Transport and cleaning

Transport and cleaning

Transport and cleaning

12.01.2026 9 minutes read
For your renovation or construction, a large amount of materials and equipment or tools are needed by the craftsmen. The minimum vehicle you will need is a van, as a family vehicle will not even be enough to transport the tiles. Bathroom and toilet tiles weigh approximately 1 tonne.

Price for transport and cleaning

Average cost of transporting material

250.00 €/ks
AVERAGE PRICE

Updated 31.12.2024 09:16

Transport and cleaning and their benefits

Think about cleaning

Site cleaning is a large-scale job

Construction waste is heavy

Count on construction waste weighing several tonnes

Your own vehicle will not be enough

You can't transport several tons of construction material with your own vehicle

Other prices for transport and cleaning

Transport of materials

For your renovation or construction, a large amount of materials and equipment or tools are needed by the craftsmen. The minimum vehicle you will need is a van, as a family vehicle will not even be enough to transport the tiles. Bathroom and toilet tiles weigh approximately 1 tonne (2205 lbs).

You also have to take into account the cost of transporting floor coverings, doors and door frames, or other furnishings.

Concrete, tile adhesives, electrical and plumbing materials, trowels, painters' compounds, etc. are usually provided by the construction company or foreman, but you need to check the price of transport.

The construction industry works with materials that are heavy in weight and often in volume, 

  • Planning: it is important to plan the transportation of materials and construction waste before the renovation begins. The volume of materials, availability of parking space and the duration of the renovation should be considered.
  • Hire a vehicle: depending on the volume of materials and construction waste, it may be necessary to hire a van or lorry, unless transport is provided by the foreman himself - usually at an additional cost.
  • Transportation of materials: materials for reconstruction must be transported to the construction site in a timely and safe manner. Care must be taken to ensure that materials are protected from weather damage, and good neighbourly relations must be maintained.
  • Construction waste removal: Construction waste must be taken to a landfill. Please ensure compliance with waste management regulations.

Cleaning up after construction work

Renovation is a messy process as well. In addition to construction debris, there is a lot of dust, packaging from used materials, from covering up and so on. The final cleaning is usually carried out by yourself, the rough cleaning should be priced by a builder or company, as there may be several tons of material that needs to be disposed of correctly, and this also has its price. The most expensive part of the cleaning work on site is usually the removal of rubbish.

If you are renovating an apartment, you should also count on the price of cleaning before entering the apartment building, common areas, corridors and the elevator, which in addition needs to be done several times already during the renovation work due to the fact that it is a common area with your neighbours who will not tolerate a few weeks of mess in the common areas.

  • Rough cleaning: after the renovation work is finished, a rough cleaning is necessary. This includes the removal of construction waste, dust and dirt.
  • Final cleaning: final cleaning includes window cleaning, staircase cleaning, dusting and furniture polishing.
  • Removing protective films: remove protective films from windows, floors and furniture.

Important tips for cleaning on site

  • Get enough bags for construction waste before you start renovating.
  • Use protective films of sufficient thickness to protect floors and furniture from damage
  • Ventilate the premises regularly during renovation and cleaning.
  • Wear protective gloves and goggles or a respirator when working with chemicals.
  • When you have finished cleaning, check that all surfaces have been thoroughly cleaned.

Conclusion: transport and cleaning after a complete renovation are an important part of the whole process. By planning carefully and following these tips, you can ensure that the renovation goes smoothly and seamlessly and that your home is clean and your neighbours are happy when the work is finished.

Movement of building materials on site

Moving building materials on site is an important part of construction and renovation work. It is important that this activity is carried out efficiently, safely and with a view to minimising the risk of damage to the material.

Transfer planning:

  • Routing: Before moving the material, it is important to plan the route that the material will be transported along. The route should be as short and safe as possible to avoid unnecessary lifting and carrying of material.
  • Suitable transport: a hand truck, pallet truck, lorry, crane or other suitable machinery may be used to move the material. The choice of transport depends on the type and volume of the material as well as the distance over which it must be transported.
  • Material protection: the building material should be protected from weather and mechanical damage during transport. Tarpaulins, foils and other protective materials are used for this purpose.
  • Coordination of work: if there are several workers on site, it is important to coordinate the work when moving materials to avoid accidents and unnecessary delays.

Safety at work:

  • Compliance with safety regulations: when working with construction materials, it is important to comply with safety regulations and use protective equipment such as helmets, gloves and safety shoes.
  • Lifting heavy objects: when lifting heavy objects, ensure proper lifting technique to prevent injuries to the body - back.
  • Cargo stability: When transporting material on a trolley or other mechanism, ensure that the load is securely fastened to prevent it from tipping over.
  • Watch out for obstacles: make sure that there are no obstacles along the material transfer route that could cause you to trip or fall.

Tips for efficient material transfer:

  • Make use of available equipment such as trolleys, cranes and other machinery to make the job easier and save time.
  • Plan the move route in advance and minimize unnecessary lifting and carrying of materials.
  • Coordinate with other workers on site to avoid accidents and delays.
  • Be safe at work and follow safety regulations.
  • Keep the workplace clean and tidy to prevent accidents.

Conclusion: removal of rubble and movement of building materials are an important part of construction and renovation work. Careful planning, using the right equipment and following safety regulations can ensure that these tasks are carried out efficiently and safely.

Taking rubbish and waste to the collection container

Taking rubbish and construction waste to the collection container is a common part of construction work and reconstruction. It is important to dispose of construction waste responsibly and with respect for the environment and the regulations in force in your locality. You can order a collection container for construction waste from a waste disposal company.

The procedure for plotting:

  1. Waste sorting: Before taking waste to the collection container, sort it according to the type of material. This includes separating municipal waste, construction waste, paper, plastic, glass and bio-waste.
  2. Suitable container: use the correct collection containers for the type of waste. For large volumes, do not use containers designed for household waste
  3. Protective equipment: wear protective gloves when working with debris and waste to prevent injury.
  4. Removal method: rubble and waste can be removed manually in bags, wheelbarrows, by trolley, crane or lift.
  5. Compliance with regulations: when dealing with construction waste and municipal waste, comply with the waste management regulations.

Important tips:

  • Make use of available technology such as trolleys, cranes and lifts to make the job easier and save time. Count on the fact that construction waste is heavy, and renovating a typical apartment can involve tons of waste.
  • Be safe at work and follow safety regulations.
  • Do not overload collection containers and use more than one container if necessary.
  • Keep the area around the collection containers clean and tidy.
  • If in doubt about the type of waste, check with your local council or waste management company.

Benefits of responsible waste disposal:

  • Environmental protection
  • Reduction of air and soil pollution
  • Increase recycling of materials
  • Saving money on waste collection
  • A good example for others

Import and purchase of consumables

Importing and purchasing building supplies is part of the operation of companies and craftsmen. It is important to choose a reliable supplier who will take care of the materials that will be needed.

Import and purchase procedure:

  1. Determining your needs: it is important to be clear about your needs before buying building supplies. This includes determining the type and quantity of materials needed, as well as the frequency of purchase.
  2. Supplier selection: Based on the defined needs, it is necessary to choose a reliable supplier of consumables. It is important to consider the following factors when selecting a supplier:
    • Product offer: the supplier should offer a wide range of consumables of the required quality and at reasonable prices. The best-known vendor may not be the best value for large volumes.
    • Delivery: the Supplier should ensure timely and reliable delivery of the goods.
    • Customer Service: the Supplier should provide quality customer service, including advice, complaint handling and technical details.
  3. Order goods: After selecting the supplier, you need to order the desired goods. The order should contain the exact specification of the goods, the quantity required, the delivery date and the delivery address. The foreman or construction company will help you with this
  4. Receipt of goods: Upon delivery of the goods, it is important to check their condition and quantity. In case of any discrepancies it is necessary to contact the supplier.
  5. Storage of goods: Consumables should be stored in a suitable location that is protected from moisture, dust and extreme temperatures.

Important tips:

  • Compare prices and quotes from several companies before choosing a contractor.
  • Use online tools to compare prices and find reliable suppliers.
  • Enter into a written contract with the supplier that includes all important terms of purchase, such as pricing, delivery dates and payment terms.
  • Regularly check the stock of consumables and replenish missing goods in a timely manner.
  • Follow the manufacturer's instructions for storage and use of consumables.

Benefits of efficient import and purchase of consumables:

  • Cost reduction
  • Ensuring timely delivery of goods
  • Availability of quality consumables
  • Increase work efficiency
  • Better organisation and control of inventory

The import and purchase of consumable building materials is an important part of the operation of companies and organisations. By planning carefully, selecting a reliable supplier and following the correct procedures, you can ensure that consumables are available on time and to the required quality, contributing to the efficient running of your business or organisation.