Building work price list: Old Fencing Removal
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Fencing cost | ||||
| Remove old fencing | lm | €8.80 / lm | lm | enter quantity- |
| Laying concrete fence blocks | pcs | €4.00 / pcs | pcs | enter quantity- |
| Building fence piers | lm | €22.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 1.8 m | lm | €20.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.1 m | lm | €23.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.4 m | lm | €24.00 / lm | lm | enter quantity- |
| Fencing with DT 12/15 blocks | m² | m² | - | |
| Fencing with DT 20/25 blocks | m² | m² | - | |
| Install fence post up to 2.4 m | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install fence post up to 2.7 m | pcs | €28.00 / pcs | pcs | enter quantity- |
| Install fence post up to 3.8 m | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install fence strut up to 2.7 m | pcs | €1.70 / pcs | pcs | enter quantity- |
| Install barbed wire extension arm | pcs | €1.40 / pcs | pcs | enter quantity- |
| Tension straining wire | lm | €0.50 / lm | lm | enter quantity- |
| Tension barbed wire | lm | €0.75 / lm | lm | enter quantity- |
| Install fence frame | pcs | pcs | - | |
| Install bespoke fence frame | pcs | pcs | - | |
| Install fence panels | pcs | pcs | - | |
| Install mesh fencing up to 1.4 m | lm | €2.50 / lm | lm | enter quantity- |
| Install mesh fencing up to 1.8 m | lm | €2.70 / lm | lm | enter quantity- |
| Install mesh fencing over 3.0 m | lm | €3.70 / lm | lm | enter quantity- |
| Blockwork corner bonding | pcs | €1.00 / pcs | pcs | enter quantity- |
What fence removal includes and when it is needed
The fence is dismantled, the posts are pulled out or broken out and, if agreed, the concrete footings or dwarf wall are removed too. The ground is then ready for a new fence. Homeowners usually order the work when a fence is rusted, rotten or leaning. Other reasons include a change of material or appearance, or changes to the boundary, a driveway entrance or a gate. The work is part of the wider fencing trade, and removal is often the first step before a new fence goes up.
Not every old fence has to come down completely. Sometimes replacing the infill and keeping the posts is enough. In other cases it makes more sense to go right down to the foundations.
- Replacing the infill is enough: the posts are straight, do not move, are not rusted through at ground level and the footings are intact. The mesh, boards or panels are replaced, and the posts are cleaned and painted.
- The fence and posts must go: the posts lean, are rusted through or rotten at ground level, the fence sways in the wind or the new fence needs a different post spacing.
- Remove down to the foundations: the dwarf wall is cracked, leaning or breaking up from frost, or the new fence will follow a different line or be taller and heavier.
What to decide before ordering
Before ordering, clarify a few points that affect both the method and the price:
- what length of fence is being removed and whether gates are included,
- whether anything should be kept, such as panels, a gate or posts,
- who removes the waste and where it goes,
- whether the property will be open during and after the work and how it will be secured temporarily, for example because of a dog or children.
The most important decision concerns the footings and dwarf wall: whether they stay in the ground, are broken out below ground level or are removed entirely. Leftover concrete gets in the way when digging holes for new posts. On a well-built fence, the footings reach a depth protected from frost. Older fences often have shallower footings. If the type of new fence and the position of its posts are already known, tell the tradesperson removing the old one. This decides which footings must come out completely and which only need breaking down.
Boundary, permission and underground services
Boundary and neighbours
Check who owns the fence. If it stands on the boundary or is shared, agree with the neighbour in writing before work starts. If the exact boundary is unclear, it is worth calling a land surveyor to mark it out. The old fence is often the only visible sign of the boundary. Once it is gone, a new fence is easily put up by guesswork, and years later it turns out to stand on the neighbour's land or the other way round.
Permission
Whether removing a fence needs any consent depends on the particular fence and its location. Before starting, check with the local planning authority, especially for a wall along a road, a boundary wall, a listed building or a property in a conservation area.
Underground services
Electricity cables, gas supply pipes, water pipes and drains often run alongside fences. Before breaking out foundations, have the services located using the utility companies' records and a cable detection survey. Near a located route, digging is done by hand only. The utility company will state the exact distance within which machinery must not be used. If warning tape, a cable or a pipe appears under the spade, work stops. If an electricity cable is struck, do not touch it and contact the electricity network operator. If gas can be smelt, leave the area, do not use naked flames or electric tools, and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
Electrics in the fence
If the fence or gate piers carry lighting, a doorbell, a gate motor or a meter box, disconnecting and rerouting them is a job for a qualified electrician. A new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts. Demolition starts only once the circuits are safely disconnected.
Asbestos
Some older fences have infill made of asbestos cement sheets. Do not cut, break or throw them out with ordinary rubble. Breaking them releases harmful dust. Removal and disposal must be carried out by a contractor qualified for asbestos work, not an ordinary demolition gang. On older properties, have suspect materials tested before cutting or breaking anything. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
How fence removal works step by step
The work has a clear order and it pays to follow it. The fence is dismantled from the lightest parts to the heaviest. That way nothing collapses unexpectedly and reusable material stays intact.
- Site visit. The tradesperson checks what the fence is made of, how the posts are fixed, whether there is a dwarf wall and how machinery can reach it.
- Locating services and disconnecting electrics. The service routes are marked on the ground and an electrician disconnects any lighting or gate motor.
- Preparing the area. Planters, furniture and climbing plants are removed, paths and lawn are protected, and the area is cordoned off if the fence borders a street.
- Gates. The gate leaves are lifted off their hinges before the rest of the fence so they do not fall when the posts are loosened.
- Infill. Mesh, line wires, boards or metal panels come down first.
- Posts and rails. Posts are pulled out with their footing or cut off at ground level, as agreed.
- Foundations and dwarf wall. The concrete is broken out by hand, with a breaker or with a mini digger.
- Backfilling and levelling. The footing holes are backfilled with soil, compacted and the ground is roughly levelled.
- Sorting and removal. Metal, timber and concrete are kept separate and prepared for collection.
Mesh, timber, metal and concrete: the differences
Chain link and mesh fencing
This is the simplest case. The line wires are released first, then the mesh is rolled up. The harder part is the posts, which are often set in concrete. Tensioned wire can whip back when cut, so the tensioner is loosened first and the wire is cut wearing gloves and safety glasses.
Timber fencing
An old timber fence comes apart easily because the joints are often rotten. For the same reason, boards break and a lot of the timber ends up as waste. Painted or treated timber should not go on a garden bonfire, as burning it gives off harmful substances and the smoke bothers the neighbours. Timber posts set directly in the ground often rot just below the surface and snap when pulled. The lower stump then has to be dug out separately.
Metal fencing and panels
Bolted panels can be dismantled and sometimes reused. Welded structures and seized bolts have to be cut with an angle grinder, which takes longer and needs care with sparks. Sparks must not reach dry grass, timber parts or the neighbour's car or windows.
Concrete fencing, low walls and combined fences
Concrete is the most work. Precast panels can be slid out of the posts, but dwarf walls, low walls and footings have to be broken out. On combined fences, for example a concrete base with metal infill, each material is removed separately. A brick or concrete wall may also be retaining soil if the garden is higher than the pavement or the neighbour's garden. Once it is removed, the soil can slip, especially after rain, so a specialist should decide how to proceed.
What affects the price of fence removal
The guide price for labour is €8.80 per running metre. This covers a typical case. The final figure can vary considerably depending on what the fence consists of and what work is required.
As a guide to the workload: a two-person team can take down a mesh fence with light footings at a rate of tens of metres a day. With a continuous dwarf wall or a concrete low wall, daily progress is more likely to be a few metres.
- Fence type: mesh on thin posts is the cheapest case. Timber and bolted metal fences usually cost a little more, and welded structures more again because of the cutting.
- Amount of concrete in the ground: this has the greatest effect on price. Large footings, a continuous dwarf wall or a low wall can make the job several times more expensive than mesh alone.
- Extent of foundation removal: cutting posts off at ground level is quickest, breaking footings out below ground level takes more effort, and removing whole footings and backfilling the holes takes the most.
- Height and weight of the fence: a tall fence or heavy panels need more people, a ladder or scaffolding and a more careful approach.
- Access: if a mini digger can get right up to the fence, demolition is quick. A slope, a narrow side passage or carrying rubble by hand through the garden adds a lot of time.
- Services along the fence: where a cable or pipe runs, digging must be done slowly by hand and machinery cannot be used.
- Condition of the fence: seized bolts, an overgrown fence and shrubs or roots grown through the mesh add hours of work.
- Careful dismantling: if panels are to stay intact for reuse, the work is slower than standard removal.
- Waste removal: a skip or rubble collection and landfill charges are usually a separate item. With concrete fences they form a large part of the cost, and a distant recycling centre or tip also pushes the price up.
- Length of the run: on a short run, the fixed costs of transport and machinery are spread over fewer metres, so the price per metre tends to be higher than on a long fence where the machinery is brought in only once.
When comparing quotes, check whether they include breaking out footings, backfilling holes, waste removal and tipping charges. Two quotes with the same price per metre can cover completely different work.
How to prepare so the work goes quickly
A lot of time can be saved before the tradespeople arrive. The work is easier when:
- services are located and electrics in the fence are disconnected before demolition day, so the team does not have to wait,
- plants, planters, timber and items leaning against the fence are cleared from both sides,
- access from the neighbour's side is agreed and the neighbour knows when work will take place,
- there is space for a skip and a route for the mini digger, with no cars parked in the entrance,
- parts to be kept, such as a gate, a post or panels for reuse, are clearly marked,
- it is clearly agreed where retained material will be stored and which footings come out completely,
- water and a power supply for tools are available if the tradesperson needs them.
The work takes longer if the scope changes during demolition, if the team has to wait for services to be located or if the neighbour raises concerns only on the day.
Common mistakes and how they show up later
Footings left in the ground without agreement
When digging holes for the new fence, old concrete turns up exactly where a new post should go. The new fence then has to be shifted, or the concrete broken out afterwards when the machinery has already left.
Demolition without locating services
A damaged cable or supply pipe means an expensive repair and often a loss of supply for neighbours.
Holes not backfilled or not compacted
The soil settles over time, hollows appear in the lawn that people trip over, and the mower gets damaged.
Bits of wire and nails in the grass
They show up at the first mow or when children and dogs play. Wire wraps around the mower blade.
DIY guide: removing a mesh or timber fence
A light fence with small footings can be removed without a contractor. Leave heavy concrete walls, fences next to a road, asbestos cement infill, fences with lighting or a gate motor and anything with possible underground services to professionals.
- Agree with the neighbour, check with the local planning authority whether any consent is needed and have the services located.
- Get gloves, safety glasses, sturdy boots, wire cutters, a crowbar, a saw and a spade.
- Remove plants and objects that are in the way.
- Loosen the tensioners, cut the tie wire, release the line wires and roll up the mesh gradually.
- On a timber fence, unscrew or prise off the boards and pull out the nails.
- Dig the soil away around each post down to the footing, by hand and carefully near located services.
- Rock the post loose and pull it out with its footing, or break the footing up with a sledgehammer.
- Backfill the holes with soil in layers and compact each layer.
- Walk the whole area and collect leftover wire, nails and fragments.
- Sort metal, timber and concrete and take them to a household waste recycling centre or a scrap metal dealer.
Waste and preparing the ground for a new fence
Metal parts can go to a scrap metal dealer, concrete counts as construction rubble, and timber goes either to recycling or for reuse depending on its condition. Local councils have their own rules for small amounts of construction waste, so check with the council or the recycling centre. Before handing over rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
If a new fence is to follow straight away, it pays to plan the order of work so that the demolition machinery can also dig the holes or trench for the new foundations. This saves one delivery of machinery, and the ground does not have to be dug up and levelled twice. This applies, for example, to the installation of concrete fencing up to 1.8 m, a concrete panel fence up to 2.1 m high or a taller concrete panel fence up to 2.4 m, where the post positions should be known before the old footings are removed.
How to check the finished work
When signing off the work, walk the whole fence line and check:
- that all infill, posts and rails are removed along the agreed section,
- that footings are removed to the agreed depth or cut off flush with the ground,
- that no sharp edges stick out of cut posts that could cause trips or injuries,
- that holes are backfilled, compacted and the ground roughly levelled,
- that no pieces of wire, nails or sharp bits of metal are left in the ground,
- that paths, kerbs, lawn and the neighbour's property are undamaged,
- that located services and their markings are intact,
- that boundary markers are still in place if a surveyor set them,
- that waste has been removed and reusable material is stored where agreed.
Frequently asked questions
The guide price is €8.80 per running metre. The final amount depends mostly on the amount of concrete in the ground, whether footings are removed completely, access to the fence and how the waste is removed.
Not always. If the new fence will follow a different line or the area will become lawn, breaking the footing out below ground level is often enough. If new posts will go in the same positions, it is better to remove the footings completely.
A short mesh or timber fence is usually removed in a few hours to a day. Metal and combined fences take longer, and a concrete low wall can take several days. Sorting and removing the waste also has to be included in the time.
Bolted metal panels, straight posts and sound timber can. Tell the tradesperson in advance so they dismantle these parts carefully instead of cutting them.
It depends on the fence and its location. Always check with the local planning authority, particularly for boundary walls, listed buildings and conservation areas, and for a shared fence get the neighbour's written agreement.
Infill and metal parts, yes. In frost, however, breaking out footings and digging frozen ground is slower and backfilled holes cannot be compacted properly. A spring thaw or a wet autumn brings a different problem: the ground is waterlogged, machinery sinks in and damages the lawn. Work on foundations is therefore usually done in dry weather outside frosty periods.
Related work
How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.
How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.
How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.
How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.
How a fence of DT 20 and DT 25 formwork blocks is built, which block width to choose, what foundations it needs and what to check at handover.
How a fence post up to 2.4 m is set in concrete, how deep the hole should be, which post to choose and how to check the finished work.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.