Price list 2026 · Europe

Installation of Fence Posts up to 2.4 m Height

Installing a fence post up to 2.4 m means digging a hole, setting the post plumb and concreting it in. The guide price is €25.00 per piece, mainly affected by ground conditions, slope and access to the site.

Updated 09/2026·11 min read·22 price list items
Standard labour price
€25.00/ pcs
Indicative range
€20.00 - €32.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of Fence Posts up to 2.4 m Height

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing22 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Fencing cost

Install fence post up to 2.4 mpcs€25.00 / pcspcsenter quantity-
Laying concrete fence blockspcs€4.00 / pcspcsenter quantity-
Building fence pierslm€22.00 / lmlmenter quantity-
Install concrete fencing up to 1.8 mlm€20.00 / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm€23.00 / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm€24.00 / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm€8.80 / lmlmenter quantity-
Install fence post up to 2.7 mpcs€28.00 / pcspcsenter quantity-
Install fence post up to 3.8 mpcs€35.00 / pcspcsenter quantity-
Install fence strut up to 2.7 mpcs€1.70 / pcspcsenter quantity-
Install barbed wire extension armpcs€1.40 / pcspcsenter quantity-
Tension straining wirelm€0.50 / lmlmenter quantity-
Tension barbed wirelm€0.75 / lmlmenter quantity-
Install fence framepcspcs-
Install bespoke fence framepcspcs-
Install fence panelspcspcs-
Install mesh fencing up to 1.4 mlm€2.50 / lmlmenter quantity-
Install mesh fencing up to 1.8 mlm€2.70 / lmlmenter quantity-
Install mesh fencing over 3.0 mlm€3.70 / lmlmenter quantity-
Blockwork corner bondingpcs€1.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What fence post installation is and when it is needed

A post set in concrete carries the fence infill, resists wind and stays put after winter. This work is part of every new fence, every gate or side gate, and every job where an old post is leaning and needs replacing. Its quality decides whether the fence will still be straight in ten years. For a wider view of how posts fit into the whole job, see the overview of fencing work.

Posts up to 2.4 m are standard for a typical domestic fence made of mesh, panels or timber. This is the most common option. For taller fences, for example 2.7 m or 3.8 m, the method is the same, but a taller post acts as a longer lever. Wind pushes on a larger area and all of that force goes into the footing, so the hole depth, the amount of concrete and the need for accuracy all increase. For the tallest fences, the footing size and post section should be specified by the system manufacturer or a designer.

The hole for a post up to 2.4 m is usually 60 to 80 cm deep. However, 60 cm is only the minimum for a light mesh fence in firm ground. It is safer to go below the depth to which the ground freezes in the area, which is deeper in exposed and upland locations. Otherwise frost can gradually lift the post.

Before placing an order, check whether the height in the quote means the full length of the post or only the part above ground. Part of the post ends up in concrete. If the fence is to stand, for example, 1.8 m above ground, the post will be longer by the depth of the concrete footing.

What to decide before digging

Before the fencer arrives, the following should be clear:

  • Exactly where the boundary runs. If in doubt, have the boundary set out by a surveyor. A post concreted a few centimetres onto the neighbour's land cannot simply be moved.
  • What the infill will be. With panels, the post spacing must match the panel size exactly, so it is sensible to choose the panels and confirm their dimensions before any digging starts. With mesh the spacing is more flexible, but corner, end and straining posts take the tension of the mesh and need diagonal struts or a heavier section.
  • Where the gate and side gate will be. Gate posts carry the weight of the leaf and take leverage every time it opens. They are usually stronger and set in a larger footing than a standard post. The gate width and opening direction also need to be known.
  • Height above ground and how the fence follows a slope. On a slope, the fence can follow the ground or be stepped. This decides the height of each post.
  • Whether there will be a gravel board or a dwarf wall under the fence. This affects the post type, the brackets and the setting height.
  • Who supplies the materials. Posts, concrete, gravel and struts can be brought by the fencer or bought by the customer. The quote should state this clearly.

A taller fence or a fence on the boundary may need planning permission. Some minor alterations to houses are classed as permitted development and do not need planning permission. However, these rights only apply to houses, not flats, and they can be removed in certain areas by Article 4 Directions. Do not assume it is automatically allowed. Check the Planning Portal or ask the local planning authority in advance.

Before digging, find out whether any underground services run through the area. The utility companies can provide records of their cables and pipes. If services run close to the fence line, digging near them is done by hand and under the conditions set by the owner of the service. If a gas pipe is hit during digging or gas can be smelt, stop work immediately, move away and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Leave a damaged electrical cable to a qualified electrician and do not touch it.

How the installation is carried out

  1. Setting out: the fence line is marked with a tight string line and pegs, and the spacing and ground level differences are measured.
  2. Digging: the hole is dug by hand, with an auger or with a machine. It is usually about 20 to 30 cm wide, and the depth is chosen according to the ground and frost depth.
  3. Gravel base: a layer of gravel is placed in the bottom and compacted to drain water away.
  4. Standing the post: the post is plumbed with a spirit level on two adjacent faces and held in place with struts.
  5. Concreting: concrete is placed in layers, and each layer is rodded or compacted so that no voids remain.
  6. Checking: plumb and height against the string line are checked once more before the concrete begins to set.
  7. Finishing the top: the concrete surface is shaped to a slight fall away from the post so that water runs off.
  8. Curing: the concrete is left to cure, and only then is the infill fitted.

On a longer fence, the end and corner posts are usually set first. A line is stretched between their tops and the remaining posts are set to it, so that all of them are in one line and at one height.

Why does spacing matter so much? With panel fences, the distance between posts must match the panel size exactly, otherwise the panel will not fit. With mesh, a spacing of about 2 to 2.5 m is common. The taller the fence and the heavier or more solid the infill, the closer the posts should be.

Posts and concrete: what to choose

Steel posts are the most widely used. They are light, quick to install and, when hot-dip galvanised or powder coated, resist corrosion well. They suit both mesh and panels, and taller fences need a heavier section.

Precast concrete posts are solid and durable, but heavy to handle. They are mainly used for concrete and combined fences, such as concrete fencing up to 1.8 m or a concrete panel fence up to 2.1 m high.

Timber posts are better suited to lower garden fences. Timber should not stand directly in concrete or soil. It is better to set it in a metal post shoe, otherwise it rots at ground level over time.

For posts up to 2.4 m, concrete of strength class C16/20 is usually used, and C20/25 for taller fences. For a few posts, bagged dry post mix is enough, and for a larger number a mixer or ready-mixed concrete is worth it. Follow the manufacturer's water ratio, as concrete that is too wet is weaker.

What affects the price

The guide price for the labour is €25.00 per piece. It applies to a standard post in loose soil on level ground with good access. The price per post rises mainly because of the following:

  • Ground conditions: stony or rocky ground that has to be broken out or drilled by machine is one of the biggest cost factors. One hole can take several times longer than in ordinary soil.
  • Soil type: clay, waterlogged or made-up ground calls for a deeper and wider footing, which means more digging and more concrete.
  • Slope: each post has a different height and has to be set out individually. A gentle slope adds a little time, a steep slope and a stepped fence add considerably more.
  • Obstructions in the ground: tree roots, old foundations and remains of the previous fence have to be removed first. Breaking out an old post with its concrete is often charged separately as old fencing removal.
  • Access: if concrete has to be wheelbarrowed a long way or a machine cannot reach the fence line, there is more manual work.
  • Post type: corner, end and straining posts with struts and gate posts take more work than an intermediate post. Heavy concrete posts need more people.
  • Materials and spoil removal: check whether the price per post includes concrete, gravel and removal of excavated soil, or only the labour. If soil or old concrete is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • Number of posts: with many posts in one line the work becomes more efficient, while for one or two posts the call-out and preparation make up a larger part of the price.

What makes the work easier and what slows it down

The work goes faster when:

  • the boundary is clear and the neighbour knows about the new fence,
  • the information on underground services has been obtained before the fencer arrives,
  • the posts, panels or mesh are on site and the panel dimensions have been checked,
  • the fence line is cleared, mown and free of stored materials,
  • water is available for mixing concrete, and a power supply for the mixer if needed,
  • it has been agreed where the excavated soil will be stockpiled or taken away.

Weather can slow down or interrupt the work. Concreting in frost or heavy rain is postponed, so in autumn and winter allow some slack in the schedule. Delays also occur when it turns out during digging that materials are missing or a panel is a different size than expected.

Typical mistakes and how they show up later

Hole too shallow. Frost lifts the post and after the first winter it starts to lean. Gradually the mesh bends and the panels twist in their brackets.

Plumb checked on one face only. The post is straight from the front but leans when seen from the side. Looking along the fence it is obvious at once, and it can only be fixed by resetting the post.

No struts. The post moves while the concrete is setting and can no longer be corrected.

Wet or poorly compacted concrete with voids. It cracks over time, water reaches the post and the post corrodes in the footing or works loose.

Concrete finished as a dish around the post. Water collects, freezes and damages the footing.

Inaccurate spacing for panels. The last panel does not fit, so it has to be cut down or the post reset.

Fitting panels or tensioning mesh the very next day. The concrete has not yet gained strength, the posts are pulled out of plumb and the fence stays crooked for good.

Concreting in frost or heavy rain. The concrete cures badly, is weaker and crumbles.

Timber post set directly in soil or concrete. It rots at ground level and breaks after a few years.

DIY guide: installing a fence post up to 2.4 m

Lower posts on an ordinary plot can be handled by a capable DIYer with a helper and without rushing. Taller posts are better left to a contractor, as they are heavy and there is a risk of them toppling if something goes wrong. Method:

  1. Check with the local planning authority whether the fence needs permission, and find out where underground services run.
  2. Stretch a line between the end posts and mark the positions of the others.
  3. Dig a hole about 20 to 30 cm wide, to the depth recommended at the start of this article, and no shallower than 60 cm for a light fence.
  4. Put about 10 cm of gravel in the bottom and tamp it down.
  5. Stand the post and, with a helper, plumb it with a spirit level on two faces.
  6. Fix two battens as diagonal struts into the ground.
  7. Pour the concrete in layers and rod each one with a bar.
  8. Check plumb and height against the line.
  9. Smooth the top to a fall away from the post.
  10. Wait at least a few days before fitting the infill, preferably a week with standard concrete.

How to check the finished work

At handover, take a spirit level and go round every post. Check in particular:

  • Every post is plumb when checked with a spirit level on two faces.
  • The post tops are in one line and at the planned height, and none stands out when looking along the fence.
  • The spacing suits the infill, and matches the panel size exactly for panels.
  • The post does not move when pushed by hand and the concrete around it has not cracked.
  • The top of the footing falls away from the post and no water stands around it.
  • Corner, end and gate posts have struts or a heavier section as agreed.
  • The coating on steel posts is not scratched or chipped.
  • The area is tidy and surplus soil has been removed as agreed.
  • It is clear when the infill can be fitted.

Frequently asked questions

The guide price is €25.00 per piece. The final price depends mainly on the ground conditions, slope, access, post type and whether the price includes concrete and removal of spoil.

Related work

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.