Chasing Heating Pipework

Chasing heating pipes into a floor means cutting a channel in the screed, laying the pipes to the radiator and filling it. Guide price: €24.00 per running metre, mainly depending on screed hardness and the floor finish.

Updated 09/2026·10 min read·34 price list items
Standard labour price
€24.00/ lm
Indicative range
€19.20 - €31.20
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Chasing Heating Pipework

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

When heating pipes are chased into the floor

Once the channel is filled, the pipework disappears under tiles or a floating floor and the radiator is fed straight from the floor, with no pipes running across the wall. This job is part of wider heating work, and homeowners usually choose it in these situations:

  • moving a radiator to a new position, for example under a new window or onto a wall where it will not get in the way of furniture,
  • replacing old steel pipework with plastic during a flat or house refurbishment,
  • appearance: they do not want pipes visible on the wall or running along the skirting.

Every radiator needs two pipes, a flow and a return. In a floor they usually run side by side in one wider chase or in two parallel chases. Keep this in mind when comparing quotes.

What to decide before chasing the floor for heating pipes

A route is hard to change once filled, because every change means more chasing and another floor repair. It pays to have everything clear before the first cut.

Floor build-up

The installer first establishes what the floor is made of. In a typical flat there is acoustic insulation above the structural concrete slab, then a screed, and on top the tiles or another floor finish. The chase belongs in the screed, not in the structural slab. If the screed is thin, the chase will hardly fit and a different route has to be found.

Route

The route should be as short as possible with as few bends as possible. It is marked out from the design drawings or from a sketch agreed with the customer. Decide in advance:

  • exactly where the radiator will go and from which side the pipes will connect to it,
  • where the pipes will start, from a manifold or from the riser,
  • whether the route runs under a future kitchen, fitted wardrobe or anywhere the floor may be drilled later,
  • whether the route crosses a movement joint or passes under a threshold or wall.

Pipework

Plastic pipe is the most common choice for floors, typically multilayer (plastic with an aluminium core), PEX or polybutylene. It is run in one length, ideally with no joint at all between the manifold or riser and the radiator. Copper is also used, but in a floor it must be lagged or sleeved so it is not in direct contact with the mortar.

Pipe insulation is not only about heat loss. The pipe expands as it heats up and the soft sleeve gives it room to move. Without it, the mortar above the chase can crack and the pipe can tick and creak.

Is chasing needed at all

Chasing is not the only option. If a new floor is being laid, the pipes can often go in the insulation layer under the new screed with no chasing at all. In other cases they can run in the wall, behind a plasterboard lining, in a special skirting duct, or be hidden under radiator boxing in near the radiator. It is worth comparing these before deciding.

Chasing heating pipes in a block of flats: building management and approvals

In a concrete-framed block of flats there is often only a thin screed directly over the reinforced concrete floor slab. The chase must not be cut into the slab. Damaging the reinforcement weakens the structure, which is shared by everyone in the building. If the screed is not deep enough for a chase, choose a different route or take advice from a structural engineer.

Before work starts, contact the managing agent or freeholder, and check whether your lease requires consent for alterations. Where the heating is communal, draining it down, working on the riser or connecting new pipework must always be agreed with them. Noisy work is usually governed by the building rules, so it is courteous to let neighbours know in advance.

Whether your alteration needs any approval depends on the scope of the work and on whether structural elements are affected. Do not judge this yourself - check with your local authority building control. Connection to the heating system and the pressure test should be carried out by a heating engineer who takes responsibility for the work.

Chasing heating pipes step by step

  1. Marking out the route: the agreed route is drawn directly on the floor.
  2. Checking for services: a detector is used to confirm that no electrical cables, water pipes or existing underfloor heating run along the route. In homes built before 2000, any suspect materials should be tested for asbestos before cutting or breaking out.
  3. Exposing the floor: the floor finish is removed in a strip above the route, for example by lifting tiles.
  4. Cutting: a wall chaser or an angle grinder with a diamond blade cuts two parallel lines and the material between them is broken out. The chase must be deep enough to leave at least about 2 cm of mortar above the insulated pipe.
  5. Cleaning: dust and debris are cleared out of the chase.
  6. Laying the pipe: the insulated pipe is laid in the chase and fixed so it cannot move during filling. If the system has to be emptied for the connection, draining the heating system is planned for this stage.
  7. Pressure test: the heating engineer pressurises the pipe above its working pressure (in practice often around 1.5 times the working pressure) and watches the gauge for several hours to check the pressure does not drop. The exact values and duration are set by the pipe manufacturer.
  8. Recording: the route is photographed and its distances from the walls are measured.
  9. Filling: the pipe stays under pressure while the chase is filled, so any damage shows immediately. The chase is filled with repair mortar flush with the surrounding screed. A strip of reinforcing mesh, overlapping the edges of the chase, is embedded in the mortar or in the tile adhesive above it to stop tiles cracking along the line of the route.
  10. Reinstating the floor: once the mortar has dried, the floor finish is reinstated and the radiator is connected, the system refilled and bled.

The pressure test comes before filling because a leak is hard to find afterwards and fixing it means breaking the floor open again.

What the cost of chasing pipework depends on

The guide price for labour is €24.00 per running metre. It is charged by the length of the chase in running metres. When reviewing a quote, check whether the price is per metre of chase or per metre of pipe. If the flow and return run in one chase, this makes a difference when comparing.

The difficulty, and therefore the final price, depends mainly on:

  • screed hardness: very hard concrete screed or screed reinforced with steel mesh cuts slowly, wears out blades quickly and makes the job noticeably more expensive. This is still screed, not the structural slab. Age does not decide hardness - older concrete screed is often harder than new. Weak, crumbly screed cuts more easily, but the chase can break up and needs more repair.
  • screed thickness: if it is thin, another, often longer route has to be found.
  • floor finish: lifting and relaying tiles takes more work than exposing bare screed in an unfinished property. Retiling is usually a separate item.
  • length and shape of the route: every bend and every pass under a threshold or wall slows the work. Short routes with many bends cost more per metre than a long straight run.
  • number of pipes in the chase: a wider chase for both flow and return means more cutting and more mortar.
  • furnished rooms: in an occupied home there is extra protection, moving furniture and more thorough cleaning.
  • removing rubble: in a building without a lift it has to be carried down the stairs. Before the rubble is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • related work: draining and refilling the system, the pipe itself, the pressure test and radiator removal and installation are usually listed separately in the quote.

What makes the job easier and what slows it down

  • Timing outside the heating season. In a block of flats, draining a riser in winter is harder to arrange and building management often allows it only on certain days. Outside the season the work is easier to schedule and there is no waiting.
  • Power and water on site. The wall chaser and vacuum need a protected power supply, and wet cutting also needs water.
  • Spare tiles. If the original tiles go back after filling, it helps to have a few from the same batch. Some tiles almost always break when lifted.
  • Coordinating trades. Chasing and filling come before the new floor is laid. The electrician and tiler should know where the pipes run, and their work should not happen in the same room at the same time.
  • Drying time in the programme. Flooring cannot be laid straight after filling, so allow for this when booking the tiler.

Common mistakes when chasing heating pipework

Chase too shallow and no mesh

Only a thin layer of mortar is left above the pipe and the tiles later crack, often exactly along the route. Filling without reinforcing mesh adds to the risk.

Uninsulated pipe

The pipe moves with temperature changes and breaks up the mortar. Over time cracks appear above the route.

A joint buried in the floor

If the manufacturer did not design the fitting to be buried, the joint can start to weep after some years and water appears under the floor or on the ceiling of the flat below.

Filling without a pressure test

A leak shows only after the system is refilled, and fixing it means breaking out the mortar and opening the floor again.

Route not checked

An electrical cable or water pipe is cut during chasing. The repair adds extra work and another tradesperson.

Crossing a movement joint without a sleeve

Movement between the floor sections stresses the pipe and cracks the mortar at the joint.

No photos or measurements of the route

A few years later nobody knows where the pipe runs, and drilling the floor, fitting furniture or replacing tiles risks puncturing it.

Cutting without dust control

Cutting concrete produces fine dust containing silica, which harms the lungs. Professionals therefore cut with extraction to a vacuum with a fine filter, or cut wet, and wear a respirator. Furniture and doors to other rooms should be covered with sheeting, otherwise dust spreads through the whole home.

How to sign off chased heating pipework

When signing off, focus mainly on what will be hidden once the chase is filled. It is a good idea to agree with the heating engineer that you will be present before the chase is filled.

  • the pipe is fully insulated along the chase and firmly fixed,
  • there is no unnecessary joint in the floor, and any joint is a fitting approved for burying,
  • the pressure test was carried out and the pressure did not drop,
  • where the pipe crosses a movement joint, it is sleeved,
  • you have photos of the route with measured distances from the walls,
  • the chase is filled flush, mesh is in place above it and the mortar is not cracked,
  • no cables or other services nearby are damaged,
  • after refilling and bleeding, the radiator heats evenly and the joints are dry,
  • the area is clean and the rubble has been removed.

Frequently asked questions

As a guide, €24.00 per running metre. The final price depends on screed hardness and thickness, the floor finish, the number of bends and crossings, and rubble removal. The pipe, radiator connection and retiling are usually charged separately.