Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
Heating and air conditioning34 items
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Heating works | ||||
| Replace return valve | pcs | 19,04 € | - | |
| Remove & re-install radiator (complete) | pcs | 170,40 € | - | |
| Remove gas / electric boiler | pcs | 102,23 € | - | |
| Remove hot water cylinder | pcs | 109,25 € | - | |
| Install & connect panel radiator | pcs | - | ||
| Install bathroom towel radiator | pcs | 50,10 € | - | |
| Lay underfloor heating insulation board | m² | 3,50 € | - | |
| Underfloor heating pipe installation | m | 6,50 € | - | |
| Install underfloor heating manifold | pcs | - | ||
| Install gas condensing boiler | pcs | - | ||
| Install thermostatic radiator valve (TRV) & head | pcs | 19,04 € | - | |
| Earth / bond heating system | pcs | - | ||
| Replace thermostatic radiator valve (TRV) | pcs | 19,04 € | - | |
| Install circulation pump | pcs | - | ||
| Pre-wire for smart thermostat connection | pcs | - | ||
| Install & connect low-loss header | pcs | - | ||
| Install expansion vessel | pcs | 54,12 € | - | |
| Install recirculation pipework | pcs | - | ||
| Install domestic hot water (DHW) / recirculation pump | pcs | - | ||
| Thread pipework | pcs | 10,02 € | - | |
| Flame weld metal pipework | pcs | 20,05 € | - | |
| Pressure test heating system | hr | 40,10 € | - | |
| Drain heating system | pcs | - | ||
| Fill, bleed & balance heating system | hr | 40,10 € | - | |
| Pipework for radiators | lm | 9,02 € | - | |
| Flush & clean existing heating system | hr | 45,10 € | - | |
| Pipe freezing | pcs | 34,08 € | - | |
| Cap off radiator | pcs | 65,15 € | - | |
| Fill heating system | pcs | - | ||
| Chase heating pipes in floor | lm | 24,06 € | - | |
| Concrete-in heating pipes in floor | lm | 6,50 € | - | |
| Install radiator bracket | pcs | 17,04 € | - | |
| Install radiator valves | pcs | 17,04 € | - | |
| Pressurise & bleed radiator | pcs | 14,03 € | - | |
Total labour
- enter quantity
Related work
Price the whole project, not just one job
In the building work price list you pick items from every trade, and NUMIQ turns them into a client-ready quote.