Carpentry work

Carpentry work

Carpentry work

12.01.2026 5 minutes read
Carpentry work includes a wide range of services that can greatly enhance the aesthetics and value of your interior. Whether it's installing wooden stair treads, fitting jambs or refurbishing an older staircase, expert joinery guarantees precise and durable results. In the following article, we'll outline the different types of carpentry work, what tasks they involve, and what prices you can expect. We'll take a detailed look at installing wooden staircases, fitting doors with door frames, refurbishing old stairs or installing wooden balustrades. At the end of the article you will also find useful tips for choosing a reliable joiner and advice on how to optimise your costs.

Price for carpentry work

Average price for the installation of wooden stair treads

300.00 €/1
AVERAGE PRICE

Updated 15.01.2025 12:39

Carpentry work and their benefits

Aesthetic and safe staircase

Wooden stairs look elegant and are safe to walk on.

Renewed appearance of the stairs

Sanding and varnishing will return the old stairs to their original beauty.

Safety with wooden handle

The wooden handrail provides support and increases the safety of the staircase.

Other prices for carpentry work

 

Fitting of wooden door frames + hanging of doors

Fitting door frames and hanging doors is one of the common carpentry works in interior finishing. Doorframes are not only practical, but they give a stylish look to the room and match the door you choose. The whole process involves:

  • Preparation of the opening and installation of the door frame - Wooden door frames are installed exactly in the door opening and fixed firmly to prevent movement or deformation.
  • Hanging the door and adjustment - After the door frame is installed, the door itself is hung on the hinges and adjusted so that it operates smoothly and does not rub against the floor.

The price of fitting door frames with doors ranges from £80 to £150 per door. The exact price depends on the type of wood, the dimensions of the door and door frame, as well as the complexity of the work.

Installation and fitting of wooden stair treads

Wooden stair treads are a popular choice for interior staircases due to their elegance and the warm look of the wood. The installation of wooden stairs requires precision, as each tread must be firmly fixed to keep the stairs safe and stable. This work includes:

  • Installing wooden steps - Each step is accurately fitted and fastened to create a solid and secure support.
  • Surface finishing - After installation, stairs are often varnished or treated with a protective coating to prolong their life and enhance the natural beauty of the wood.

The price for the installation of wooden stair treads starts at approximately £200 for simpler stairs, for more complex types of stairs or special materials the price can reach up to £400.

Installation and fitting of wooden stair treads with a landing

Installing wooden stairs with a riser (the vertical part between the treads) gives the stairs a more solid appearance and improves their stability. The risers also reduce the risk of objects falling between the treads, making the stairs look more compact. This type of installation includes:

  • Installing steps and running boards - Each step and running board is precisely fitted and fixed for maximum strength and safety.
  • Aesthetic and finish - Stairs with treads are often treated with varnish or oil to prolong their life and bring out the colour of the wood.

The price of the installation of wooden stairs with a landing ranges from £250 to £500 depending on the size of the staircase, the type of wood and the specific requirements of the client.

Grinding of stair treads + 3x painting - repas of the original ones

Refinishing the original stairs is a more cost-effective alternative to replacing the stairs, but it can return them to their original beauty. The process includes:

  • Sanding of stair treads - The old surface of the stairs is carefully sanded to remove dirt, old varnish and any unevenness.
  • Triple lacquering - After sanding, the stairs are treated with three coats of lacquer, which ensures the durability of the surface and gives the stairs a new look.

The price for refurbishment of original stair treads ranges from £150 to £300, depending on the size of the staircase and the degree of wear and tear of the original surface.

Installation of wooden handrail 

The installation of the handrail on the handrail is important not only for the appearance, but especially for the safety of the staircase. A correctly fitted handrail provides support when walking on the stairs and adds an aesthetic element to the staircase. This service includes:

  • Fixing the handrail to the wall or handrail structure - The handrail is firmly fixed so that it is safe and comfortable to use.
  • Finish - The handrail is treated with lacquer or wax to make it wear-resistant and to match the staircase.

The price of installation of a wooden handrail ranges from £30 to £80 per meter, depending on the length of the handrail, type of wood and surface finish.

Factors influencing the price of carpentry work

The price of carpentry depends on several factors that can affect the final cost. The main factors are:

  1. Type and quality of material - Some types of wood, such as oak or walnut, are more expensive but provide a longer life and a higher aesthetic appeal.
  2. Job complexity and project size - Intricate details and larger projects, such as full-width staircases, can add significantly to the price.
  3. Surface finishing and protection - Sanding, painting or waxing the surface contributes to higher durability, but also to higher price.

Tips on how to save on carpentry work

To optimize the cost of carpentry work, consider the following recommendations:

  • Choose less expensive types of wood - Soft woods, such as spruce or pine, are more affordable and still give a nice look.
  • Simplify design and details - Simpler step or handrail designs can reduce labour and material costs.
  • Choose refurbishment over replacement - If the original wood elements are in good condition, refurbishment is more cost-effective while maintaining the original character of your interior.

Woodwork is an important investment that can add natural charm to your home and increase its value. Whether it's a new staircase, refurbishing an original staircase or installing a handrail, meticulous carpentry ensures durability and aesthetics. When choosing a service, consider the cost of carpentry work and compare quotes from proven professionals to get the best quality at a fair price.