Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Heating works | ||||
| Concrete-in heating pipes in floor | lm | 6,50 € | - | |
| Remove & re-install radiator (complete) | pcs | 170,40 € | - | |
| Remove gas / electric boiler | pcs | 102,23 € | - | |
| Remove hot water cylinder | pcs | 109,25 € | - | |
| Install & connect panel radiator | pcs | - | ||
| Install bathroom towel radiator | pcs | 50,10 € | - | |
| Lay underfloor heating insulation board | m² | 3,50 € | - | |
| Underfloor heating pipe installation | m | 6,50 € | - | |
| Install underfloor heating manifold | pcs | - | ||
| Install gas condensing boiler | pcs | - | ||
| Install thermostatic radiator valve (TRV) & head | pcs | 19,04 € | - | |
| Earth / bond heating system | pcs | - | ||
| Replace thermostatic radiator valve (TRV) | pcs | 19,04 € | - | |
| Replace return valve | pcs | 19,04 € | - | |
| Install circulation pump | pcs | - | ||
| Pre-wire for smart thermostat connection | pcs | - | ||
| Install & connect low-loss header | pcs | - | ||
| Install expansion vessel | pcs | 54,12 € | - | |
| Install recirculation pipework | pcs | - | ||
| Install domestic hot water (DHW) / recirculation pump | pcs | - | ||
| Thread pipework | pcs | 10,02 € | - | |
| Flame weld metal pipework | pcs | 20,05 € | - | |
| Pressure test heating system | hr | 40,10 € | - | |
| Drain heating system | pcs | - | ||
| Fill, bleed & balance heating system | hr | 40,10 € | - | |
| Pipework for radiators | lm | 9,02 € | - | |
| Flush & clean existing heating system | hr | 45,10 € | - | |
| Pipe freezing | pcs | 34,08 € | - | |
| Cap off radiator | pcs | 65,15 € | - | |
| Fill heating system | pcs | - | ||
| Chase heating pipes in floor | lm | 24,06 € | - | |
| Install radiator bracket | pcs | 17,04 € | - | |
| Install radiator valves | pcs | 17,04 € | - | |
| Pressurise & bleed radiator | pcs | 14,03 € | - | |
How the pipes are screeded, step by step
Pouring the screed itself is quick. Most of the work is in the preparation. A careful installer usually works in this order:
- Checking the base. The structural slab has to be level, clean and dry. On ground-bearing floors or above an unheated space, a working damp-proof membrane is needed.
- Insulation. Floor-grade EPS goes under the pipes, XPS in damper areas, or system boards with studs. The insulation sends the heat up into the room instead of down into the ground.
- Edge strip. A compressible strip is fixed around all walls, columns and door frames. The screed can then expand freely as it warms up and does not crack.
- Laying the pipes. The pipes, usually PE-RT or PEX with an oxygen barrier, are laid in a spiral or a serpentine pattern at the spacing given in the design. They are held with clips or pressed into the studs of the boards so they do not float up during pouring.
- Pressure test. Before pouring, the circuits are pressurised and checked for leaks. The system stays under pressure during screeding, so any damage from a shovel or a hose shows up straight away.
- Pouring the screed. Sand and cement screed is spread, compacted and levelled with a straightedge. Liquid anhydrite screed is poured and levels itself. Screed is not vibrated like structural concrete; spreading and smoothing it thoroughly is enough.
- Movement joints. Larger areas, irregular rooms and doorways are divided by joints. A joint should separate heating circuits and should cross pipes no more often than necessary.
Why so many layers? Each one has a job: the insulation keeps the heat in, the edge strip allows movement and the screed stores and spreads the heat. If one is missing, the floor heats worse or gets damaged over time.
Cement or anhydrite screed: which to choose
Two main types of screed are used over underfloor heating. Both work well if you follow the manufacturer's instructions.
- Sand and cement screed copes well with moisture and suits bathrooms and ground floors. Under EN 1264 the cover above the pipe is usually at least around 45 mm. Fibres and an underfloor heating additive are mixed in. It dries more slowly.
- Anhydrite (calcium sulphate) screed is liquid, wraps closely around the pipes and conducts heat well. It can be thinner; the manufacturer sets the exact depth. It is sensitive to moisture, so wet rooms need careful waterproofing, and the surface is usually sanded before the floor covering goes down.
If your floor build-up has to stay low or you need a faster schedule, anhydrite is worth considering. For damp areas, or if you want a proven, robust solution, cement screed is the usual choice. The decision should follow the heating design and the type of final floor covering.
What makes the job easier or harder
The amount of work, and therefore the cost, depends mainly on the condition of the base and the access to the site.
- Easier: a new build with a level slab, large open areas and good access for a screed pump or mixer
- Harder: a renovation where the old floor has to come up down to the structural layer and the base needs levelling
- Many small rooms, recesses and thresholds mean more movement joints and more hand work
- Upper floors without a lift or narrow access make moving materials slower
- A deeper screed uses more material and takes longer to dry
In a flat, think about the weight of the new floor build-up and impact noise for the neighbours below. Speak to the building management or owners' association before work starts.
Typical mistakes and how to avoid them
- Pouring without a pressure test. A leaking joint under the screed means breaking up the floor.
- Missing edge strip, or trimming it too early. The screed then pushes against the walls and cracks.
- Pipes not fixed well enough. They float towards the surface and the cover above them ends up too thin.
- Too little cover. The floor heats in stripes and the screed above the pipes breaks easily.
- Drying too fast. Turning the heating up full straight after pouring, or summer draughts, cause cracks.
- Laying the floor covering on damp screed. Wooden floors cup and tile adhesive fails to bond.
Drying and the first heat-up
Once poured, the screed needs to be left alone. For the first few days, protect it from draughts, direct sunlight and frost. The heating goes on for the first time only after the period set by the screed manufacturer. For cement screed this is usually around three weeks; for anhydrite it is sooner, roughly after one week.
Then comes the commissioning heat-up: the water temperature is raised gradually, held for several days and then lowered slowly again. The process is recorded in a log. Full drying before the floor covering goes down takes much longer, with a thick cement screed even several weeks. The calendar does not decide when the floor is ready. A moisture measurement does, and the flooring fitter should take it before laying.
How to check the finished work
At handover, make sure you have:
- A pressure test record from before the screed was poured
- A pipe layout plan with dimensions, or photos taken before pouring
- An edge strip around the full perimeter of each room and movement joints as designed
- A level surface with no cracks, chips or hollow spots when tapped
- Details of the screed type, depth and pouring date
- A heat-up log with temperatures and dates
- A record of the moisture measurement before the floor covering is laid
Frequently asked questions
Pouring screed is heavy work, and mistakes can only be fixed by breaking the floor out. A heating engineer should handle the pressure test, the connection to the manifold and the commissioning heat-up. For the pour itself, an experienced crew is worth having.
It depends on the type and depth of the screed, the weather and ventilation. What counts is the moisture measurement after the heat-up. Wooden floors and vinyl are more sensitive to residual moisture than tiles.
If a pipe gets damaged during pouring, the pressure drops and the fault shows up before the screed sets. The pressure also helps the pipe keep its shape under the weight of the mix.
Replacing an indoor floor usually does not need a permit, but it depends on the scope of the work and on local building regulations. Check with your local building authority beforehand. In a flat, always agree the work with the building management or owners' association.
Fine hairline cracks after drying are common, and the flooring fitter usually stitches and fills them with resin before laying. Wider cracks or level differences should be shown to the contractor, as they can point to missing movement joints or heating up too fast.
Related work
Price the whole project, not just one job
In the building work price list you pick items from every trade, and NUMIQ turns them into a client-ready quote.