Building work price list: Radiator Boxing In
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What radiator boxing in is and when it is worth doing
Boxing in hides a radiator behind a cover or a lightweight frame. The most common materials are plasterboard, timber, MDF and metal. The cover can be built into the wall or be a freestanding radiator cabinet that lifts off.
Homeowners usually choose it in these situations:
- During a renovation, when an old cast iron or steel radiator spoils the look of a room and replacing it is not yet planned,
- In homes with small children or pets, where hot metal can cause burns and sharp edges can cause injuries,
- When refitting an interior, where the radiator is meant to sit inside a stud wall, an alcove or built-in furniture, with the top acting as a shelf.
The same rule applies to every cover: the radiator must still heat the room and the valves must stay accessible. A cover that looks good but leaves the room cold has not been done properly.
What to decide before work starts
First, consider whether the radiator can still heat the room once it is covered. Every cover holds back some heat. With a well-ventilated cover that has openings at the bottom and the top, the loss of output is typically around 10 to 15 %. With a closed cabinet and only small slots, it is considerably higher. If the room is already hard to keep warm in winter without a cover, boxing in will make it worse. In that case, a higher-output radiator is worth considering first.
Before placing an order, decide on the following:
- Permanent or removable cover. Plasterboard is a permanent solution that blends into the wall. A timber, MDF or metal cabinet can be lifted off. If the radiator is likely to be replaced within a few years, a cabinet is the more practical choice.
- Replacing the radiator or valves. If the radiator or a valve needs changing, it makes sense to do it before boxing in. Radiator removal and installation behind finished plasterboard means taking the enclosure apart.
- The thermostatic radiator valve (TRV). Either it stays accessible through an opening in the cover, or a TRV head with a remote sensor is used. This must be decided before the cover is designed, because the cut-outs depend on it.
- Access for cleaning. Dust settles under any cover. A removable panel or an access door saves work later.
- Heat cost allocators in flats. In blocks with communal heating, radiators may carry heat cost allocators, and a covered radiator can affect the readings. Tell the managing agent or management company and ask how this is handled when heating costs are split.
- A larger renovation. A standard indoor radiator cover is not usually treated as building work. If it forms part of a larger renovation, check with your local building control what the whole project requires.
The pipes, valves and radiator are part of the heating system. Any work on them, such as moving a connection, changing a valve or draining the heating system, is a job for a heating engineer. In blocks of flats, the heating is often connected to shared pipework, so this kind of work must be agreed with the managing agent first.
How a radiator is boxed in, step by step
- Assessing the radiator: the type (panel, column, cast iron), dimensions, position and output are established from the label or documentation, or with a heating engineer.
- Measuring the space: height, width and depth of the radiator, distance from the window board, floor and side walls, and the position of the valves and pipework.
- Designing the cover: ventilation openings at the bottom and the top, an air gap around the radiator, access to the TRV and the lockshield valve, and a removable section for cleaning. As a rule, at least 3 to 5 cm is left between the radiator and the front panel, and a few centimetres at the sides and above.
- Choosing the material: depending on whether the cover is to be permanent or removable.
- Building the frame or fitting a ready-made cover: for plasterboard, metal studs are fixed to the wall and floor and the boards are screwed on. For a cabinet, the cover is stood in place or hung and fixed.
- Finishing: filling, jointing, sanding, painting or varnishing.
- Heating test: the radiator is switched on and the ventilation openings are enlarged if needed.
Why do openings at the bottom and the top matter? A radiator warms the air, the warm air rises and cooler air is drawn in from below. If a cover is open only at the front or only at the top, this natural flow is disrupted and the heat stays trapped inside. Openings running the full length of the radiator work best, rather than a few small slots.
Plasterboard, timber, MDF or metal radiator covers: which to choose
Plasterboard
This suits situations where the radiator should "disappear" into the wall, for example as part of a stud wall or an alcove. Boards are screwed to metal studs fixed to the wall and floor, then jointed and decorated together with the wall. It is a permanent solution. If the radiator is changed later, part of the enclosure has to be taken apart. For this reason, ventilation grilles and access panels are built into the plasterboard.
Timber
A timber radiator cabinet suits traditional interiors and can be matched to furniture or flooring. It usually stands on its own or is simply hung, so it is easy to remove. The top can serve as a shelf. Solid timber does, however, need enough ventilation openings and a finish that tolerates long-term heat.
MDF
MDF can be machined accurately and a decorative grille can be cut into it. It is easy to paint, lacquer or wrap. Choose a board and finish that the manufacturer recommends for use near heat, otherwise the cover may warp or yellow over time.
Metal
Perforated metal covers are strong, let heat through well and look modern. They are often made to measure, so allow for a longer wait between survey and fitting. Metal gets hotter than timber or MDF when the heating is on, which matters especially in a child's bedroom.
What affects the price
The guide price for the work is €65.00 per radiator. This means one cover for one radiator. The final figure may vary depending on the following:
- Radiator size: a long or tall radiator needs more material and more labour, so the price per piece is higher than for a standard radiator under a window.
- Number of radiators: several identical covers are quicker to make because they are measured, cut and finished together. The price per piece is then usually lower than for a single cover.
- Position: a cover under a window with a low window board, or in a corner, is harder to design and needs more shaping.
- Straightness of walls and floor: uneven walls require the frame to be packed out, and plasterboard needs packers and more careful fixing of the studs.
- Material and design complexity: a simple straight cabinet is the cheapest. Curves, cut-outs, decorative grilles and mouldings add labour and noticeably increase the price. Bespoke metal also involves workshop fabrication.
- Finish: varnishing or staining adds further steps. Plasterboard adds filling, jointing, sanding and painting.
- Position of valves and pipes: if they run awkwardly, the cover needs extra cut-outs and access openings.
- Service features: a removable front panel, an access door or ventilation grilles in plasterboard are separate items that add to the cost but save dismantling later.
When comparing quotes, check whether the price per piece includes materials, finishing and waste removal, or covers fitting only.
What makes the job easier and what slows it down
The job goes more smoothly if:
- the area around the radiator is cleared for at least one to two metres, curtains are taken down and furniture standing against the wall is moved,
- the colour and material are decided in advance and, for ready-made covers, delivered before the tradesperson arrives,
- the work is done outside the heating season, or with the radiator switched off and cool, because a hot radiator is hard to measure and fit around, and fresh filler or varnish cracks and dries too quickly in the heat,
- the radiator is vacuumed and washed before fitting, as this is much harder once it is covered,
- a plasterboard enclosure is planned before the room is decorated, so it can be jointed and painted together with the wall.
The job takes longer if:
- there is a wait for the cover to be delivered or decisions change during the work, meaning another visit,
- the room is in use and everything has to be protected from cutting and sanding dust,
- filler and paint need time to dry - plasterboard work is usually finished on the second day or later.
Common mistakes and how they show up later
- No ventilation. A cover without openings at the bottom and the top traps heat, the room warms up more slowly and the boiler runs longer. It only becomes obvious in the first cold days.
- TRV inside the cover. The TRV "senses" the warm air trapped under the cover and closes before the room has warmed up. The radiator feels warm, but the room is cold. An opening right next to the TRV, or a TRV head with a remote sensor that measures room temperature, solves this.
- Unsuitable material. Cheap boards, plastics or finishes not designed for heat deform or discolour. The cover warps, the lacquer yellows or it gives off a smell when the heating is on.
- Cover too close to the radiator. Without an air gap of at least a few centimetres, air cannot circulate. A cabinet that is too deep and closed creates a "pocket" of warm air that never reaches the room.
- No access to valves. A fault or bleeding the radiator then means breaking or dismantling the cover. If there is a leak, damage is greater because it takes longer to reach the valve.
- Plasterboard without a frame. Boards simply bonded to the wall, or poorly fixed studs, crack over time, especially at joints and around ventilation grilles.
- Cover touching the pipes. Pipes move slightly as they heat up. If the cover rests against them, it may crack, creak or the finish may be damaged.
How to check the finished work
- the cover is firmly fixed and does not move when pushed,
- there are ventilation openings at the bottom and the top, and nothing blocks them,
- the TRV and the lockshield valve can be reached without removing anything,
- the removable panel or access door opens easily,
- there is an air gap between the cover and the radiator,
- the cover does not touch the pipes or valves,
- the surface is smooth, with no cracks and no sharp edges,
- with plasterboard, no joints or screw heads are visible and the grilles are fitted straight,
- once the heating is on, the cover does not warp or smell,
- the room heats up much as it did before boxing in.
If the work is handed over outside the heating season, it is worth agreeing that any ventilation adjustments will be made after the heating is first switched on.
DIY guide: fitting a ready-made radiator cover
A ready-made timber, MDF or metal cover can be fitted without a tradesperson. A plasterboard enclosure around the radiator and any work on pipes or valves are better left to a professional. For a wider view of related jobs, see the overview of heating work.
- Switch off the heating or wait until the radiator has cooled down.
- Measure the width, height and depth of the radiator, including the valves and the TRV.
- Choose a cover that leaves at least 3 to 5 cm between the radiator and the front panel, and a few centimetres of free space at the sides and above. The cover must be ventilated at the bottom and the top.
- Check that the TRV can be reached through an opening or a removable section.
- Vacuum the dust from the radiator and beneath it while it is still easy to reach.
- Fit the cover according to the manufacturer's instructions and, for a wall-hung type, fix it with suitable wall plugs. Before drilling, check for hidden pipes or electrical cables.
- Make sure the cover stands firmly and does not touch the pipes or valves.
- Switch the heating on and check after a few hours that the room heats up as before.
If the radiators are being dealt with as part of a full floor renovation, some owners decide to remove them altogether in favour of underfloor heating - in that case the next step is screeding the underfloor heating pipes.
Frequently asked questions
The guide price is €65.00 per radiator. Material, radiator size and the complexity of the design affect the figure most - see the price section above for details. Several identical covers made at once usually lower the price per piece.
Yes, every cover holds back some heat. With well-designed ventilation at the bottom and the top and enough space around the radiator, the loss is usually 10 to 15 %. If the radiator is already working at its limit, a higher-output radiator is worth considering.
Yes, as long as the TRV is not enclosed in the warm air under the cover. An opening next to the TRV or a TRV head with a remote sensor is enough.
If the radiators have heat cost allocators, inform the managing agent or management company. A cover can affect the readings and how heating costs are shared.
Ideally before every heating season. Built-up dust restricts air flow and can smell when the heating is on, so a cover that is easy to lift off or open is worth having.
Plasterboard suits situations where the radiator should blend permanently into the wall. A timber or MDF cabinet is more practical if the radiator needs to be accessible at any time or is likely to be replaced later.
Yes, a cover prevents direct contact with hot metal and hides the radiator's sharp edges. Perforated metal does get very hot when the heating is on, so a cover with a timber or MDF front panel is better suited to a child's bedroom. The cover must be firmly fixed so a child cannot pull it over, and it must not have sharp corners.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
How a heating system is filled, what pressure to set, how to bleed radiators and what to check once the work is finished.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.