modern and functional look.

Factors affecting the price of kitchen assembly

The price of kitchen installation can vary significantly depending on a number of factors. The main factors include:

  1. Kitchen size and number of components - Larger kitchens with more cabinets and shelves are more difficult to assemble, which is reflected in the price.
  2. Complexity of design and installation details - Kitchens with atypical dimensions or special material requirements may require additional work.
  3. Type and number of appliances to be fitted - Installing more than one appliance and wiring them correctly can increase the price.
  4. Location and availability of services - In some regions, transport costs may be higher, which affects the final price.

How to save when assembling the kitchen

To save money when assembling your kitchen, consider the following tips:

  • Prepare a clear plan and design in advance - A well thought out and planned kitchen saves assembly time and eliminates retrofitting.
  • Choose a suitable contractor with good references - A proven contractor with experience can get the job done efficiently and to a high standard, minimising the cost of repairs.
  • Combine services and discounts - Many companies offer discounts when you order more than one service, such as appliance fitting and kitchen cabinet installation, as part of one package.

Fitting a kitchen is an investment that affects not only the look but also the comfort of your home. Quality installation, the right appliance connections and perfectly connected elements create the ideal kitchen where you feel comfortable. Follow the recommendations, compare prices for building work and choose experienced professionals who will ensure a high-quality installation.

Calculate the price of construction works

Chyba

close