Installation of Concrete Fencing up to 1.8 m

Installing concrete fencing up to 1.8 m means setting slotted concrete posts in concrete footings and sliding panels between them to form a solid wall. The guide price is €20.00 per running metre, depending mainly on ground, soil and access.

Updated 09/2026·12 min read·22 price list items
Standard labour price
€20.00/ lm
Indicative range
€16.00 - €26.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of Concrete Fencing up to 1.8 m

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing22 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Fencing cost

Install concrete fencing up to 1.8 mlm€20.00 / lmlmenter quantity-
Laying concrete fence blockspcs€4.00 / pcspcsenter quantity-
Building fence pierslm€22.00 / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm€23.00 / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm€24.00 / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm€8.80 / lmlmenter quantity-
Install fence post up to 2.4 mpcs€25.00 / pcspcsenter quantity-
Install fence post up to 2.7 mpcs€28.00 / pcspcsenter quantity-
Install fence post up to 3.8 mpcs€35.00 / pcspcsenter quantity-
Install fence strut up to 2.7 mpcs€1.70 / pcspcsenter quantity-
Install barbed wire extension armpcs€1.40 / pcspcsenter quantity-
Tension straining wirelm€0.50 / lmlmenter quantity-
Tension barbed wirelm€0.75 / lmlmenter quantity-
Install fence framepcspcs-
Install bespoke fence framepcspcs-
Install fence panelspcspcs-
Install mesh fencing up to 1.4 mlm€2.50 / lmlmenter quantity-
Install mesh fencing up to 1.8 mlm€2.70 / lmlmenter quantity-
Install mesh fencing over 3.0 mlm€3.70 / lmlmenter quantity-
Blockwork corner bondingpcs€1.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a concrete panel fence is and why people choose it

A concrete panel fence is made of slotted concrete posts set in concrete footings, with precast concrete panels dropped into the slots from above. The result is a solid wall with no gaps. It sits within the wider range of fencing options, and people usually choose it for privacy, a quieter garden away from the street, and a fence that does not need treating or painting every few years.

Panels come in different finishes: plain, or with a stone, brick or timber effect. The finish affects only the appearance and the material cost. The installation method stays the same.

When a 1.8 m fence is enough

A fence up to 1.8 m is the usual choice for houses and gardens. It blocks the view from the pavement and clearly marks the boundary without feeling like a fortress. A person of average height on a level pavement normally cannot see over it. A taller person, or someone on a pavement or road set higher than the garden, may still be able to look over.

If unsure, stand where you will sit most often and check where you can be seen from. On a plot lower than the road or the neighbouring garden, 1.8 m may screen less than expected. In that case people often go for a concrete panel fence up to 2.1 m high, which is also chosen beside a busy road or to reduce noise. Concrete panel fencing up to 2.4 m is more common on commercial sites or in dense built-up areas. Taller fences present a larger surface to the wind, so they need deeper and wider footings, stronger and often reinforced posts and, with heavier panels, lifting equipment. Also bear in mind that every fence shades beds and neighbouring gardens, and a taller one more so.

What to decide and arrange in advance

Planning rules and the boundary

Whether a fence needs planning permission depends on its height, its position, whether it is next to a road and on local circumstances such as a listed building or a conservation area. Rules are stricter for taller fences and for fences beside a highway, so a fence up to 1.8 m does not automatically mean nothing needs checking. Check the Planning Portal or confirm with the local planning authority before work starts. Many fences on houses are permitted development, but residential permitted development rights only apply to houses, can be removed in certain areas by Article 4 Directions, and listed buildings and conservation areas have stricter rules. Also check the title deeds for any covenants about boundaries.

The boundary matters just as much. The fence should stand on your own land. Title plans often show only the general line of a boundary, so if in doubt it is worth having it established by a land surveyor. Any boundary markers must not be disturbed when digging. It is sensible to talk to the neighbours beforehand.

Underground services

Water and drainage pipes, electricity cables, gas pipes and telecoms lines often run near a boundary. Digging post holes blind is dangerous. Before excavating, obtain service plans from the utility companies and have the routes located and marked. If the fence crosses or runs alongside a service, the post is moved so that the footing does not put it at risk. Any work on gas must be carried out only by a Gas Safe registered engineer, and electrical work only by a qualified electrician. If a gas pipe is damaged or you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).

Gates, side gates and a post box pillar

Gates and side gates need separately sized posts, planned from the start. A standard fence post will not carry a gate. Before installation, decide where the drive entrance, footpath gate, post box, doorbell and any meter box will go. If a cable for an electric gate opener or a doorbell is needed, lay a duct in the ground before the ground is finished. The connection itself is done by an electrician. A new circuit, for example for a gate opener, is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.

Panel and post system

Choose a specific system before setting out. Post spacing follows the panel length of that system, often around 2 m, and changing it later means measuring everything again. Also ask whether corner and end posts, post caps and gravel boards are available. A gravel board goes into the ground as the lowest panel.

Step-by-step installation of a concrete fence

  1. Setting out: mark the line of the fence along the boundary, drive in pegs and stretch a string line between fixed points at the start and end of each run.
  2. Marking post positions: mark the post positions exactly to the panel length of the chosen system. Measure from post centre to post centre, not from the edge of the hole.
  3. Digging: dig the footing holes by hand or with an auger, and remove what is left of any old fence including its foundations.
  4. Setting the posts: set the posts in concrete, plumb them with a spirit level in both directions and brace them with battens or props. Check post height against the string line.
  5. Corners and ends: add bracing or extra support at corners and ends as the manufacturer specifies.
  6. Curing: leave the concrete to cure until it has gained sufficient strength.
  7. Fitting the panels: slide the panels into the post slots from the bottom up, checking alignment as you go. The bottom panel or gravel board is laid level on a prepared bed so the courses above do not wave.
  8. Finishing: fit the post caps, backfill and compact around the posts, and grade the ground so that water runs away from the fence.

Why can the panels not go in straight after concreting? Fresh concrete cannot yet take the weight and the sideways load, so a post could shift and the whole run would end up crooked. In warm weather panels are usually fitted after several days at the earliest, often around a week. Concrete reaches full strength in roughly 28 days. The exact time depends on the system manufacturer and the weather. Concrete hardens more slowly in cold weather and should not be poured in frost.

Footings, posts and panels: what matters

Footings should go at least below frost depth. For a 1.8 m fence on good ground, post holes are commonly around 600 mm deep. At this height the hole is typically around 300 × 300 to 400 × 400 mm in plan, and the exact size is given by the system manufacturer. On clay, waterlogged or made-up ground the footings need to go deeper, with more excavation to allow for.

Footings are normally made with concrete of suitable strength, for example class C16/20 or higher, well mixed and compacted. The posts must match the fence height: for 1.8 m, use posts designed for that number of panel courses.

Choose panels that are frost-resistant and well made. A cheap panel with a porous surface may start to flake and crack after a few winters. When the delivery arrives, check the edges and surfaces while the panels are still on the pallet. It is better to reject a damaged piece straight away than to find it in the finished fence.

Cost of installing a concrete fence: what it depends on

The guide labour price is €20.00 per running metre. Running metres are counted along the length of the fence, so simply measure the runs to be fenced. Gates and side gates are normally priced separately. The actual price is affected by these factors:

  • Ground: level ground is the simplest. A slope means stepping the panels, more precise measuring and more cutting or levelling. On a steeper slope the price per running metre rises noticeably.
  • Soil: stony or waterlogged ground makes digging harder and often needs deeper footings or drainage. Rock or old concrete in the ground may also mean using a breaker.
  • Old fence: it has to be taken down and its foundations removed first, otherwise they get in the way of the new footings. Old fencing removal and disposal are a separate job. Before old concrete and rubble are taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • Access: a narrow entrance or a back garden means carrying materials by hand. With heavy panels this slows the work considerably.
  • Complexity of the line: many corners, short runs and changes of direction mean more corner posts, bracing and cuts. A long straight run works out cheaper per running metre.
  • Decorative panels: stone, brick or timber effects do not change the method, but they need more careful handling so the edges are not chipped. This slows the work slightly.
  • Gates and side gates: separately sized posts and their footings take more work than a standard post.
  • Small jobs: on a few metres of fence, transport and preparation costs are spread over few metres, so the price per running metre is higher.

When comparing quotes, ask exactly what is included: digging the footings, concrete, removal of spoil, taking down the old fence, delivery of materials and making good the ground. Quotes that look cheaper sometimes leave these items out.

What makes the job easier and what slows it down

A lot of time can be saved by what is prepared before the installers arrive:

  • the boundary is established and any boundary markers are clearly marked,
  • underground services are located and marked on the ground,
  • any planning questions are settled so the work does not have to stop,
  • the strip along the future fence is clear: shrubs, compost bins, logs and toys are removed,
  • it is agreed where the pallet of panels will be unloaded and where the excavated soil will go,
  • the delivery lorry has somewhere to stop and is not blocked by parked cars or a low gateway,
  • water and a power socket for the mixer are available on site,
  • the neighbours know the dates, especially if work will be done from their side,
  • the positions of gates and the post box are decided and ducts are laid in the ground.

Work is delayed by rain, which floods the holes and softens the ground, and by frost, when no concreting is done. It is sensible to plan installation between spring and autumn and leave some slack for the weather.

Common mistakes and how they show up later

Shallow footings. Frost heaves them and the fence leans after a few winters. Typically one post drifts out of line and the panels start to rub or drop out of the slot.

Inaccurate spacing. A panel will not fit the slot or leaves a gap. The installer then cuts the panel or adds packing, which is visible and weakens the joint.

Post out of plumb. On a long run the error adds up and the line waves. Looking along the fence it is obvious straight away, and the fix means taking out the panels and resetting the post.

Rushing the panels into uncured concrete. The post shifts under the weight of the panels while the footing is still fresh. The fence may look fine at handover, but a few weeks later the run is crooked.

Missing support at corners and ends. This is where the load is greatest. After a storm the corner post twists or leans and pulls the neighbouring bays with it.

Ignoring water. If water collects around the footings, the concrete suffers from frost and the ground softens. This shows as cracking around the footings, moss on the bottom panels and gradual leaning.

Bottom panel without a level bed. If the bottom course is not level, the whole bay is out of true and gaps open between the panels.

Fence off the boundary. In a boundary dispute or when selling the property, the fence may have to be moved, which means building it again.

How to check the finished fence

  • posts are plumb, checked with a spirit level in both directions,
  • the fence follows one straight line without waving, checked with a string line or by sighting along it,
  • the top edges of the panels are level or, on a slope, stepped evenly,
  • panels sit in the slots without gaps or changes in height,
  • no panel has chipped edges, cracks or a flaking surface,
  • corners and ends are supported and do not move when pushed,
  • post caps are fitted and secure,
  • the ground around the posts is backfilled, compacted and water runs away from the fence,
  • posts for the gate and side gate are prepared as agreed and ducts are laid,
  • leftover concrete, broken pieces and packaging are cleared away,
  • the fence stands in the agreed position relative to the boundary.

DIY guide: what to watch for when installing it yourself

A fence up to 1.8 m on level ground with good access can be built as a DIY project following the method above. On a slope or on poor ground a professional contractor is the more sensible choice. For your own work, these points help:

  1. Work in at least a pair, wearing gloves and sturdy boots. Panels are heavy and, if dropped, will break fingers as well as the panel edges.
  2. Before digging, have any planning questions settled, the boundary established and underground services located.
  3. Set the end and corner posts first, then the rest. Stretch string lines between the end posts at the top and the bottom so plumb and height can be checked at the same time.
  4. Check the spacing of each next post with a template: lay the bottom panel or gravel board between the posts on the ground or bed so that the posts are not holding or pressing on it. The board is for measuring only, not a load. Fitting panels into the slots starts only once the concrete has cured.
  5. Brace each post from two sides once it is plumb and do not touch it until the concrete has cured.
  6. Do not pour concrete in frost, and in hot weather keep the concrete in the footings damp for several days so it does not crack.

Frequently asked questions

The guide labour price is €20.00 per running metre. The final figure depends mainly on the ground, the soil, access to the fence line, removal of an old fence and the number of corners, gates and side gates. Ask whether the price includes digging, concrete and removal of spoil.