Building work price list: Installing Drainage Channels into Concrete
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Drainage cost | ||||
| Installation of drainage channel into concrete | lm | €6.80 / lm | lm | enter quantity- |
What a drainage channel is and where it is used
A drainage channel, often called a linear drain or channel drain, is a narrow channel covered by a grating. It collects rainwater from a hard surface and carries it away from the house. The concrete bed and haunching hold the channel in place, so it does not move even under a car wheel. Channels are most often fitted across a garage entrance, on a driveway, along a patio or in front of a door. In short, they go wherever puddles form after rain or water runs towards the walls of the house.
A channel deals with water flowing across the surface. It does not stop rising damp in the walls, and it does not drain waterlogged ground under a lawn. If the base of the wall stays damp even in dry weather, the problem lies elsewhere and a channel alone will not solve it.
The work is priced per running metre, that is, by the length of the channel. Before asking for quotes, measure how long the channel needs to be and note where the water should drain to. For an overview of related paving work and how it fits together, see the guide to block paving and edging costs.
What to decide before digging starts
Before the contractor arrives, the following points should be clear:
- Where the water will go. Without an outlet, a channel is just a long puddle. Decide whether the water will go to a drain, a soakaway or a storage tank.
- What will drive over the channel. This determines the load class of both the channel and the grating.
- Exactly where it will sit. At a garage, directly in front of the door. At a patio, along its lower edge. At an entrance, where water naturally runs.
- What surface will surround it. This may be block paving, concrete or natural stone. The level of the top of the grating is set from the finished surface.
- Whether roof water will also run into the channel. A downpipe discharging into the channel greatly increases the volume of water. This must be allowed for when choosing the channel width and the outlet.
Which channel to choose
The main deciding factor is what will walk or drive over the channel. Channels and gratings are sorted into load classes under the European standard that manufacturers use. The classes are marked with a letter and a number. The lowest is A15 for pedestrian areas. B125 is used for domestic garages and car parks. Higher classes are intended for heavier traffic. For a footpath or patio the lowest class is enough, for a car entrance a class suitable for car parks is chosen, and heavier vehicles need a higher class still. The class is given in the manufacturer's literature.
- plastic channels are light, easy to cut and suitable for patios, paths and domestic car entrances, where the manufacturer approves them for the required class,
- polymer concrete and concrete channels are heavier and stiffer, carry loads better and are used on driveways, parking areas and yards with vehicle traffic,
- galvanised steel gratings are common on pedestrian areas and patios,
- cast iron gratings are chosen where cars drive, because they are strong and can be locked to the channel so they do not lift when driven over.
A simple rule applies: both the channel and the grating must match or exceed the load class of the area. A strong grating on a weak channel does not solve the problem.
On a patio where people walk barefoot, the grating pattern is worth considering. Slot gratings and mesh gratings with fine openings are more comfortable underfoot and do not catch heels. On a driveway it matters more that the grating is locked to the channel and does not rattle when driven over.
Fall and connection to the outlet
The water in the channel must have somewhere to flow. Some channels have a fall built into the base. Others are laid level, and the water drains thanks to the depth of the channel and the outlet. If the fall is created when laying, about 0.5 to 1 % is usually chosen, depending on the manufacturer's recommendation, which is roughly 5 to 10 mm per metre of length. On a channel five metres long with a 1 % fall, the difference in level is about five centimetres.
The surface itself is just as important. Paving or concrete must fall towards the channel, otherwise the water will run past it.
The outlet is chosen to suit the property:
- a connection to a surface water drain or a combined sewer,
- discharge into a soakaway crate or soakaway pit, where the ground allows,
- discharge into a rainwater harvesting tank.
Do not connect to a public sewer without the agreement of the water company responsible for it. Surface water should not be discharged into a foul-only drain. Many councils and water companies now prefer rainwater to stay on the property. Whether a larger drainage alteration or a new connection needs approval should be checked with the local council and building control. Do not assume that no approval is needed. In a block of flats, agree the work in advance with the managing agent or the freeholder.
A soakaway only makes sense where water actually drains into the ground. In clay soil a soakaway fills quickly and the water backs up into the channel. A soakaway also should not be placed close to the foundations of the house, so that water does not seep towards the walls.
How a channel is installed into concrete, step by step
- Setting out the line and levels: the installer runs a string line or uses a laser level. This fixes where the top of the grating will be and which way the water will flow. Only then does digging start.
- Excavation: the trench must be wider and deeper than the channel itself, because concrete goes around it. For pedestrian class A15, about 10 cm of concrete under and beside the channel is usually allowed. For class B125 for cars it is typically about 15 cm. The exact figures are given in the manufacturer's instructions for the specific channel.
- Sub-base: the trench bottom is compacted. Depending on the ground and the load, a compacted layer of hardcore or crushed stone is added. Further detail is in the guide to sub-base preparation and the levelling course.
- Concrete bed: a layer of concrete is placed on the stone, and the channel units are bedded into it one by one. Under channels for cars, C25/30 concrete is commonly used. For pedestrian areas manufacturers often allow a lower grade.
- Laying the units: channels are laid from the lowest point, that is, from the outlet or gully, working upstream against the direction of flow. Each unit is aligned to the string line and the joints interlock.
- End cap and outlet connection: an end cap is fitted at the start of the run. The outlet is connected to the pipe leading to the drain, soakaway or tank, and the joint is sealed. This is done before haunching, while the joint is still accessible.
- Haunching: concrete is placed along both sides of the channel. With plastic channels the gratings stay in place during concreting, otherwise the pressure of the concrete could bend the side walls.
- Finishing the surface: the surrounding surface, such as block paving or concrete, is completed. The top of the grating stays slightly below the adjacent surface.
- Curing: the concrete must cure sufficiently before it is loaded. In normal weather a car is usually allowed over it after about 7 days. Concrete reaches full strength after 28 days, and longer in cold weather.
- Water test: water is poured into the channel to check that all of it drains away.
Cost of installing a drainage channel: what it depends on
The guide price for the labour is €6.80 per running metre. The price is based on the length of the channel. When comparing quotes, find out exactly what the price per running metre includes. Excavation, concrete, outlet, gully, soakaway, drainage pipework and reinstating the paving are often separate items.
- New or existing surface: installation is cheapest on a new surface, where the channel goes in before the paving. Retrofitting into a finished surface means cutting out paving or concrete and then reinstating it, which adds considerably to the cost. Lifting existing blocks is covered in the guide to block paving removal.
- Load class: a higher class means more concrete haunching, a deeper trench and heavier units. A channel for cars takes more work than one beside a patio.
- Ground conditions: poor ground, such as clay or made ground, has to be replaced or stabilised. This adds labour and materials.
- Route: a long run with several corners and junctions, or an outlet far from the channel, increases the number of cuts, fittings and metres of pipe.
- Outlet: a short connection to an existing gully is simple. A new soakaway crate or a long trench to the drain is a separate and larger job.
- Access and machinery: buried services, tight access or hand digging without a mini digger slow the work and raise the cost.
- Channel material: heavy concrete and polymer concrete units take longer to handle than plastic ones, especially when placed by hand.
- Small jobs: on a short channel, travel, mixing concrete and finishing make up a larger share of the price. The price per metre is therefore usually higher than on a longer run.
How to prepare so the work is not delayed
A lot can be prepared by the customer so the work runs without delays:
- Located services. Find out in advance where electricity, gas, water and drainage run, and request service plans from the utility companies. A cable or gas pipe damaged during digging stops the work and is dangerous. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Alterations to gas pipework must only be carried out by a Gas Safe registered engineer, and electrical work only by a qualified electrician.
- Clear surrounding levels. It helps the installer to know how thick the paving will be, where the garage and patio thresholds are and which way the surface should fall.
- Agreement on the outlet. Any consent from the water company or approval from the council should be in place before work starts, not during concreting.
- Space on site. Move the car off the area, keep the entrance clear for material deliveries and decide where excavated soil can be stored temporarily. Before you hand over the excavated soil, broken paving or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Weather. Concrete is placed in mild weather. Frost damages fresh concrete. In hot weather and direct sun the concrete must be protected from drying too quickly. In rain the trench floods and the work is postponed.
- Time without the car. For about a week after concreting it will not be possible to drive over the channel into the garage. Arrange parking elsewhere for that time.
Common installation mistakes and how they show later
Channel set too high. This happens often. The grating then stands proud of the paving, water stops beside it and tyres break it. The top of the grating should usually sit a few millimetres below the surrounding surface, and manufacturers state about 3 to 5 mm.
Too little concrete at the sides. The channel moves over time and the paving around it opens up. On a driveway this shows first where wheels brake and turn.
Concreting without the gratings fitted on plastic channels. The side walls bend, and the grating then does not fit, rattles or cannot be lifted out.
Uncompacted sub-base. The channel settles and a dip forms, holding standing water where silt collects.
No expansion joints in large concrete areas. The concrete cracks along the channel because it has no room to expand.
Missing end cap or leaking outlet. Water runs under the channel and washes out the bedding. It goes unnoticed at first, and later the channel sinks.
Surface falling away from the channel. The channel stays dry and the water runs towards the house, even though the channel itself is well laid.
Load class too low. A plastic channel rated for pedestrians cracks or deforms under a car, and the grating bends and lifts out.
Loading before the concrete has cured. Driving over it after a few hours or a single day disturbs the fresh haunching and the channel works loose.
DIY guide: a short channel beside a patio or path
A short plastic class A15 channel beside a patio or path is manageable as a DIY job. The method is the same as the professional process described above. For a car entrance or a connection to a sewer, it is more sensible to use a contractor. Before digging, have the buried services located.
What works well for DIY installation:
- Buy the channels, end cap and outlet unit from the same manufacturer and read the instructions. They give the trench and concrete dimensions.
- Drive timber pegs in at each end of the run and stretch a string line between them at the level of the top of the grating. Measure the height from the finished paving, not from the ground.
- When digging by hand, compact the trench bottom at least with a hand tamper. For a longer run, hire a plate compactor, as described in the guide to sub-base compaction with a vibrating plate.
- For small quantities, use bagged dry concrete mix and mix it to a semi-dry consistency so the channel does not sink into the bed.
- Cut plastic channel with a fine-toothed saw and cut square so the joint seats properly.
- Tap each unit gently to the string line with a rubber mallet rather than pressing it down with a foot.
- Keep the gratings in place throughout concreting and compact the concrete at the sides by hand.
- In warm weather, cover the fresh concrete with polythene or keep it damp for a few days before laying the paving.
How to check the finished channel at handover
At handover it is useful to have a bucket of water and a spirit level or straightedge to hand. It is also worth checking the channel during the first heavy rain.
- lay the straightedge across the channel onto the paving: there should be a small gap beneath it along the whole length, and the grating must not touch it,
- sight along the channel from one end: it should be in a straight line with no steps at the joints,
- walk over the gratings and, on a driveway, drive slowly over them: the gratings must not rattle or move,
- pour a bucket of water in at the highest point: it should all drain to the outlet with no puddle left in the channel,
- at the outlet and end cap, check that water is not escaping under the channel,
- inspect the haunching where visible: it should be free of cracks and voids,
- pour some water onto the surface a few metres from the channel and check that it flows towards it,
- ask the installer for the load class of the channel and grating, which is usually stamped on the grating,
- try lifting one grating: it should come out without levering, so the channel can be cleaned,
- ask when the area can be driven over.
Frequently asked questions
A guide price is €6.80 per running metre. The final price depends on the load class, the ground conditions, whether the channel goes into a new or existing surface, and the outlet arrangement. The outlet, soakaway and reinstating the paving are usually separate items.
For pedestrian areas manufacturers sometimes allow a simpler installation, but a concrete bed and haunching are more reliable. On driveways and parking areas concrete is practically essential, otherwise the channel moves under the wheels.
Usually after about 7 days for a car, if the weather is not cold. Concrete reaches full strength after 28 days, and longer in cold weather. Foot traffic is possible sooner. The installer will confirm the exact time based on the concrete used and the weather.
It depends on the type of sewer serving the property and what the water company allows. Surface water should not go into a foul-only drain. Check in advance with the water company and the local council. A common solution is a soakaway on the property.
A few times a year is usually enough, especially after leaf fall, after heavy storms and before winter. The gratings are lifted, debris is scooped out and the channel is flushed with water.
Usually directly in front of the garage door, where it catches water running down the driveway before it gets inside. The driveway must fall towards the channel, and both the channel and grating must be rated for cars.
Most often because a unit has settled on an uncompacted sub-base, the channel has no fall or the outlet is blocked. A blockage is cleared by cleaning. A settled unit has to be lifted and relaid at that point.
Related work
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
How to lift block paving without needless damage, when to reuse the blocks, and what to watch with kerbs, buried services and waste disposal.
What a levelling course under block paving is, which material to use, how thick it should be and how to screed it flat before laying.
How to compact a gravel sub-base with a vibrating plate: layer thickness, number of passes and how to check the base is firm enough for paving.
How a compacted gravel sub-base up to 30 cm thick is built, when it is enough, how the layers are compacted and what to check before paving goes on.
When a crushed stone sub-base up to 50 cm is needed, how it is laid and compacted in layers, which aggregate to use and how to check it before paving.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.