Home/Building work

Building work list 2026

Live rates for 23 trades. Pick a job, check unit prices and estimate the project directly from the price list.

23
trades
651
price list items
2026
current rates
Painting and decorating
23 items

Preparation · Painting · Project overheads · Other works

From€1.00/m²
Flooring
35 items

Preparation · Flooring · Specialist flooring · Other works

From€1.90/m²
Plasterboard and dry lining
20 items

Plasterboard systems · Plasterboard finishing · Overheads · Other works

From€1.40/m²
Tiling
37 items

Preparation · Wall and floor tiling · Sanitaryware installation · Other works

From€1.90/m²
Carpentry and joinery
26 items

Doors and frames · Stairs and balustrades · Mouldings and cladding · Windows and sills

From€15.00/pcs
Bricklaying and plastering
25 items

Masonry · Bricklaying and blocklaying · Renders and facades · Tiling and cladding

From€1.90/m²
Strip-out and demolition
27 items

Demolition and dismantling works · Other works

From€10.00/pcs
Electrical installation
32 items

Package deals · Electrical works · Inspections · Other works

From€6.80/pcs
Plumbing
29 items

Plumbing works · Package deals · Other works

From€13.00/pcs
Heating and air conditioning
47 items

Heating works · Other works · Air conditioning

From€12.00/pcs
Gas installation
16 items

Gas installations · Other works

From€15.00/pcs
Concrete cutting and core drilling
17 items

Concrete cutting · Other works

From€75.00/pcs