Plasterboard work

Plasterboard work

Plasterboard work

12.01.2026 18 minutes read
Drywall work is one of the most popular ways to quickly and efficiently transform interior spaces or complete construction projects. However, the cost of these services can surprise many customers, as it includes not only the material but also several other factors. In this article, we will explore what influences the prices of drywall work and how to avoid unexpected expenses. We'll provide tips on how to plan wisely and get the best value for your money.

Price for plasterboard work

Average price of plasterboard works per square meter

25.00 €/m²
AVERAGE PRICE

Updated 15.01.2025 13:27

Plasterboard work and their benefits

Plasterboard is practical

Plasterboard is the easiest way to create a partition

Preparation is essential

To achieve a perfect wall or ceiling, plan the installation well

Plasterboard reduces space

Plasterboard is not a load-bearing element and is mounted on the structure

Other prices for plasterboard work

Key Factors Influencing the Cost of Drywall Work

The prices of drywall work are influenced by several factors that should be considered when planning construction projects. One of the most important factors is the size of the project. Larger projects, such as full-scale renovations or complete interior remodels, often come with a lower unit cost, as many contractors offer discounts for larger orders.

The complexity of the work also plays a significant role. If the drywall is used for intricate structures like arches, multi-level ceilings, or irregular wall shapes, the price will be higher than for simple, flat walls. Technical complexity and the need for precision require more time and specialized expertise, which is reflected in the final cost.

Another important aspect is the quality of the materials. The market offers several types of drywall sheets, from standard to fire-resistant, as well as special acoustic or moisture-resistant boards. The better the material, the higher the price. When selecting materials, it is essential to consider not only the price but also their characteristics and durability under the given conditions.

Finally, the location of the construction site can significantly influence the cost. Work performed in larger cities is often more expensive due to higher transportation costs, rent, or hourly wages. If the construction site is in a remote area, transportation costs for workers and materials may also contribute to the overall price.

Why Experienced Contractors are Crucial

In drywall work, the quality of the contractor plays a critical role. The experience and skills of the contractor directly affect the quality of the final result. Less experienced workers may make mistakes that result in additional costs for repairs. Therefore, it is essential to invest in professionals with a track record of successful projects and good references.

Experienced contractors can also offer valuable advice on cost optimization. For instance, they may suggest alternative materials that are more affordable but still suitable for your project. Moreover, they can identify potential issues early in the planning stage, saving you money on future repairs or modifications.

How to Plan a Proper Budget for Drywall Work

When planning the budget for drywall work, it is important to have a clear understanding of the total scope of the work and material needs. An accurate estimate at the beginning of the project helps to avoid surprises during implementation. It is advisable to start with a consultation with an experienced contractor who can provide a realistic cost assessment.

Don't leave planning until the last minute. Make sure you have sufficient financial reserves to handle unexpected situations, such as increased material costs or delays in work. A standard contingency fund should be at least 10-15% of the total budget.

When planning, it's also worth considering the time of year when the work will be done. In summer, prices may be higher due to increased demand, whereas in winter months, it may be easier to obtain discounts or better terms from service providers.

Common Mistakes in Drywall Work and How to Avoid Them

One of the most common mistakes is underestimating the complexity of the project. Many homeowners or apartment owners think that drywall is a simple material that anyone can install. However, incorrect installation can lead to cracks, deformations, and other problems that require costly repairs.

Another mistake is choosing inappropriate materials. For example, using standard drywall in a bathroom can lead to moisture issues and mold. It's essential to choose the right type of drywall for each space, depending on its specific conditions.

Improper preparation of the substrate is another frequent mistake. Drywall sheets must be installed on a stable and even surface. If the walls or ceilings are uneven, the result will not be satisfactory either aesthetically or functionally.

Lastly, poor insulation and sealing can lead to energy losses and inadequate soundproofing. During drywall work, it's important to ensure proper insulation, especially for walls or ceilings that separate living spaces from exterior or noisy areas.

Tip: When choosing a contractor, pay attention to their references and experience with specific types of drywall installation. Ask about their previous projects, and don't hesitate to request examples of their completed work.

The principle of laying plasterboard is to attach the plasterboard to a supporting structure, which you must always prepare in advance. The minimum distance between the plasterboard and a solid wall - such as a ceiling - is 8 cm (3.15 inches). So you have to take into account that plasterboard will reduce your space.

Plasterboard is a building material made of gypsum and covered with paper that is used to create interior walls and ceilings. It is popular for its lightness, ease of handling and quick installation. There are different types of plasterboard, including standard, fire-resistant, impregnated (moisture-resistant) and acoustic boards, which are selected according to the specific needs of the project.

The price of plasterboard works is influenced by several factors. One of the main factors is the type and quality of materials used. Standard plasterboards are the cheapest, with an average price of around £4-£5 per square metre. Fire-resistant and impregnated boards are more expensive, with prices ranging between £6-£8 per square metre, while special acoustic boards can cost up to £10-£12 per square metre.

Project complexity and design requirements also significantly affect costs. Simple straight walls and ceilings are cheaper to install, while complex architectural features such as arches, niches or multi-level ceilings require more time and special skills. The cost for such complex installations can be up to 20-40% higher compared to standard applications.

Substrate preparation and installation of metal profiles are important parts of plasterboard work. Unevenness and imperfections in the substrate can increase preparation costs. The use of high quality metal profiles is crucial for the stability and durability of the structure. The cost of metal profiles is around £3-£4 per metre standard, depending on type and quality.

Another important factor is the workforce. Labour costs depend on the region and the experience of the workers. In urban areas, wages are usually higher, which is reflected in the overall costs. The average price for plasterboard work, including installation, is around £15-£25 per square metre, while in more luxurious projects or in difficult conditions the cost can rise to £30-£40 per square metre.

The location of the project is another important factor influencing the price. Prices for services can vary by region, with urban areas typically having higher costs due to the higher cost of living and rent. Surveys show that drywall prices in urban areas can be as much as 20-30% higher compared to rural areas.

The use and maintenance of special tools and techniques also contribute to costs. Modern technologies and tools that improve accuracy and efficiency can be expensive, which is reflected in the overall cost. Regular maintenance and replacement of worn parts are essential to ensure quality and safe work performance.

Statistics show that the demand for plasterboard work is growing, especially in the context of construction and renovation work. According to estimates, the market for drywall services is expected to grow at a compound annual growth rate of around 5-6% over the next five years, driven by increased construction activity and interior refurbishment.

Cutting plasterboard is a crucial part of the process that requires precision and experience. Proper measuring and cutting are essential to achieve a perfect result, reducing material wastage and increasing work efficiency. Using the correct techniques and tools is key to minimising dust and pollution in the working environment.

The procedure of plasterboard works:

  1. Planning and Preparation: the first step is careful planning and preparation. It is important to accurately measure the space and plan the layout of the drywall. When preparing the subfloor, it is necessary to check that the surface is level and clean, and any unevenness should be levelled out. Before installing the plasterboard, it is important to prepare the substrate, which should be flat, dry and free of cracks. It is recommended to apply a levelling plaster to uneven surfaces.
  2. Installation of the supporting structure: the supporting structure for plasterboard usually consists of metal profiles that are fixed to the walls, ceiling or floor with dowels and screws. The spacing of the profiles depends on the type of plasterboard and the required load-bearing capacity of the structure.
  3. Fixing plasterboard: The plasterboards are fixed to the supporting structure with screws. When fitting, it is important to ensure that the boards are correctly aligned and that there are no gaps between them.
  4. Joint sealing: the joints between the plasterboards are filled with a sealant, which is sanded after curing. This prepares the surface for final finishing, such as painting or wallpapering.
  5. Painting: after sealing and sanding the joints, the plasterboard walls and ceilings are painted with the colour of your choice.

Important tips:

  • When choosing plasterboard, it is important to consider the type of room in which it will be used and its properties such as fire resistance, moisture resistance and sound insulation.
  • Before installing plasterboard, it is important to turn off the electricity and water supply in the area.
  • It is important to use protective equipment such as gloves, goggles and a respirator when working with plasterboard.
  • Follow the manufacturer's instructions for installation and maintenance of plasterboard.

Advantages of plasterboard:

  • Quick and easy assembly
  • Universal use
  • Low weight
  • Good thermal and acoustic insulation
  • Fire resistance
  • Moisture resistance (depending on the type of plasterboard)
  • Possibility of different surface finishes

Disadvantages of plasterboard:

  • Lower strength compared to brick or concrete walls
  • Susceptibility to water damage (depending on the type of plasterboard)
  • Subsequent finishing of joints and surface

Important tips:

  • When choosing plasterboard, it is important to consider the type of room in which it will be used and its properties such as fire resistance, moisture resistance and sound insulation.
  • Before installing plasterboard it is important to turn off the electricity supply

Types of plasterboards and suitable construction methods

Plasterboard systems are divided into different types according to their characteristics and use. The most common types of plasterboard are:

By core type:

  • Plasterboard with gypsum core: these boards are the most common type and are used for walls, ceilings and partitions. They are lightweight, durable and easy to work with.
  • Fibre core plasterboard: these boards are stronger and more resistant to moisture than gypsum core boards. They are suitable for wet areas such as bathrooms and kitchens.
  • Plasterboards with a fire resistant core: these boards are fire resistant and are used in areas where there is a requirement for increased fire protection.
  • Plasterboard with acoustic core: these boards are suitable for places where sound insulation is important, such as offices, recording studios and cinemas.

By finish:

  • Plasterboards with paper surface: these boards are suitable for painting and wallpapering.
  • Pre-painted plasterboards: these boards are already painted and do not need further finishing.
  • Plasterboards with water-repellent surface: these boards are suitable for wet areas.
  • Drywall with impregnated surface: these boards are resistant to mould and bacteria.

Construction procedures:

Installation of plasterboard consists of the following steps:

  1. Preparation: before installation it is important to prepare the substrate, which should be flat, dry and free of cracks. On uneven surfaces it is recommended to apply a levelling plaster.
  2. Installation of the supporting structure: the supporting structure for plasterboard usually consists of metal profiles that are fixed to the walls, ceiling or floor with dowels and screws. The spacing of the profiles depends on the type of plasterboard and the required load-bearing capacity of the structure.
  3. Fixing plasterboard: The plasterboards are fixed to the supporting structure with screws. When fitting, it is important to ensure that the boards are correctly aligned and that there are no gaps between them.
  4. Sealing of joints: the joints between the plasterboards are filled with sealant, which is sanded after curing.
  5. Painting: after sealing and sanding the joints, the plasterboard walls and ceilings are painted with the colour of your choice.

In addition to these basic steps, there are also various special techniques and procedures that are used when installing plasterboard. For example:

  • Installation of plasterboard on curved walls: special profiles and techniques are used when installing plasterboard on curved walls.
  • Installation of suspended ceilings: suspended ceilings are made of plasterboard for various purposes, such as covering wiring or lowering the height of a room.
  • Installation of partitions: plasterboard partitions are easy and quick to install, making them a popular choice for zoning.

Assembly:

  • Anchoring the profiles: mount the profile rails (UW) to the walls and ceiling with dowels and screws. Ensure that the dimensions and flatness are precisely observed.
  • Mounting of standing profiles: mount the standing profiles (CW) in the rails and connect them to each other with clips and cross braces. Ensure the correct spacing of the profiles depending on the type of construction and the thickness of the plasterboard.
  • Insulation: Insert insulation material, such as mineral wool, into the cavities in the structure. Insulation will improve the thermal and acoustic insulation properties of the structure.
  • Installation of plasterboards: attach the plasterboards to the profiles with screws. Make sure that the screws are recessed into the surface of the boards and that there are no gaps between the boards.
  • Joining the boards: cover the joints between the plasterboards with reinforcing tape and sealant. This will achieve a smooth and solid surface.

Important:

  • Follow the instructions of the plasterboard and profile manufacturer.
  • Work with precision and ensure the flatness of the structure.
  • Use quality materials and tools.
  • Observe safety regulations when working with electricity.
  • If you are unsure about the installation, contact a professional.

Tips:

  • You can use a laser spirit level to facilitate assembly.
  • Use a special plasterboard knife to cut plasterboard.
  • Before sealing the joints between the boards, sand them with sandpaper.
  • You can use painter's paint or wallpaper to finish the surface.

By following these guidelines and tips, you will achieve professional results when installing drywall and your home will look beautiful and tidy.

Dripping hanging toilet with plasterboard construction

Draining a wall-hung toilet with a plasterboard construction is a great way to hide the cistern and piping while giving your bathroom a sleek and modern look. It's a relatively simple job that even a skilled DIYer can handle.

Materials and tools:

  • Plasterboard (thickness 12.5 mm)(1/2 inch)
  • CD and UW profiles (dimensions according to drip size)
  • Fasteners (screws, dowels, staples)
  • Sealant for plasterboard
  • Reinforcing tape
  • Sandpaper
  • Tools (screwdriver, drill, spirit level, tape measure, drywall knife)

Procedure:

  1. Planning and preparation:
    • Measure the dimensions of the hanging toilet and the cistern. Based on these dimensions, design the dimensions of the gutter. Draw a floor plan and drawings.
    • Choose the profile system suitable for the size of the guttering.
    • Make sure you have enough material (plasterboard, profiles, fasteners).
    • Before installation, remove any objects that might get in the way from the installation site. The work area should be clean and dry.
  2. Assembly of the profile construction:
    • Mount the UW rail profile on the wall above the wall hung toilet using dowels and screws. Make sure that the flatness is exactly level.
    • Mount the CD upright profiles in the rail profile and connect them to each other with a clamp. Make sure that the profiles are spaced at the correct distance depending on the size of the guttering.
    • Mount another UW rail profile on the bottom edge of the profile structure.
  3. Installation of plasterboard:
    • Fix the plasterboard to the profile structure with screws. Ensure that the screws are recessed into the surface of the boards and that there are no gaps between the boards.
    • Apply reinforcing tape to the corners and joints between the boards.
  4. Sealing and grinding:
    • Seal the joints between the plasterboards and the corners with plasterboard putty.
    • After the sealant has dried, sand the gutter surface with sandpaper.
  5. Completion:
    • You can paint or wallpaper the dripping according to your taste.
    • You can mount a cover rail on the bottom of the guttering.

Plasterboard double skin: When and why use it?

Plasterboard double sheathing is a plasterboard installation technique in which two layers of plasterboard are mounted on a supporting structure. There may be an air gap or insulation between the layers of boards. Double skin construction is used in a variety of cases where it is necessary to achieve:

Enhanced sound insulation: the double-skin construction with insulation between the layers of boards can significantly reduce the penetration of noise into the room. This is important in places where quiet is needed, such as bedrooms, offices, recording studios and cinemas.

Better thermal insulation: double skin construction with insulation between the layers of boards can improve the thermal insulation of the room. This means that the room cools more slowly in winter and overheats more slowly in summer. This leads to energy savings for heating and air conditioning.

Increased fire resistance: double skin construction with fire-resistant plasterboard and insulation can increase the fire resistance of a room. This is important in locations with a requirement for increased fire protection, such as stairwells, escape routes and apartment buildings.

Strong and stable construction: double skin construction is stronger and more stable than single skin construction. This is important in locations where high loads are expected, such as walls with heavy shelving or curtains.

Aesthetic effect: the double skin construction allows the creation of various aesthetic effects such as recessed luminaires, niches and reliefs.

When double-skin plasterboard is not recommended:

  • In small rooms where every inch of space is important.
  • In places with low humidity where thermal insulation is not needed.
  • In places with low budgets, because double skin construction is more expensive than single skin.

Installation of atypical plasterboard termination for windows on a hinge or LED strip

Atypical plasterboard finishing at windows is used when you want to create an aesthetically pleasing and functional detail around the window that allows for the installation of a hinge or LED strip. There are a number of ways to do this, and here are two common approaches:

1. Finishing with a plasterboard profile:

  • Material:
    1. Plasterboard profiles (UW and CW)
    2. Plasterboard
    3. Sealant for plasterboard
    4. Screws
    5. dowels
    6. Paper tape
  • Procedure:
    1. Fit the UW profile around the window to form the desired shape of the ending.
    2. Mount the CW profiles on the UW profile at the required spacing.
    3. Attach the drywall to the CW profiles to form the desired termination shape.
    4. Seal and sand the joints between the plasterboards.
    5. Apply the final finish (painting, wallpapering) to the wall and finish it off.
    6. To finish, fit the hanging rail or the profile for the LED strip.

2. Finishing with a plasterboard box:

  • Material:
    1. Plasterboard
    2. Sealant for plasterboard
    3. Screws
    4. dowels
    5. Paper tape
  • Procedure:
    1. Cut the parts out of the plasterboard to form the desired shape of the box.
    2. Join the parts of the box with screws and sealant.
    3. Seal and sand the joints between the box parts.
    4. Apply the final finish (painting, wallpapering) to the wall and the box.
    5. Install a hanging rail or profile for the LED strip in the box.

Important tips:

  • Before installation, think about the desired shape of the termination and measure the dimensions of the window.
  • Use a sharp knife and ruler when cutting plasterboard.
  • When installing profiles and boards, make sure that all joints are tight and straight.
  • Allow the sealant to dry completely before applying the final finish.
  • When installing the curtain rail or the profile for the LED strip, follow the manufacturer's instructions.

Advantages of atypical termination:

  • Aesthetically pleasing detail
  • Possibility of mounting a hinge or LED strip
  • Covering of irregularities and defects
  • Possibility to create different shapes and designs

Disadvantages of atypical termination:

  • More complex assembly than conventional termination
  • Higher material price
  • Reduction of the useful area of the room

Conclusion: plasterboard is a modern building material that offers a wide range of applications in various construction works. Thanks to its properties and ease of installation, it is a popular choice for both DIY and professional builders. By following the correct procedures and using quality materials, you can achieve professional results and create aesthetic and functional spaces.