Price list 2026 · Europe

Installation of a Fence Post Brace up to 2.7m

Installing a fence post brace up to 2.7 m means fixing a diagonal steel strut to a fence post and setting its foot in concrete. The guide price is €1.70 per piece. Ground conditions, access and new or existing fence affect the cost.

Updated 09/2026·10 min read·22 price list items
Standard labour price
€1.70/ pcs
Indicative range
€1.36 - €2.20
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of a Fence Post Brace up to 2.7m

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing22 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Fencing cost

Install fence strut up to 2.7 mpcs€1.70 / pcspcsenter quantity-
Laying concrete fence blockspcs€4.00 / pcspcsenter quantity-
Building fence pierslm€22.00 / lmlmenter quantity-
Install concrete fencing up to 1.8 mlm€20.00 / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm€23.00 / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm€24.00 / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm€8.80 / lmlmenter quantity-
Install fence post up to 2.4 mpcs€25.00 / pcspcsenter quantity-
Install fence post up to 2.7 mpcs€28.00 / pcspcsenter quantity-
Install fence post up to 3.8 mpcs€35.00 / pcspcsenter quantity-
Install barbed wire extension armpcs€1.40 / pcspcsenter quantity-
Tension straining wirelm€0.50 / lmlmenter quantity-
Tension barbed wirelm€0.75 / lmlmenter quantity-
Install fence framepcspcs-
Install bespoke fence framepcspcs-
Install fence panelspcspcs-
Install mesh fencing up to 1.4 mlm€2.50 / lmlmenter quantity-
Install mesh fencing up to 1.8 mlm€2.70 / lmlmenter quantity-
Install mesh fencing over 3.0 mlm€3.70 / lmlmenter quantity-
Blockwork corner bondingpcs€1.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a brace does and which posts need one

A brace, often called a strut, is a diagonal steel support that stops a fence post from leaning. One end is fixed to the post and the other is concreted into the ground. This item covers braces up to 2.7 m long, as used on standard and taller garden fences. As part of fencing work, braces matter most for mesh fences, such as chain link, which are tensioned and pull hard on the end posts. Without braces, these posts often lean after the first winter or a strong wind, and the mesh sags.

Tensioned mesh or line wire pulls the posts along the line of the fence. On intermediate posts the pull from each side cancels out. On end and corner posts it does not, because the force acts from one side only. Braces therefore belong mainly here:

  • end posts: one brace, pointing along the fence,
  • corner posts: two braces, one along each side of the fence,
  • gate posts and points where the fence changes direction or runs onto a slope,
  • long straight runs: depending on the manufacturer, braces are also fitted at intervals, for example at straining posts.

The brace always sits on the mesh side, not behind the post. It acts as a prop that pushes the post against the pull of the mesh. On the opposite side, the pull would simply tear it away. Against wind acting at right angles to the fence, a brace set in line with the fence does very little. Panel fences, such as welded mesh panels, are therefore normally installed without braces, and their stability comes from solid post footings. The same applies to concrete panel fences up to 2.1 m high.

What to clarify before ordering

  • Number of braces: count the end posts (one each), corner posts (two each), gate posts and straining posts according to the fence system. The price is per piece, so an accurate count decides the budget.
  • Fence system: the brace and clamps must match the diameter and type of the posts. The simplest option is to buy them from the same manufacturer as the posts.
  • Who supplies materials: agree whether the fencer provides the braces, clamps and concrete, or whether you buy them yourself.
  • Boundary: the brace and its concrete footing should be entirely on your land. If the fence runs exactly on the boundary, the braces go on your side or their position is agreed with the neighbour.
  • Underground services: service pipes and cables often run near the boundary. Before digging, obtain service plans from the utility companies and have the services located on site.
  • Planning: whether permission is needed depends on the height of the fence, its position and whether it is next to a road. Check the Planning Portal or your local planning authority before building rather than assuming no permission is required, as listed buildings and conservation areas have stricter rules.

How a brace is installed step by step

The starting point is a firmly concreted, plumb post. The brace is fitted to it, ideally at the same time as the post or shortly afterwards, before the mesh is tensioned.

  1. Check the post. The post must be plumb and solid in the ground. A brace will not fix a loose post footing.
  2. Setting out. Decide the height at which the brace attaches to the post. This is usually in the upper third of the post, with the exact point set by the manufacturer's system. This determines where the foot of the brace will be in the ground.
  3. Angle. The brace should be at roughly 40 to 50 degrees to the post. A steep brace gives the post almost no support, while one that is too flat is long and can bow.
  4. Digging for the foot. A hole is dug for the concrete block, usually around 60 to 80 cm deep. In clay soil, which heaves more in frost, or in colder, exposed locations, it pays to go deeper. The base is compacted and, if needed, a layer of gravel is added.
  5. Fixing to the post. The brace is attached with a clamp or a bolted joint. The joint must be tight with no play.
  6. Propping. The post is checked again with a spirit level, and the brace is propped with wedges or battens so it cannot move during concreting.
  7. Concreting. The foot is filled with concrete, which is rodded or compacted to remove voids. The top is shaped to fall slightly away from the brace so water runs off.
  8. Protecting the metal. Any cut or drilled points on the brace are treated with zinc spray or anti-corrosion paint. The open end of the tube is closed with a cap so water cannot get in.
  9. Curing. Until the concrete has hardened, neither the brace nor the post must move. Tensioning the mesh waits at least several days, depending on the type of concrete and the weather.
  10. Final tightening. After the mesh is tensioned, the clamp is tightened once more.

Materials and options

Braces are usually made of steel tube or section, hot-dip galvanised and often also plastic coated in the colour of the fence. They should match the diameter and system of the posts, otherwise the clamps are hard to tighten properly. For taller and more heavily loaded fences, a thick-walled section is worth the extra cost.

Fixings: clamps, bolts and washers should be galvanised or stainless steel. A plain bolt will rust before the fence does.

Concrete: C16/20 or C20/25 concrete is commonly used, or a bagged post mix. With post mix, follow the manufacturer's instructions, particularly for the amount of water and the setting time.

What affects the price

The guide labour price is €1.70 per piece. It applies to a standard job: a new fence, diggable ground, clear access and a post that is already firmly set. The work costs more mainly in these situations:

  • Ground type: stony or compacted ground, made-up ground with rubble and tree roots slow the digging. If breaking out or drilling is needed, the price per piece can rise considerably, by a third or more.
  • Hand digging near services: where cables or pipes run along the boundary, the hole is dug slowly with a spade and no machinery. This adds labour.
  • Slope: the angle and depth of the foot must be measured more carefully, and the hole is often deeper on one side. This adds a little to the cost.
  • Poor access: a narrow strip between the fence and a building, established planting or a patio next to the fence mean more careful work and more clearing up.
  • Retrofitting to an existing fence: the mesh has to be slackened, the post straightened and the mesh re-tensioned once the concrete has cured. This is noticeably more work than on a new fence. If the old fence is beyond saving, removing the old fencing and starting afresh may make more sense.
  • Quantity: on a larger fence, the digging and concreting are done in one go, so each brace works out cheaper than fitting just one or two.
  • Materials: thick-walled sections, stainless fixings or coloured coated braces cost more than standard galvanised ones. If the fencer supplies the materials, they will include them in the price.

When comparing quotes, ask whether the price per piece includes concrete, clamp, treatment of cuts and cap, or labour only.

What makes the job easier and what slows it down

The job is quickest when the braces are fitted together with the posts, or when the posts are already set, plumb and the concrete beneath them has cured. The fencer then has nothing to straighten and no waiting time. When installing concrete fencing up to 1.8 m or another new fence, it is worth planning the braces into the same visit.

Start dates are often delayed by underground services. If they are located and marked before the fencer arrives, digging can begin straight away. It also helps to have the boundary marked and to agree in advance with the neighbour if access to their side is needed.

There should be water on site for mixing concrete and a clear area for storing materials and excavated soil.

Frost or prolonged rain, on the other hand, hold up the work. Frozen ground is hard to dig and concrete sets more slowly in the cold, so tensioning the mesh has to wait longer. Unnecessary delay also occurs if someone tensions the mesh before the braces are fitted. It then has to be slackened and tensioned again.

Common mistakes and how they show up later

Shallow footing. A small block just below the surface is lifted by frost and the brace stops supporting the post. This usually shows after the first winter, when the post starts to lean.

Wrong angle. A nearly vertical brace will not hold the post, the fence gradually leans and the mesh sags.

Brace on the wrong side. On the side away from the mesh, the pull only tears it away and the post bends towards the fence.

Play in the clamp. A small amount of play grows over time and the brace stops working. The fence springs when pushed.

Voids in the concrete. Concrete tipped in without compaction only looks solid. The foot moves under load and the concrete can crack.

Tensioning the mesh too early. Fresh concrete cannot take the pull and the post moves. This cannot be corrected without resetting the brace.

Unprotected cuts. A cut brace without paint starts to corrode right at the joint. An open tube without a cap also fills with water.

How to check the finished brace

  • the brace is on the side the mesh pulls towards, with two at each corner,
  • the angle to the post is roughly 40 to 50 degrees,
  • the post is still plumb after the mesh is tensioned,
  • the clamp is tight and the brace does not move in it,
  • the concrete footing has no cracks or visible voids,
  • water drains away from the footing and does not pool by the brace,
  • cuts are treated and open ends are capped,
  • the footing does not extend beyond the boundary,
  • when the top of the post is pushed by hand, the fence does not spring or lean.

If you want to fit the brace yourself

If your posts are firmly concreted and plumb, you can fit a brace yourself using the method above. Before digging, check whether a gas pipe, electric cable or water main runs at the spot. The utility companies can provide plans and help locate their services. If you damage a gas pipe while digging, move to a safe distance immediately and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Do not try to repair a damaged cable or pipe yourself, this is for the utility company only.

  1. Prepare the brace, clamp, galvanised bolts, concrete, gravel, spade, spirit level, tape measure, wedges or battens for propping, zinc spray and a cap in advance.
  2. Work in pairs. One person holds the brace at the correct angle and watches the level, the other tightens the clamp and pours the concrete.
  3. Check the angle before you start digging. Simply hold the brace against the post and mark the position of the foot with a peg.
  4. Mix the concrete in small batches and pour it in stages, rodding each layer straight away.
  5. Work in dry, frost-free weather so the concrete sets evenly.
  6. Only tension the mesh after the time stated by the concrete manufacturer, then tighten the clamp once more.

Frequently asked questions

The guide price is €1.70 per piece. The final amount depends on the type of ground, access to the fence, any slope, the number of braces and whether they are fitted to a new or an existing fence.

Related work

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.