Gas fitting

Gas fitting

Gas fitting

12.01.2026 7 minutes read
Gas installations are an integral part of modern homes and commercial premises. If you're planning to renovate or install new gas installations, research the options available on the market thoroughly. In this article, we'll provide you with a detailed overview of the most common gas installation jobs, information on building work pricing and useful advice that can save you time and money. The following information is mainly aimed at readers who are looking for expert yet understandable advice, with price and quality playing an important role in their decision making.

Price for gas fitting

Average price for gas boiler installation

580.00 €/ks
AVERAGE PRICE

Updated 10.01.2025 10:46

Gas fitting and their benefits

Safe installation of gas appliances

Expert installation minimises the risk of leaks and increases safety.

Precise positioning and interconnection of pipes

Properly connected piping will ensure a safe and smooth gas supply.

Reliable review report

The inspection report confirms safety and meets the requirements of insurance companies.

Other prices for gas fitting

1. Installation and connection of the gas boiler

One of the most common tasks in the field of gas installations is the installation of a gas boiler, which provides water heating and heating. This process involves a number of important steps that require expertise and experience. The boiler must be installed in a safe location, connected to the existing installation and set up for efficient operation. Quality installation is key to the trouble-free operation of the boiler and the safety of the home. Improper installation can lead to gas leaks, posing a serious risk to the health of the home's occupants.

When installing a boiler, it is important to consider a number of factors, such as the type of boiler, its output and the installation location. There are two main types of boilers: conventional gas boilers and condensing boilers. Although more expensive, condensing boilers have higher efficiency and lower gas consumption, which can save significant costs in the long run. The cost of installing a gas boiler ranges from £350 to £700, depending on the type and complexity of the installation. The expertise and experience of the gas installer carrying out the installation should also be taken into account when choosing this service.

2. Relocation and connection of gas piping

A frequent requirement during renovations is the relocation of existing gas piping. This may be, for example, when kitchen plumbing needs to be relocated or a gas boiler needs to be moved to another location. This process involves removing the old pipework, installing the new pipework, connecting it and thoroughly testing the joints for tightness. Connecting gas pipes securely is crucial to the safety of the whole home.

Pipe relocation is often combined with other building modifications, so it is a good idea to consider this work when planning a renovation to minimize the cost and time required to complete. The cost of construction work for moving and connecting gas pipes ranges from £250 to £450, depending on the length of the pipe and the complexity of the project. It is important that any such work is carried out by qualified professionals, as any inaccuracies can lead to gas leaks that are dangerous and require costly repairs.

3. Installation and connection of the domestic hot water tank

For any household that requires a higher volume of hot water, the installation of a domestic hot water cylinder is a suitable solution. This tank ensures that you have enough hot water even at times of increased consumption, which is particularly important in family homes and larger apartments. When installing the tank, you need to connect it to the gas supply, connect it to the existing plumbing and adjust the control to ensure that the water is heated efficiently and safely.

Choosing the right storage tank depends on a number of factors, including household size, average daily water consumption and available space. Storage tanks come in a variety of capacities, with smaller ones suitable for apartments and smaller homes, while larger tanks are ideal for larger homes or commercial spaces. The price for the installation and connection of a storage tank ranges from £300 to £600. When doing this work, it is important to pay attention to quality and expertise to ensure that the installation is done correctly and meets all safety standards.

4. Blocking the gas pipe from the metering clock

Blocking of gas pipes is necessary in cases where a certain part of the gas installation is shut down or removed. This process involves safely sealing the pipework, preventing any gas leaks. Blockage is often required during renovations when rooms are being redesigned or when old gas appliances that are no longer needed are being dismantled.

Fencing is a relatively quick job, but it requires precision and skilled personnel who are able to close the pipe properly. The cost of this gas work ranges from £120 to £220, depending on the length and type of pipe. Although this is a simple task, it is crucial that it is carried out professionally, as any shortcomings could cause gas leaks.

5. Cutting grooves for gas installation (brick and concrete)

Cutting grooves for gas piping is work that is done before the actual installation of the pipe. The grooves are used to fit the pipe into the wall, thus ensuring the aesthetic appearance and protection of the pipe. The material of the walls needs to be taken into consideration when doing this work, as the chipping techniques vary depending on whether the walls are brick or concrete.

Cutting grooves in brick walls is generally easier and less demanding than in concrete walls, and therefore cheaper. The price for chiselling work in brick walls ranges from £6 to £10 per linear metre. For concrete walls, the work is more difficult and the price is higher, ranging from £10 to £15 per linear metre. It is important to keep the grooves to the exact dimensions for this work, so that the pipe can be laid securely and not be damaged.

6. Gas Revision Administration

Any new installation or major modification to a gas system should be accompanied by an inspection report. A gas inspection report is a document that confirms that the installation complies with current regulations and that it is safe to use. This document is essential at the time of approval and is a requirement with most insurers, who require it as proof that the gas installation meets all standards.

The inspection report is issued based on an inspection of the entire system, including piping, connections, appliances and valves. The cost of an inspection report varies between £90 and £160, depending on the size of the property and the complexity of the installation. This document is a guarantee of safety and also serves as a basis for any claims or insurance claims.

7. Other unspecified work (hourly wage)

In the context of gas installation work, you may encounter a variety of non-standard tasks that cannot be accurately categorised. These may be minor repairs, adjustments or finishing works that require professional intervention but do not have a clearly defined scope. In such cases, an hourly rate is often used, which allows for flexible adjustment of the price according to the specific work.

The hourly rate for non-specified gas installation work ranges from £25 to £40, allowing the client to get a tailored solution at a fair price. This approach is particularly advantageous for smaller repairs or alterations where a flat fee would be disadvantageous.

 

Tips for choosing a quality gas fitter

  1. Check certificates and authorisations - Gas installations should only be carried out by certified professionals who have a valid licence to work with gas.
  2. Compare bids and prices - Each project has specific requirements, so it is advisable to compare several bids and look at a detailed price list for construction work.
  3. Pay attention to review and inspection - Once the installation is complete, you should ask for an inspection report to ensure that the installation meets all necessary standards.

Gas installation work is a significant investment that affects the comfort and safety of your home. Investing in skilled professionals and quality materials is a guarantee of trouble-free operation and safe use of gas appliances. At Numiq, you will find a detailed price list and experts to help you complete your projects to the highest standards.