Where Can You Save Money During a Renovation?

Where Can You Save Money During a Renovation?

Where Can You Save Money During a Renovation?

A
Admin
4.0k x 4 minutes read
Almost everyone who starts a construction or renovation project focuses primarily on their budget. It’s no secret that expensive exterior elements can quickly drive renovation costs upward. However, many people overlook the fact that interior elements and finishes can also have a dramatic impact on the final renovation price.

Fortunately, unlike exterior features, interior elements can be much more easily adapted to both your personal taste and your budget. Let’s take a look at the key areas where you can save money during an interior renovation.

1. Wall paint

The cost of painting walls can be surprisingly high, especially if you choose multiple colors or patterns. Every time a painter switches colors, they must ensure clean, sharp transitions, which takes extra time. The more colors involved, the higher the cost.

If you want to reduce painting expenses, limit the number of colors you use. Also consider reducing the number of accent walls painted in a different color than the main one. Every transition around ceilings, trim, or light switches requires precision, increasing both labor time and cost.

2. Tiles and wall coverings

Choosing different tiles for floors and walls can significantly increase the cost of a bathroom renovation, especially if you opt for unusual shapes or complex patterns. In such cases, installation takes longer because the tile setter must carefully align the pattern. Instead of charging per square foot, contractors may charge by the hour.

Additionally, tiles often need to be cut to fit specific spaces. The more cutting required, the more material is wasted.

Tip: If you like patterned tiles, choose simple shapes that minimize waste and installation time. Also limit the area covered by decorative tiles.

Simple, single-color tiles can give your bathroom a clean, elegant, and high-end look while reducing waste and overall costs. Using the same tile type in multiple rooms may also qualify you for bulk discounts.

Tip: Natural stone, ceramic, and porcelain are the most common tiling materials. Ceramic tiles often provide the look of natural stone at a fraction of the cost and are easier to install.

3. Window frames

Window frames are typically made of wood, aluminum, or—if budget allows—steel. There are several ways to save money on windows, but the simplest is choosing a more affordable profile. For example, aluminum frames are available in commercial, semi-commercial, and residential profiles, with semi-commercial options often being much less expensive.

As a general rule, the more windows a home has, the higher the overall cost. Maximize glazing in living spaces where you want natural light and views, and minimize it in areas that are used less frequently.

Tip: Larger windows are heavier, which can increase transportation and installation costs. In some cases, two smaller windows placed side by side can be significantly cheaper than one large window.

4. Drawers and cabinets

Kitchen drawers provide excellent storage and make organization easier—you can see everything at a glance. However, drawers are significantly more expensive than standard cabinets with doors. While cabinet doors only require simple hinges, drawers need sliding mechanisms, which increases costs.

The more drawers you install, the higher the total cost of your kitchen renovation.

Tip: If you plan to install many drawers, carefully consider the type of drawer slides. Differences in quality, features, and price can greatly affect not only the cost of the drawers but the overall kitchen budget.

5. Kitchen cabinetry and countertops

There are many materials available for kitchen countertops, including laminate, natural stone, engineered stone, wood, and modern eco-friendly materials. However, choosing the material is only part of the decision.

The size and layout of the kitchen also play a major role in the final cost. The more cabinetry and countertop space you need, the higher the price will be. Even choosing a less expensive material doesn’t always guarantee a low overall cost. To get a realistic estimate, review pricing lists for installation and labor.

6. Lighting

Electricians typically charge for lighting installation based on the number of fixtures installed. The more ceiling lights you have, the higher the labor and installation costs.

Additionally, more lighting means higher electricity bills. Limiting the number of light fixtures and placing them strategically where light is truly needed may take more planning, but it can significantly reduce both installation and long-term energy costs.

Tip: Some lighting suppliers offer free lighting design services tailored to your space and needs. This can save money and result in a well-thought-out lighting plan, though it often requires purchasing all fixtures from the same supplier.

7. Light switches and electrical outlets

Light switches and electrical outlets have become design elements in recent years. However, choosing non-standard shapes or colors can drastically increase your budget. While many models offer additional features, they all essentially serve the same purpose—turning electricity on and off.

Electricians may also charge extra for installing special fittings. If non-standard wall openings are required, you can expect additional electrical labor costs.

Tip: Use simpler, more affordable switches in less visible areas such as inside cabinets or pantries. Save premium and designer models for highly visible rooms and spaces.

Photo: Alesia Kozik, Pexels

Related articles

7 Things You Need to Know Before Renovating Your Flat or House

7 Things You Need to Know Before Renovating Your Flat or House

You know you want to renovate your flat or house, but you are not quite sure where to start. You are not alone. Many homeowners jump into a renovation project without fully understanding what lies ahead.

4 minutes read 1.0k x
A
Admin
Restoring Original Parquet Floors: Why Refurbishing Old Flooring Is Worth It

Restoring Original Parquet Floors: Why Refurbishing Old Flooring Is Worth It

Old wooden floors carry a unique character that is difficult to replicate in modern new builds. Restoring original parquet blocks is not only an environmentally responsible decision, but also an investment in the timeless beauty of your interior. A professionally refurbished wooden floor can often outperform brand new materials in both appearance and longevity.

4 minutes read 213 x
A
Admin
Floor levelling: what it is and why you should never skip it

Floor levelling: what it is and why you should never skip it

An uneven floor can be a hidden issue that gradually turns into a visible and expensive mistake. Properly levelling the surface before installing a floor covering is essential for both durability and appearance. Many people underestimate this step or skip it entirely, only to face problems later such as bubbles, warping or cracks. This is why floor levelling is a crucial stage in every renovation and new build. In this article, you will learn why a high-quality levelling base is so important and how it should be carried out correctly.

10 minutes read 321 x
A
Admin