Removal of tiles and paving

12.01.2026 5 minutes read
The removal of tiles and paving is one of the most common demolition tasks during bathroom, kitchen, or hallway renovations. Whether it's renovating an old space, replacing damaged materials, or creating a modern design, the correct removal of existing layers is crucial. Unprofessional removal of tiles or paving can damage the underlying surface or cause issues during the subsequent installation of new materials. For this reason, it is recommended to entrust this task to professionals who have the experience, proper tools, and the ability to minimize risks.

Price for removal of tiles and paving

The average cost of removing tiles and paving

8.50 €/m²
AVERAGE PRICE

Updated 10.01.2025 14:57

Removal of tiles and paving and their benefits

Protection of walls and floors

During removal, surrounding surfaces are protected to prevent damage to the walls and floor.

Less dust and quick removal

The right tools ensure less dust and careful removal.

Eco-friendly waste disposal

Professionals take care of the transportation and proper disposal of construction waste.

Other prices for removal of tiles and paving

What work does the removal of tiles and paving include?

The removal process is not just about taking away the visible parts of tiles and paving. This process requires a systematic approach to prevent damage to walls or floors. It is also necessary to consider protecting other parts of the room where the work is taking place. Every demolition operation includes these basic steps:

  1. Preparation of the area – Protecting furniture, electrical installations, and plumbing is essential to avoid damage.
  2. Removing tiles and paving – Using special tools, such as chiseling hammers, tiles and paving are gradually removed. It is important to use the tools correctly to avoid cracks in the masonry or the base layer.
  3. Waste disposal – Demolition work produces a significant amount of waste, which must be properly and environmentally disposed of. Professional companies often include waste removal as part of their service.
  4. Substrate preparation – After removing the old material, the area is prepared for new installation, including leveling, cleaning, and repairing the substrate layers if necessary.

These steps are carried out systematically to ensure cleanliness, safety, and readiness for the next stages of reconstruction.

Why choose professionals for demolition work?

The removal of tiles and paving may seem like a simple process at first glance, but improper handling can lead to several complications. During demolition, challenging materials are often handled, which can be difficult to remove. If the process is not performed correctly, walls, floors, or nearby installations may be damaged. In kitchens and bathrooms, water and electrical installations are embedded in the walls and must be protected. Professional companies have the experience and specialized tools to carry out the work quickly, safely, and without unnecessary damage.

When working with older materials, their condition and age must also be considered. For instance, tiles installed decades ago may be attached with stronger adhesives and sturdier materials, making their removal significantly more challenging. In such cases, professionals can use special techniques to safely remove the materials without damaging the surrounding parts of the room.

Price List for Construction Work – What Are the Costs of Removing Tiles and Paving?

The cost of removing tiles and paving depends on several factors. Indicatively, the price is around:

  • Tile removal – cost: £7–£13/m²
  • Paving removal – cost: £40–£110 /m²

These amounts include basic labor costs and waste removal. However, prices may vary depending on the complexity of the project, the type and thickness of the material, and the potential need for special tools.

Factors that may influence the final cost of construction work include:

  • The scope of demolition work and the size of the area
  • The type and thickness of the material (e.g., ceramic tiles or stone)
  • The need to remove the substrate layer or adhesive
  • Eco-friendly disposal and waste removal

Every project is unique, and it is important to discuss all the details with professionals to determine the exact budget. Numiq offers accurate calculations, allowing you to get a clear overview of costs in advance, thanks to our construction work price list

 

 

How does material quality affect the work?

An essential part of preparation is assessing the original material. For instance, ceramic tiles may be firmly attached with quality adhesives that require special removal techniques. In some cases, a combination of manual and mechanical methods is needed to remove the tiles without damaging the wall. For paving, issues can arise with the thickness and strength of the surface material. If the flooring involves hard materials such as stone or concrete, removal becomes more time-consuming and technically demanding.

Eco-friendly waste disposal – why is it important?

Proper disposal of construction waste is an integral part of demolition work. Removing tiles and paving generates a significant amount of waste that cannot simply be discarded in regular landfills. Professional companies ensure the waste is transported to designated sites where it is processed and recycled. Recycling construction materials helps reduce environmental impact, as materials such as ceramics or concrete can be repurposed into new products. Companies offering eco-friendly solutions also save you time and energy while ensuring compliance with regulations.

Why use the Numiq calculator?

Accurate calculations are essential for demolition work. The Numiq construction work calculator provides an overview of all costs and simplifies budget planning. Whether you are renovating a bathroom, kitchen, or a larger area, our calculator precisely estimates the cost of construction work, helping you optimize expenses and avoid unexpected costs. Based on extensive experience and a detailed price list of construction work, you gain a transparent and realistic overview of all steps ahead.

 

 

What benefits does professional removal of tiles and paving bring?

Professional removal of tiles and paving offers several advantages:

  1. Precision and risk minimization – Every renovation has its specifics, which professionals take into account. With an unprofessional approach, there is a risk of damaging the masonry or puncturing pipes.
  2. Time and effort savings – Professionals have the equipment that allows for faster and more efficient removal of tiles and paving.
  3. Cleanliness and eco-responsibility – Services include waste disposal, so you don’t have to worry about transport, sorting, or landfills.
  4. Work safety – Experts ensure that the work is carried out safely, which is especially important in rooms with water and electrical installations.

With these benefits, you can be confident that the removal of tiles and paving will be carried out efficiently and safely. If you are planning a renovation or replacement of old tiles, do not hesitate to use the services of professionals who will guide you step by step through the entire process.

By using the Numiq construction work calculator, you gain a clear and realistic estimate, ensuring your project is well planned and efficiently executed.