Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Foundations | ||||
| Concrete foundation for fence | m³ | 70,16 € | - | |
| Fencing | ||||
| Laying concrete fence blocks | pcs | 4,00 € | - | |
| Building fence piers | lm | 22,05 € | - | |
| Install concrete fencing up to 1.8 m | lm | 20,05 € | - | |
| Install concrete fencing up to 2.1 m | lm | 23,05 € | - | |
| Install concrete fencing up to 2.4 m | lm | 24,06 € | - | |
| Fencing with DT 12/15 blocks | m² | - | ||
| Fencing with DT 20/25 blocks | m² | - | ||
| Remove old fencing | lm | 1,00 € | - | |
| Install fence post up to 2.4 m | pcs | 1,40 € | - | |
| Install fence post up to 2.7 m | pcs | 1,70 € | - | |
| Install fence post up to 3.8 m | pcs | 3,00 € | - | |
| Install fence strut up to 2.7 m | pcs | 1,70 € | - | |
| Install barbed wire extension arm | pcs | 1,40 € | - | |
| Tension straining wire | lm | 0,14 € | - | |
| Tension barbed wire | lm | 0,14 € | - | |
| Install fence frame | pcs | - | ||
| Install bespoke fence frame | pcs | - | ||
| Install fence panels | pcs | - | ||
| Install mesh fencing up to 1.4 m | lm | 1,70 € | - | |
| Install mesh fencing up to 1.8 m | lm | 1,90 € | - | |
| Install mesh fencing over 3.0 m | lm | 3,70 € | - | |
| Blockwork corner bonding | pcs | 1,00 € | - | |
| Other works | ||||
| Other unspecified work in trade | hr | - | ||
What types of fences are most common and which should you choose?
Choosing the right fence is one of the key decisions when enhancing a property. Each type has its advantages and disadvantages, so it’s important to consider the purpose, budget, and maintenance requirements. In practice, you’ll most commonly encounter several proven solutions.
Wire mesh fencing as an economical solution
Wire mesh fencing is among the most affordable fencing options. It is ideal for large properties, gardens, or temporary solutions. Its advantages include quick installation and low cost, typically ranging from 10 to 25 € per linear metre, including labour.
The downsides are lower strength and minimal privacy. Therefore, it is often combined with a hedge or screening fabric.
Panel fencing for modern residential properties
Panel fences represent a modern and very popular solution. They are characterised by strength, long lifespan, and a clean design. They are particularly suitable for modern residential fencing, where visual appeal plays an important role.
The cost for such a solution typically ranges from 30 to 70 € per linear metre, with the final price depending on height, surface finish, and terrain complexity.
Concrete fencing for maximum privacy
If you’re looking for complete separation from your surroundings, a concrete fence is the best choice. It provides a high degree of privacy, reduces noise, and has a long lifespan.
On the other hand, it is a more financially demanding solution. The cost for concrete systems can reach 80 to 150 € per linear metre, especially if foundations and installation are included.
Timber fencing for aesthetics and a natural look
Timber fences offer a natural and aesthetic appeal. They are particularly suitable for gardens or traditional homes, complementing the architecture.
However, regular maintenance is required. The cost of timber fencing typically ranges from 40 to 100 € per linear metre, depending on the type of wood and surface treatment.
Metal fencing for long lifespan
Metal fences offer high durability and minimal maintenance. They are often custom-made, allowing for tailored design and security features.
Such solutions usually come with a higher cost for metal fencing, ranging from 70 to 150 € per linear metre. However, the advantage is their long-term durability and distinguished appearance.
How to choose the right type of fence?
When making your choice, consider these factors:
- purpose of the fencing – security, privacy, or aesthetics
- budget – price differences can be significant
- terrain complexity – a sloped property increases installation costs
- maintenance – some materials require regular care
Based on the experience of installation companies, most customers choose a compromise between cost and quality. This is why panel fences are currently one of the most common solutions, offering a good balance between price and lifespan.
How does bespoke fence manufacturing work?
Bespoke fence manufacturing offers a solution where every detail can be customised to the specific property and requirements. Compared to mass-produced systems, you gain greater flexibility, more precise workmanship, and often a superior overall appearance. However, this process requires thorough preparation and coordination of several steps.
Design and site survey
The entire process begins with a precise site survey. An expert will assess the terrain, slope, property boundaries, and access options. Based on this data, a design will be prepared that considers not only technical requirements but also aesthetics.
Accurate surveying has a fundamental impact on the final cost of fence installation, as it eliminates additional adjustments and errors during assembly.
Material and design selection
In the next step, you choose the material and visual design. This can be a combination of metal, timber, or concrete. Modern installations often utilise combined solutions that blend functionality and design.
When choosing, it’s important to consider:
- weather resistance
- maintenance requirements
- overall property appearance
Manufacturing process of individual components
The actual manufacturing takes place in a workshop or production facility. Individual fence parts are prepared – posts, infills, panels, or decorative elements. For metal fences, this involves cutting, welding, and surface treatment; for timber, it means processing and impregnation of the material.
Quality-manufactured components are essential for smooth assembly and lower costs in later stages.
Gate and pedestrian gate preparation
Part of the manufacturing process also includes preparing access elements. Gates and pedestrian gates must fit the property dimensions precisely and meet security requirements.
For more complex projects, these may also include:
- sliding gates with automatic operators
- double-leaf gates for wider entrances
- designer pedestrian gates with security features
These elements significantly influence the overall cost of gate installation, so it’s important to design them correctly from the outset.
Quality control before installation
Before the actual installation, all components undergo inspection. This verifies the accuracy of dimensions, the quality of the surface finish, and the functionality of moving parts.
According to expert recommendations from EU construction associations, thorough pre-installation inspection significantly reduces the risk of complaints by tens of percentage points. In practice, this means fewer repairs, lower costs, and higher customer satisfaction.
A well-prepared bespoke fence represents an investment that translates into the quality of the entire installation and long-term reliability.
What is the step-by-step process for fence installation?
The correct fence installation process determines whether the fencing will be stable, level, and functional long-term. Even high-quality material cannot compensate for errors in execution. Therefore, it’s worth adhering to a proven technological procedure used by professional installation companies.
1. Site preparation and boundary marking
Initially, you must precisely define the fence line. Using a string line or measuring equipment, you mark the fence’s alignment and any height differences. This step is crucial – an error here will carry through the entire construction.
Simultaneously, obstacles are removed, the surface is prepared, and the terrain is made ready for subsequent work. For uneven ground, basic levelling may also be necessary.
2. Groundworks and posthole excavation
Next are the excavation works, during which postholes are prepared. Their depth depends on the type of fence and subsoil, but most commonly ranges between 60 to 80 cm.
It’s important to maintain consistent spacing between posts. These are usually adjusted to the width of the panels or the tension of the mesh.
3. Setting posts in concrete
The posts are then set into the prepared holes and concreted in. This step is critical for the stability of the entire structure.
When setting posts, pay attention to:
- precise vertical alignment (checked with a spirit level)
- correct height according to the string line
- sufficient compaction of the concrete
If the quality of the foundations is underestimated, the fence may tilt or loosen over time.
4. Installation of panels, mesh, or infills
After the concrete has cured, the actual infill installation follows. Depending on the fence type, this involves fixing panels, tensioning mesh, or assembling timber or metal sections. For some solutions, fence frame installation also takes place, ensuring structural strength and precise infill attachment.
Precision is key at this stage. Individual components must be evenly installed, without height differences or gaps. This is where the quality of the preceding steps becomes apparent.
5. Gate and pedestrian gate installation
The installation of access elements is also part of the process. Gates and pedestrian gates must be precisely balanced to open easily and close securely.
During installation, the following are checked:
- smooth movement
- correct hinge or runner attachment
- stability of supporting posts
For automated systems, electrical installation is also completed.
6. Final adjustments and stability check
Finally, finishing adjustments are made. This includes tightening fixings, tidying the terrain around the fence, and a comprehensive inspection.
Practical experience shows that thorough post-installation inspection significantly reduces the risk of later problems. A high-quality installed fence will thus withstand wind, rain, and everyday use for many years without issue.
What is the cost of fencing installation and manufacturing?
The cost of fencing installation and manufacturing is a key decision factor for any project. In practice, however, don't just look at the price per linear metre. It is important to understand everything that is included and how individual items affect the overall investment.
What construction works are needed for fence installation?
Fence installation is not just about the assembly itself. In practice, it involves a series of activities that together form the complete construction works necessary for a stable and functional result. These steps often significantly affect the final cost and lifespan of the fence.
Groundwork and excavation
The foundation of every installation is groundwork, which prepares the site for the fence. This includes removing the topsoil, levelling the terrain, and excavating postholes.
Key considerations for this step are:
- type of subsoil (clay, rock, loam)
- site access
- precision of excavations according to the design
More challenging conditions can significantly increase the cost of construction work, especially if machinery is required.
Concreting of post foundations
After excavation, concreting the foundations follows, which ensures the stability of the entire structure. Each post must be firmly anchored to withstand wind and mechanical loads.
Correct execution means:
- sufficient foundation depth
- quality concrete
- precise levelling
If this step is neglected, the fence may eventually tilt or loosen.
Sub-base preparation and terrain levelling
For uneven ground, sub-base treatment is also essential. This involves levelling heights or creating stepped solutions to follow the terrain.
This step is important not only from a technical but also a visual perspective. Unevenness can lead to inaccuracies during installation and degrade the overall appearance.
Dismantling of old fencing
If it's a renovation project, the removal of the existing fence is part of the work. Dismantling old fencing includes disassembling the structure, removing posts, potentially breaking out foundations, disposing of materials, and preparing the area for the new solution.
The complexity depends on the fence type. A simple wire mesh fence is removed quicker, while old concrete or masonry fencing can significantly increase both cost and installation time. For such structures, dismantling can constitute a significant portion of the budget.
Connecting to existing structures
In many cases, the fence needs to be connected to existing elements such as walls, the house, or a garage. Such technical connections require precision and experience.
Errors at this stage can lead to:
- formation of cracks
- reduced stability
- problems with operating gates or pedestrian gates
According to construction experts, high-quality execution of details is what determines whether a fence will be functional long-term without faults.
Overall, well-managed preparatory and construction works are the foundation for successful installation. Even if they are often unseen, they have a fundamental impact on the final quality and lifespan of the entire fencing.
How long does fence installation take?
The duration of fence installation depends on several factors. It's not just about the assembly itself, but also site preparation, material delivery, and the scope of construction work. With proper planning, however, you can estimate the timeline quite accurately.
Time required by fence type
Each type of fencing has a different technical complexity and thus a different installation time. Simple solutions can be completed quickly, while more complex projects require more time.
Approximately, this applies:
- wire mesh fencing: approximately 1 – 3 days
- panel fencing: approximately 2 – 5 days
- timber or metal fencing: approximately 3 – 7 days
- concrete fencing: approximately 5 – 10 days
These figures represent standard installation under typical conditions. For larger installations or complex terrain, the installation time may be extended.
Small projects vs. extensive fencing
The scope of the project significantly affects the overall time. Smaller garden or residential fencing can often be completed within a few days. Conversely, extensive property fencing or industrial sites can take several weeks.
Important factors also include:
- length of the fence
- site access
- work organisation
For larger projects, individual phases of implementation often overlap to speed up the process.
Impact of weather and material availability
Installation is significantly affected by weather conditions. Especially for concreting foundations, suitable temperatures are required. Heavy rain, frost, or extreme temperatures can slow down or completely halt work.
Equally important is material availability. For bespoke solutions, delivery can be extended by several days to weeks, especially with specific design or manufacturing requirements.
Planning the installation
To minimise delays, thorough project planning is crucial. In practice, it is recommended to:
- secure surveying and design in advance
- order materials with sufficient lead time
- choose a suitable season
- coordinate all construction works
Experience shows that good planning can shorten the overall installation time by several days. The result is a smooth process, fewer complications, and a higher quality final outcome.
Is planning permission required for fence construction?
When planning fencing, many people wonder whether planning permission or at least a notification is required. The answer depends on several factors, particularly the height of the fence, its location, and the nature of the construction.
Legislation in the UK
In the UK, many fences fall under 'permitted development rights', meaning full planning permission is not always required. However, notification or a 'prior approval' application to the local planning authority may be necessary. It's crucial to check local council guidelines as regulations can vary.
This generally applies if:
- the fence does not exceed a certain height (e.g., 2 metres)
- it is not located on or adjacent to a highway used by vehicles
- it does not enclose land next to a listed building
Even with simplified administration, it is still important to comply with all legal requirements.
When is planning notification required?
Notification is typically required for standard installations, such as residential or garden fencing. The local authority primarily assesses:
- fence placement on the property boundary
- height and construction type
- compliance with local planning policies
In some cases, a simple drawing or neighbour’s consent may also be required.
Fence height and location
An important factor is the height of the fencing. Standard fences up to approximately 2 metres in height typically do not pose an issue. However, taller structures may be subject to stricter assessment.
Location is equally important:
- a fence on the property boundary may require agreement with the neighbour
- a fence facing a public road must comply with local regulations
- some areas have specific restrictions (e.g., conservation areas)
Property boundaries and neighbourly relations
One of the most common mistakes is incorrectly defining the property boundary. Therefore, it is advisable to conduct a precise land survey before installation.
Good neighbourly relations play a significant role. Even if the law does not always require written consent, in practice, it is recommended to communicate planned work in advance. This avoids disputes and unnecessary complications.
According to experts in planning law, insufficient communication with neighbours is one of the most common causes of problems during fence installation.
Properly managed administration will save you time and money and ensure that your fencing is not only functional but also compliant with applicable regulations.
How to care for a fence and extend its lifespan?
Proper fencing maintenance determines how long your fence will last without repairs. Even quality installation eventually succumbs to the effects of weather, moisture, or mechanical stress. However, with regular care, you can significantly extend its lifespan and functionality.
Timber fence maintenance
Timber fencing is aesthetically appealing, but it requires the most care. Wood is sensitive to moisture, UV radiation, and pests.
Essential maintenance includes:
- regular application of protective coatings (every 2 – 4 years)
- inspection for damaged or infested sections
- protection from direct contact with the ground
If maintenance is neglected, the timber will begin to crack, rot, and lose strength.
Corrosion protection for metal fencing
Metal fences are known for their durability, but they also require basic care. The greatest risk is corrosion, which occurs when the protective layer is damaged.
It is recommended to:
- regularly inspect the surface finish
- repair damaged areas with a coating
- clean away dirt and moisture
Modern surface treatments, such as galvanising or powder coating, can significantly extend the lifespan.
Cleaning concrete fencing
Concrete fencing is one of the least demanding solutions in terms of maintenance. Nevertheless, it requires occasional care, mainly from an aesthetic perspective.
Most commonly, this involves:
- removing moss and dirt
- cleaning with a high-pressure washer
- inspecting for any cracks
With proper care, concrete will retain its appearance and strength for many years.
Regular stability checks
Regardless of the fence type, it is important to perform regular inspections. Focus especially on:
- post stability
- joint strength
- gate and pedestrian gate functionality
Minor problems should be addressed immediately. Early repair is always cheaper than a complete reconstruction.
Based on practical experience, regular maintenance can extend the lifespan of fencing by several years. This is a simple step that significantly reduces future costs and ensures that the fence will fulfil its function long-term.
What are the most common errors in fence installation?
While fence installation might seem straightforward, errors often occur in practice that significantly affect the stability, lifespan, and appearance of the fencing. Many of these arise during the preparation phase or due to underestimating details during execution.
Incorrect property survey
One of the most common mistakes is an inaccurate survey of property boundaries. If the fence is not installed correctly, it can result in encroachment onto adjacent land or problems with neighbours.
Therefore, it is recommended to:
- utilise a professional land survey
- verify land registry data
- consult with neighbours on placement
This error often requires rectification, leading to unnecessary costs and complications.
Inadequate post foundations
Another common problem is weak or shallow foundations. Posts without proper anchoring cannot withstand wind or normal loads.
Consequences include:
- tilting of the fence
- loosening of the structure
- cracking of concrete
Correct depth and quality concreting are therefore fundamental to any installation.
Incorrect panel or mesh installation
During the actual installation, errors often occur in the placement of infills. Unevenness, incorrect tensioning, or imprecise fastening reduce the strength and aesthetics of the fence.
Typical problems:
- wavy mesh
- imprecise panel connections
- height differences between sections
These errors may not be immediately visible but will manifest over time.
Underestimation of drainage
Few consider drainage for fencing, yet it is an important detail. Water can undermine foundations and gradually compromise post stability.
Risks include:
- soil erosion
- weakening of concrete foundations
- fence deformation
For problematic sites, it is advisable to also consider basic drainage.
Selection of unsuitable material
A common mistake is selecting the wrong material. The fence must be appropriate for the conditions in which it will be used.
For example:
- untreated timber degrades quickly
- cheap metal components corrode
- an unsuitable fence type will not provide the desired privacy
According to experts, incorrect selection is one of the most common reasons for dissatisfaction with the outcome.
Avoiding these mistakes means investing in quality preparation and execution. Properly performed installation is the foundation that ensures your fencing will be strong, functional, and problem-free for many years.
What tips and advice will help you save money on fence installation?
Fencing installation can be financially demanding, but there are several ways to optimise costs without compromising quality. The key is proper planning, material selection, and efficient execution.
Comparing material and labour costs
One of the biggest mistakes is making decisions without comparing quotes. Price differences can be significant, not only for materials but also for labour.
It is recommended to:
- contact multiple suppliers
- compare the scope of services, not just the price
- focus on value for money
This way, you can gain a better understanding of what the construction work price list includes and where savings can be made.
Choosing the right fence type according to budget
Not every project requires the most expensive solution. It's important to choose a fence that matches both the purpose and the budget.
- for large properties, simpler fencing is suitable
- for residential homes, it's worth investing in quality
- a combination of materials can reduce overall costs
The right choice will help you optimise the cost of garden fencing without unnecessary expenses.
Planning the project in advance
One of the most effective ways to save money is thorough planning. An unprepared project often leads to delays, changes, and additional costs.
Focus especially on:
- precise site surveying
- material selection in advance
- scheduling the installation
Good planning eliminates errors and reduces the risk of unexpected expenses.
Professional firm vs. DIY installation
Many consider whether to install a fence themselves or hire professionals. DIY installation can reduce labour costs, but it also carries risks.
Professional installation offers:
- faster work progression
- higher quality execution
- lower risk of errors
Ultimately, professional installation can be more cost-effective, especially for more complex projects.
Optimising fence length and complexity
A simple, straight fence is always cheaper than a complex solution. Every corner, height difference, or atypical element increases the installation difficulty.
If you want to save:
- minimise unnecessary segmentation
- simplify the fence route
- adapt the design to the terrain
According to practical experience, simple solutions offer the best balance between cost and outcome.
How to choose the ideal fencing for your property?
Choosing the right fencing is a decision that will affect your property for many years. A well-designed fence not only fulfils the basic function of defining space but also provides property security, privacy, and overall visual appeal. Therefore, it is worth paying sufficient attention to the selection and not underestimating even the smallest details.
Advantages of quality fencing
A well-executed fence offers several important benefits. Firstly, it provides security, protecting your home and property from unwanted entry. Equally important is privacy, especially in densely built-up areas.
Beyond practical functions, a fence also plays an aesthetic role. A suitably chosen design can significantly increase the property value and complete the overall exterior character. Furthermore, quality materials ensure that the fence retains its appearance even after years of use.
Combining quality and cost as the basis for decision-making
When choosing fencing, it's not wise to be guided solely by the lowest price. While cheap solutions may reduce initial costs, they often lead to higher expenses for repairs or replacement.
The ideal approach is to seek a balanced ratio between cost and quality. This means choosing materials and solutions that meet your needs, while also offering sufficient durability and resistance. This way, you avoid compromises that would cost you more in the future.
Importance of professional installation
Even the highest quality material cannot compensate for installation errors. Professional installation is therefore crucial for the proper functioning of fencing.
A specialist firm will ensure:
- accurate surveying and setting
- quality foundations and stability
- correct assembly of all components
Thanks to this, you gain assurance that the fence will be strong, secure, and problem-free even with long-term use.
A fence as a long-term investment
Fencing should be viewed as a long-term investment, not just a quick fix. A quality installed fence will last decades and retain its functionality and appearance throughout its lifespan.
Investing in better materials and professional installation will repay you in the form of:
- lower maintenance costs
- reduced risk of repairs
- higher property value
That's why it's worth thinking ahead and choosing a solution that will perform well years down the line.
Calculate your fencing cost without unnecessary errors
Do you want to know clearly how much fencing installation and manufacturing will cost for your specific property?
Use the Numiq construction calculator to get an indicative tailored budget based on fence type, length, and installation complexity.
Gain clarity on the cost before starting the project and make decisions based on real data, not estimates.
Frequently asked questions
The cost per linear metre of fencing mainly depends on the chosen material, installation complexity, and site conditions . Simple solutions, such as wire mesh fences, are among the cheapest, while solid or designer fences can be significantly more expensive. The final cost always combines material and labour . Accessories like gates or groundworks are also added. In practice, the price therefore ranges from approximately 10 € to 150 € per linear metre , with the exact sum depending on the specific project.
Wire mesh fencing is considered the cheapest solution, being quick to install and requiring minimal material. It is primarily used for fencing larger properties or where privacy is not a priority. However, it must be noted that this is a simpler solution . It does not provide the same strength or visual appeal as other fence types and is therefore often supplemented with screening elements or planting.
Proper post anchoring is fundamental for the strength and stability of fencing . In most cases, posts are set to a depth of approximately 60 to 80 cm , but the specific value depends on the soil type and fence height. If the subsoil is unstable or the fence is taller, greater depth is recommended. Insufficient anchoring can gradually lead to tilting or loosening of the structure .
The lifespan of a fence depends on the material, quality of installation, and maintenance . It typically ranges from 10 to 30 years , with some solutions lasting even longer. Simpler fences have a shorter lifespan, while quality metal or concrete structures last significantly longer. Regular maintenance also has a great impact, which can extend the lifespan by several years.
Fence installation is possible in winter, but it depends on specific conditions. The biggest limitation is concreting foundations , which requires suitable temperatures. In a mild winter, installation can be managed without major problems. However, in freezing conditions, work may slow down or the quality of the concrete may be reduced. Therefore, most installations are planned for periods when stable climatic conditions prevail and work proceeds without complications.