Building work price list: Construction of DT 20, 25 Formwork Block Fencing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Fencing cost | ||||
| Fencing with DT 20/25 blocks | m² | €17.00 / m² | m² | enter quantity- |
| Laying concrete fence blocks | pcs | €4.00 / pcs | pcs | enter quantity- |
| Building fence piers | lm | €22.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 1.8 m | lm | €20.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.1 m | lm | €23.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.4 m | lm | €24.00 / lm | lm | enter quantity- |
| Fencing with DT 12/15 blocks | m² | m² | - | |
| Remove old fencing | lm | €8.80 / lm | lm | enter quantity- |
| Install fence post up to 2.4 m | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install fence post up to 2.7 m | pcs | €28.00 / pcs | pcs | enter quantity- |
| Install fence post up to 3.8 m | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install fence strut up to 2.7 m | pcs | €1.70 / pcs | pcs | enter quantity- |
| Install barbed wire extension arm | pcs | €1.40 / pcs | pcs | enter quantity- |
| Tension straining wire | lm | €0.50 / lm | lm | enter quantity- |
| Tension barbed wire | lm | €0.75 / lm | lm | enter quantity- |
| Install fence frame | pcs | pcs | - | |
| Install bespoke fence frame | pcs | pcs | - | |
| Install fence panels | pcs | pcs | - | |
| Install mesh fencing up to 1.4 m | lm | €2.50 / lm | lm | enter quantity- |
| Install mesh fencing up to 1.8 m | lm | €2.70 / lm | lm | enter quantity- |
| Install mesh fencing over 3.0 m | lm | €3.70 / lm | lm | enter quantity- |
| Blockwork corner bonding | pcs | €1.00 / pcs | pcs | enter quantity- |
What a formwork block fence is and when it is the right choice
A formwork block fence (DT blocks, also called hollow shuttering blocks) is not a conventional masonry wall. It is a concrete wall in which hollow concrete blocks act as formwork that stays in place. The blocks are laid in courses, steel reinforcement goes into the cores and the whole wall is filled with concrete. The result is a solid wall that withstands wind, frost and impact.
Within fencing work as a whole, this type of wall is usually built in these situations:
- solid boundary wall to the street: screens the garden from view, traffic noise and road dust,
- plinth wall under metal or timber infill: a lower concrete wall that carries the posts and fence panels,
- low garden wall: separates beds, a patio or a driveway.
This page covers the thicker DT 20 and DT 25 blocks as well as the thinner DT 12 and DT 15. The method is the same for every width. The main differences are the width of the foundation and the amount of reinforcement. The price on this page, however, applies only to DT 20 and DT 25. A wall in DT 12 or DT 15 uses a different amount of concrete and takes a different amount of labour, so this price does not apply to it. If a quicker system suits the site better, compare it with concrete fencing up to 1.8 m.
Decisions to make before building starts
Once the foundation is poured, a concrete wall is hard to change. These points should be settled before anyone starts digging.
DT 12, 15, 20 or 25: choosing the width
The number in the name gives the approximate block width in centimetres. A thicker block holds more concrete and reinforcement, so the wall is stiffer. The blocks are heavier, though, and the foundation has to be wider.
- DT 12: low walls, bed edging and small dividing walls in the garden. Not suitable for a taller solid fence.
- DT 15: low walls, plinths and dwarf walls under lightweight infill, where the wall itself carries little load.
- DT 20: the usual choice for a house boundary, both as a plinth and as a solid wall of medium height on level ground.
- DT 25: taller solid walls, exposed windy sites, sloping plots and walls carrying a heavy gate.
Why does height matter? A solid wall acts like a sail. The taller and longer it is, the more wind pushes against it and the greater the force at the base where it meets the foundation. That is why taller walls get thicker blocks and more reinforcement. If the wall is also to hold back soil, it becomes a retaining wall. That needs a structural engineer, whatever the block width.
Foundation depth and width for a formwork block wall
The foundation must go below the depth affected by frost so that it is not lifted in winter. In the UK a strip foundation for a garden wall is commonly taken to at least 450 mm, and deeper in clay soils, which shrink and swell with the seasons. Clay, waterlogged ground and sites near trees need a deeper foundation. The concrete strip is wider than the block itself, so it is wider under DT 25 than under DT 20. For a taller wall, on a slope or on uncertain ground, it pays to have a structural engineer design the foundation.
Solid wall or plinth
Decide whether the whole wall will be in blocks or only the lower part with infill above. This determines the number of courses, the post positions and the reinforcement. For a plinth, the type of infill, the anchor positions and their exact placement must be known in advance. Drilling into reinforced concrete afterwards is laborious and can damage the reinforcement.
Gates, pedestrian gates and recesses
The position and width of the gate, pedestrian gate and any recess for a letterbox, doorbell or meter box must be fixed before digging. At a gate the wall and foundation are strengthened, because the post carries the weight of the leaf and the impact of closing. For a sliding gate, allow for a foundation under the track or the counterbalance section. Any cabling to a meter box or gate motor must be done only by a qualified electrician. In England and Wales a new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts. The builder simply leaves the space and ducting in the wall as the electrician instructs.
Surface finish
Standard smooth blocks are usually rendered or clad. Some manufacturers also make blocks with a fair-faced finish, for example split-face, which need no render. These must be laid very neatly, as every mistake stays visible. If cladding such as natural stone is planned, its thickness must be allowed for when setting out, so the wall does not cross the boundary.
Permission and the boundary line
Whether a wall needs planning permission depends mainly on its height, whether it is next to a road and on any local restrictions, for example in a conservation area or on a listed property. Height limits next to a road are stricter than elsewhere on the boundary. Do not assume no permission is needed. Permitted development rights only apply to houses and can be removed in certain areas by Article 4 Directions, so check the Planning Portal or ask the local planning authority before starting.
The wall must stand on your land, or on the boundary with your neighbour's agreement. If the boundary is not clear on site, a land surveyor can establish it. Councils and property deeds sometimes limit the height and appearance of front boundary walls. For land belonging to a block of flats, the managing agent or freeholder decides.
How a formwork block wall is built
- Setting out the line and locating services. The line of the wall is marked with pegs and a string line exactly along the boundary. The finished height and the positions of posts and gates are fixed at the same time. Water, gas, electricity and telecoms cables along the route are located using utility records and a cable detector. Near gas and electricity, digging follows the utility owner's instructions only. If a gas pipe is damaged or you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).
- Digging the trench. The trench is dug to frost-free depth for the location and soil. The bottom is levelled and compacted.
- Strip foundation. Reinforcement is placed in the trench and concrete is poured. The concrete must be of the specified strength, for garden walls often C16/20 or higher as designed. Vertical starter bars must project from the foundation to connect with the reinforcement in the blocks. On a slope the foundation is stepped.
- Damp-proof course. Once the foundation has hardened, a strip of damp-proof membrane or a waterproofing slurry goes under the first course. It stops ground moisture rising into the wall. The starter bars pass through it.
- Laying the blocks. The first course is bedded in mortar and carefully levelled, as it sets the line and height of the whole wall. The following courses are laid in stretcher bond, with staggered joints.
- Reinforcement. Vertical bars go into the cores and horizontal bars into the block channels. Corners, piers and gate hanging points need extra reinforcement.
- Filling with concrete. Concrete is placed in stages, a few courses at a time. It is compacted by rodding or with a poker vibrator so no voids are left.
- Curing. In summer the wall is wetted for the first few days so it does not dry out too quickly. Concrete is not placed in frost without protective measures.
- Movement joints. A long wall is broken by movement joints at planned points, so concrete shrinkage does not cause random cracks.
- Finishing. Copings or a capping are fitted on top to shed water. The surface is rendered, painted, clad or left fair-faced.
Concrete needs time. It reaches full strength in roughly four weeks. Render, cladding and a heavy gate come only after it has cured sufficiently.
What the price depends on
The guide labour price is €17.00 per m². The area is the wall face, the length times the height. For example, a wall 20 m long and 1.5 m high is 30 m². When comparing quotes, ask whether the price per m² includes digging and the strip foundation or whether these are charged separately. Also check whether reinforcement and concrete are included, or labour only.
The same length of wall can be a simple job or quite a demanding one. The main factors are:
- ground: on level ground the foundation is simple. On a slope it must be stepped and drainage is often needed, which adds noticeably to the cost,
- access: when a ready-mix truck can reverse up to the trench, pouring is quick. Mixing by hand and barrowing takes far longer. A concrete pump can help, but it is a separate cost,
- height and block width: a taller wall means more courses, more reinforcement and pouring in stages. DT 25 is heavier, uses more concrete and needs a wider foundation than DT 20,
- complexity: corners, piers, gates and recesses for a letterbox or meter box add cutting and reinforcement work. A short wall with many corners costs more per m² than a long straight one,
- existing fence and buried services: removing the old fence and taking away the rubble add to the price. Near buried services digging is careful, often by hand,
- soil: clay, stony or waterlogged ground is harder to dig and may need a deeper foundation,
- finish: render, stone cladding or metal infill are separate extra stages. Fair-faced blocks save rendering but need slower, neater laying,
- spoil removal: excavated soil is either spread on site or taken away, which is a further cost. Before you hand over rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
What makes the job easier and what slows it down
Site preparation makes a real difference. The client can help mainly in these ways:
- paperwork sorted in advance: any permission, an agreed boundary and service location arranged. Utility information can take weeks to arrive, so request it before the digger crew is booked,
- water and power on site: water for mortar and curing, power for the mixer, saw and vibrator,
- space for materials: pallets of blocks, reinforcement and sand need firm, clear ground close to the wall line,
- cleared route: shrubs, roots and compost heaps removed in advance shorten the first day,
- agreement with the neighbour: for a boundary wall, work is often done from the neighbour's side too, and concrete may drip there during pouring,
- clear decisions: height, gate positions, infill type and finish settled before work starts, not during blockwork.
Weather is the main cause of delay. Rain complicates digging and pouring, frost stops it, and in hot spells the concrete needs more frequent curing. Breaks for hardening are needed between foundation, blockwork and finishing. The overall time is therefore longer than the labour alone would suggest.
Typical mistakes and how they show up later
The problem is rarely the blocks themselves, but what is under them and inside them. Many faults cannot be seen at handover and appear only after a few winters.
Shallow foundation
Frost or soil movement lifts it and after a few winters the wall leans or cracks. The repair usually means demolishing and rebuilding.
Reinforcement not tied into the foundation
The wall then just sits loosely on the foundation and can snap at the base in high wind. The risk is greatest with a tall solid wall.
No damp-proof course under the first course
Ground moisture rises into the wall. The lower part darkens, white efflorescence appears and render falls off in winter.
Filling to full height in one go
Wet concrete pushes on the blocks and can force them out or split them. The wall ends up bulging and out of line.
Concrete too wet or not compacted
Extra water makes pouring easier, but the concrete loses strength. Without rodding or vibrating, air pockets stay in the cores. This cannot be seen from outside, but the wall is weaker than it looks. Some areas may sound hollow when tapped.
No coping
Water gets in from the top, freezes and the render falls off. Dark damp patches and efflorescence appear along the top of the wall.
Long wall without movement joints
Concrete shrinks and without breaks vertical cracks appear, often at regular intervals.
Soil banked against the wall
A wall without waterproofing and drainage stays wet and suffers in winter. If more soil is added, the wall starts to act as a retaining wall it was never designed to be.
Gate hung too early
The pier tilts or cracks under the weight of the leaf and the gate then drags or will not close.
How to check the finished wall at handover
- the wall line matches the set-out boundary and the agreed height,
- the wall is plumb and the courses are straight, with no visible sag along its length. Sight along the wall or use a spirit level,
- there are no cracks, pushed-out blocks or traces of leaked concrete on the face,
- gate piers are solid and anchors are in the right positions,
- recesses, ducts and openings are where agreed,
- copings are firmly fixed and water drips clear of the wall face,
- movement joints are formed in a long wall,
- the ground around the wall falls away from it,
- the neighbour's land and the pavement are cleaned of concrete and soil,
- the contractor has provided details of the concrete used, confirmed the foundation depth and the damp-proof course, and stated when the wall can take infill or a gate.
DIY guide: a low garden wall in formwork blocks
A low wall up to about knee height on level ground, for example in DT 15 or DT 20, is within reach of a competent DIYer. Leave a taller solid wall, a wall on a slope or a wall that holds back soil to professionals. The same applies to digging near gas and electricity services. For a tall boundary, a concrete panel fence up to 2.1 m installed by a contractor may be a simpler option.
- Confirm the boundary and buried services, then set out the line with a string.
- Dig the trench to frost-free depth, level and compact the bottom.
- Place reinforcement with vertical starter bars and concrete the strip foundation.
- Let the foundation harden for a few days and keep it wet in hot weather.
- Lay a strip of damp-proof membrane on the foundation.
- Bed the first course in mortar and check it with a spirit level along and across.
- Lay the following courses in bond and keep checking for plumb.
- Insert vertical and horizontal reinforcement and tie it at the corners.
- Fill with concrete a few courses at a time and rod each layer.
- Fit copings with a fall or overhang so water drips clear.
- Render or treat the surface only once the concrete has cured.
Blocks and cement bags are heavy. Sturdy gloves, eye protection when cutting and a helper for laying and pouring are worthwhile.
Frequently asked questions
The guide price is €17.00 per m² of wall face. The final sum depends on the height, ground, access for machinery, number of corners and gates, removal of an old fence and whether the foundation and finish are included. This price does not apply to the thinner DT 12 and DT 15 blocks.
Multiply the length of the wall by its height above ground. Whether gate openings are deducted and whether the part below ground and the foundation are counted is a matter of agreement with the contractor. Check this when comparing quotes, otherwise they are not comparable.
The block manufacturer gives the concrete volume per m² of wall in the technical data sheet, and it is higher for DT 25 than for DT 20. Add the concrete for the strip foundation, which depends on its depth and width, and a small allowance for waste. The contractor should calculate the quantity before ordering ready-mix.
It is not essential, as the concrete wall will last without render. Render or masonry paint does improve the appearance and protects the surface from soaking up water. Fair-faced blocks do not need rendering.
It can, but it is then a retaining wall. That needs a structural design, thicker blocks, more reinforcement, waterproofing and drainage on the soil side. An ordinary boundary wall is not designed for that pressure.
Lighter infill is usually fitted after a few days. A heavier gate is best hung once the concrete has cured sufficiently, ideally after about four weeks. The exact time depends on the weather and the concrete used.
Concrete should not be placed in frost, as the water in fresh concrete would freeze and damage it. If there is no alternative, cold-weather admixtures and covers are used, but it is safer to wait for warmer weather.
Not always. For a low wall on level ground, a thicker block would only mean more concrete and labour without real benefit. DT 25 makes sense for taller walls, exposed windy sites or sloping ground.
Related work
How old fence removal works, including posts and footings, what makes the job harder, what to check before you start and how to inspect the result.
How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.
How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.
How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.
How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.
How a fence post up to 2.4 m is set in concrete, how deep the hole should be, which post to choose and how to check the finished work.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.