Demolition of partitions - brick

12.01.2026 3 minutes read
Planning to renovate your apartment or house and decided to remove some partitions? The demolition of brick partitions is one of the most common modifications during renovations. However, this process requires a professional approach and the right tools. To help you better understand what this type of demolition work involves, let's take a closer look at the details, advantages, disadvantages, and, most importantly, what constitutes the cost of construction work.

Price for demolition of partitions - brick

The average cost of demolishing a brick partition

15.95 €/m²
AVERAGE PRICE

Updated 15.01.2025 12:21

Demolition of partitions - brick and their benefits

Precise cost calculation

With Numiq, you know in advance how much you will pay.

Safety and professional approach

Experts demolish partitions without the risk of damaging the structure.

Speed and efficiency

Experienced professionals complete the work quickly and efficiently.

Other prices for demolition of partitions - brick

How does the demolition of brick partitions proceed?

The demolition of partitions begins with thorough planning. Before starting, it is essential to determine whether the partition is load-bearing or non-load-bearing. Load-bearing partitions play a crucial role in the building's structural integrity, so if you want to remove them, you must obtain a structural assessment and permission.

Steps of demolition work:

  1. Space preparation: First, the area is covered with protective sheets to minimize the spread of dust and prevent damage to other parts of the interior.
  2. Removal of electrical wiring and pipes: If utilities run through the partition, they must be safely removed or relocated.
  3. Demolition work itself: Brick demolition involves tools such as hammers, chiseling machines, or electric breakers. Professionals work precisely to avoid damaging adjacent structures.
  4. Waste disposal: Demolition generates a significant amount of construction waste that must be disposed of in an eco-friendly manner.

What affects the cost of demolition work for partitions?

The cost of demolition work depends on several factors. The most important include:

  1. Thickness and material of the partition: Brick partitions can vary in thickness, affecting the difficulty of demolition. Thin partitions are easier to demolish than thick load-bearing walls.
  2. Scope of work: Smaller tasks, such as removing one partition, will cost less than a complete space renovation.
  3. Location: The cost of construction work may vary by region. For example, prices tend to be higher in cities than in rural areas.
  4. Transport and waste disposal: The removal of construction waste can increase the total cost. However, this step is essential to maintain a clean and safe environment.
  5. Technical demands: If the partition is load-bearing, additional costs for structural assessments or installing support beams must be considered.

What is the cost of demolition work for brick partitions?

The cost of demolishing partitions typically ranges from £40 to £80 per square meter. This price includes labor, basic tools, and protective measures. For more complex tasks, such as the removal of load-bearing walls, the cost can rise to £100 or more per square meter.

An important factor to consider is the cost of waste disposal, which usually ranges from £15 to £30 per cubic meter. Therefore, it is advisable to account for these expenses in your budget.

Why choose professionals for demolition work?

While demolishing partitions might seem straightforward, it is a process that requires experience and specialized equipment. Poorly executed work can damage the rest of the structure or cause issues with the building's stability. Professional builders ensure:

  • Safety during the work.
  • High-quality execution in compliance with building regulations.
  • Fast and efficient progress without unnecessary complications.

Tips for customers:

  1. Compare prices: Use online tools like Numiq to compare costs. A price list of construction work will help you better understand the expenses and choose the most advantageous offer.
  2. Request a quote: Before hiring, ask multiple companies to prepare a detailed calculation of the costs.
  3. Check references: Inquire about the experiences of customers who have worked with the company.
  4. Plan ahead: If planning a major renovation, book professionals well in advance. Quality builders are often in high demand.

Final recommendation...

The demolition of brick partitions is a critical step in renovations that significantly affects the appearance and functionality of your space. Properly planned and professionally executed demolition ensures not only an aesthetic result but also the safety of the entire structure.

Remember, quality services are always worth the investment. To get a precise idea of the costs, use our construction work price list. This way, you can be confident that you're investing in a solution offering the best value for money.