nahlad

Demolition of the old kitchen unit price

Planning to renovate your kitchen but unsure how to go about removing the old kitchen unit? Demolishing the kitchen unit is a key step that prepares the space for new appliances, modern utilities, and aesthetic upgrades. Proper execution and professional expertise are essential for this task to avoid unnecessary complications. Read on to learn everything you need to know about this service, including costs, process, and tips to save money.

Price for demolition of the old kitchen unit

Average Cost of Demolishing an Old Kitchen Unit

Calculate the price of construction works

368,0 £/psc

Average price Updated 10.01.2025 14:58

Other prices for demolition of the old kitchen unit

Demolition work Price 03.06.2025

Price The price shown is only for labor (handwork) without material. The price of construction works is usually final for natural persons. If the customer is a legal entity (company), the calculation of VAT is based on the agreement with the contractor, depending on whether the contractor and the customer are VAT payers or non-payers.

Quantity

Sum

Demolition of the old kitchen unit

119,6 £

psc

0 £

Demolition of the old kitchen unit and their benefits

Precise preparation of the space for a new kitchen

After removal, everything is clean and ready for the new kitchen unit.

No worries about waste

You don't have to worry about where to dispose of the waste – the company will take care of its removal and disposal for you.

Apartment protection

Professionals work meticulously to protect floors, walls, and surrounding equipment from unnecessary damage.

Demolition work is an integral part of any renovation, with one of the most common tasks being the removal of the old kitchen unit. This step is essential not only for modernizing the kitchen but also for replacing utilities or improving the functionality and aesthetic appeal of the space.

If you are preparing for a kitchen renovation, this article will provide all the necessary information: from reasons for removing the old unit, through the precise process of the work, to the factors affecting the cost of demolition work. Additionally, we will include practical tips to help you plan and execute the project.

Why is Removing the Old Kitchen Unit Important?

An old kitchen unit often no longer meets today’s requirements for functionality, aesthetics, or ergonomics. Removing it creates space for new, more modern solutions. The main reasons for deciding to remove the old unit include:

  1. Replacing Utilities
    Behind the old kitchen unit, there are usually water and electrical lines that need to be checked, repaired, or completely replaced during a renovation.
  2. Modernizing the Space
    The old unit may be outdated, damaged, or impractical. Removing it allows you to install modern appliances and use the space more efficiently.
  3. Improving Hygiene
    Dirt, moisture, or mold often accumulate under the kitchen unit, posing a hygiene risk to the household. Demolishing the unit allows for thorough cleaning and preparation of the space for new solutions.
  4. Preparing for New Kitchen Equipment
    When planning a modern kitchen, it is essential to remove old components to accurately fit new equipment and furniture.

Calculate the price of construction works

How is the Old Kitchen Unit Removed?

The process of removing the old unit requires professional expertise to avoid damage to utilities, walls, or flooring. Professional companies follow these steps:

  1. Preparing the Space
    Before starting work, the kitchen must be cleared of all items that could be damaged. Appliances such as the refrigerator, stove, or dishwasher are dismantled. Protective foil or cardboard is used to safeguard the floor and surrounding surfaces.

  2. Disconnecting Utilities
    Experienced professionals first disconnect water, gas, and electrical connections to prevent leaks or damage to electrical lines.

  3. Dismantling the Kitchen Unit
    Individual parts of the kitchen unit are removed step by step, starting with the upper cabinets and continuing with the lower ones. Hand tools or specialized equipment are used to ensure precise and safe work.

  4. Removing Tiles or Additional Elements
    If tiles or old surface finishes remain behind the unit, they need to be removed to prepare the space for new equipment.

  5. Waste Removal
    After the work is completed, it is crucial to ensure the eco-friendly disposal of all waste, including wood, metal, plastic, and other materials.

Calculate the price of construction works

Factors Influencing the Cost of Removing the Old Kitchen Unit

The cost of demolition work for removing the kitchen unit depends on several factors, including:

  1. Size of the Kitchen and Scope of Work
    Costs increase proportionally to the size of the unit and the scope of the dismantling. If tiles, floors, or appliances also need to be removed, the expenses will be higher.
  2. Material of the Unit
    Kitchen units made of solid wood or metal are more challenging to dismantle, which can raise labor costs.
  3. Accessibility of the Space
    In smaller kitchens or spaces with limited access, the work can be more complicated, affecting the price.
  4. Waste Removal and Disposal
    If the company provides waste removal and disposal, the cost may increase depending on the volume and type of waste.
  5. Location of the Property
    The cost of demolition work varies by region. In larger cities, expenses are often higher due to greater demand for specialists.

What is the cost of demolishing an old kitchen unit?

The average cost of demolishing an old kitchen unit ranges between £200 and £600, depending on the factors mentioned above.

This price includes dismantling the unit, disconnecting utilities, and basic cleaning. If you also request waste removal and disposal, the final amount may increase by an additional £100 to £200.

For an exact estimate, we recommend using the Numiq Project Calculator, which provides a detailed overview of costs tailored to your needs.

Calculate the price of construction works

Why Choose Professionals for Kitchen Unit Removal?

Professional expertise in dismantling the kitchen unit ensures:

  1. Work Safety: Professionals ensure that utilities, walls, or floors are not damaged.
  2. Efficiency: With experience and the right tools, the work is quick and of high quality.
  3. Eco-Friendly Waste Disposal: Professionals ensure proper disposal of materials according to regulations.
  4. Time Savings: You don’t have to deal with removing old equipment or cleaning up after the work.

How to Save on Removing the Old Kitchen Unit?

  1. Compare Quotes
    Request estimates from several companies and choose the one offering the best price-to-quality ratio.
  2. Prepare the Space Yourself
    Removing small items, such as dishes or small appliances, can reduce labor costs.
  3. Choose a Local Company
    Regional companies have lower transportation costs, which can influence the final price.
  4. Use the Numiq Calculator
    This tool provides an accurate cost estimate based on your requirements and local conditions.

What to Take Away from This?

Removing the old kitchen unit is an important step in kitchen renovation that requires professional expertise. Professional demolition work ensures safety, quality, and time savings. If you want to know the exact cost of this work, use the Numiq Project Calculator, which provides a reliable estimate of all expenses.

Calculate the price of construction works

Chyba

close