8 Tips for Repairing Your Irrigation System

8 Tips for Repairing Your Irrigation System

8 Tips for Repairing Your Irrigation System

A
Admin
1.0k x 1 minute read
Your irrigation system does an excellent job keeping your lawn and plants healthy, but it is exposed to external factors: temperature fluctuations, frost, snow, ice, water pressure, tree roots, and animals.

The sensitive electronics in any underground automatic system can fail over time. Valves and hoses, often made of lightweight plastic, can crack or break.

Good news: repairing your irrigation system is relatively simple and inexpensive. Replacement parts, such as hoses, elbows, and valves, usually cost only a few dollars and can be replaced individually without digging up the entire system.

1. Clean the Sprinkler Heads

Sprinkler heads can quickly become clogged with dirt and debris, affecting water distribution and causing dry or brown spots. Regular cleaning ensures smooth system operation.

2. Replace the Valves

If sprinklers are not popping up, not turning on, or have low water pressure, the issue may be with the valves. Replacement may require cutting plastic pipes, depending on the system.

3. Repair a Faulty Valve by Replacing the Solenoid

The solenoid acts like a small “door” inside the valve that opens and closes in milliseconds. Replacing it is quick and easy, usually taking about 5 minutes.

4. Winterize Your System

Drain all water and store above-ground components in a dry, warm place to prevent frost damage.

5. Locate Leaks

Check for wet spots or taller, greener grass – these could indicate a leak.

6. Repair Damaged Wires

Damaged wires disrupt communication between valves and the controller. Repair or replace them to restore proper system function.

7. Don’t Ignore Disconnected Wires

Disconnected wires can also cause system failures. Identify the cause and reconnect immediately.

8. Repair Leaking Pipes

If an underground pipe is leaking, carefully dig up the damaged section and replace it. Flexible pipes make repairs easier.

Photo credit: Süleyman Şahan

Related articles

How to build a garden terrace

How to build a garden terrace

Building a garden terrace creates a comfortable and inviting space for family and friends. It offers a place to enjoy outdoor dining, barbecues or simply a quiet moment with a cup of coffee. A terrace is also a valuable feature for any property and can significantly increase its appeal and resale value. Constructing a terrace does not have to be overly complicated if the process is planned properly and broken down into clear, manageable steps. Careful preparation and attention to detail are essential for creating a stable and long lasting structure.

4 minutes read 1.0k x
A
Admin
How to improve the security of your garden

How to improve the security of your garden

Owning a well designed and attractive home is something to be proud of, but security is even more important. Your home contains valuables you have worked hard for, as well as the people you care about most. For that reason, reliable locking systems should always be combined with additional security measures such as cameras or alarm systems.

3 minutes read 3.0k x
A
Admin
How to lay a stone patio

How to lay a stone patio

A stone patio is an elegant and durable addition to any home. Installing one is not as complicated as it may seem at first glance. You can use a variety of materials, from flat natural stone slabs and smooth square slate to rough limestone paving.

5 minutes read 2.0k x
A
Admin