Building work price list: Screeding Underfloor Heating Pipes
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What screeding the pipes involves and when it is needed
The screed protects the laid pipes, spreads heat across the whole floor and gives a solid base for tiles, vinyl or timber flooring. It is needed for every "wet" underfloor heating system, whether in a new build, a renovation, a change of layout or when radiators are replaced. Taking radiators out usually starts with draining the heating system, followed by radiator removal. This layer decides whether the floor heats evenly and lasts for decades without cracking.
The screed over the pipes is not just filler. Heat from the water is first stored in it and then released slowly into the room. It must therefore be the right depth, fully surround the pipes and never bear against the walls. With dry systems, where the pipes sit in grooved boards without a screed, this work is not carried out.
What to decide before work starts
Most of the important decisions must be made before the pipes are laid. Once the screed is poured, nothing can be changed without breaking it out.
- Heating design: it sets the pipe spacing, the number of loops, the manifold position and the locations of movement joints. Without it, it is hard to check that the work has been done correctly.
- Type of screed: sand-cement or anhydrite (calcium sulphate). The choice depends on moisture in the room, the available build-up height and the final floor finish. The differences are covered in a separate section below.
- Total floor build-up: insulation, pipes, screed and floor finish must meet thresholds, doors and stairs at the right level. In renovations, height is often the biggest constraint.
- Final floor finish: tiles, vinyl and timber have different requirements for screed dryness and flatness. It helps to know the finish in advance so the build-up and drying time can be planned around it.
- Work in a block of flats: consider the weight of the new build-up and impact noise to neighbours. Speak to the managing agent or freeholder before starting. Any work affecting the structural slab or shared services is a job for a specialist and needs consent.
- Who does what: the pipes, manifold and pressure test are usually done by the heating engineer, while the screed may be laid by a different contractor. Agree in advance who is responsible for keeping the system under pressure during the pour and who carries out the commissioning heat-up. If some rooms keep their radiators, radiator boxing in can be planned at the same time.
How the pipes are screeded step by step
The pour itself is quick. Most of the work lies in the preparation. Done properly, the steps follow in this order:
- Checking the substrate. The structural slab must be level, clean and dry. On ground-bearing floors or above unheated spaces, a working damp-proof membrane is required.
- Thermal insulation. Floor-grade EPS is laid under the pipes, XPS in damper areas, or a castellated system panel. The insulation sends heat up into the room rather than down into the ground.
- Perimeter edge strip. It is fixed around all walls, columns and door frames. This lets the screed expand freely when heated without cracking.
- Laying the pipes. The pipes, usually PE-RT or PEX with an oxygen barrier, are laid in a spiral or serpentine pattern at the spacing set in the design. They are held with clips or in the panel bosses so they do not float up during the pour.
- Pressure test. Before screeding, the loops are pressurised and checked for leaks. Wet underfloor heating should be installed and pressure-tested to BS EN 1264-4 before the screed is laid. The system should stay under pressure during the pour, so any damage from a shovel or hose shows up straight away.
- Laying the screed. Sand-cement screed is spread, compacted and ruled off level with a straightedge. Liquid anhydrite screed is poured and self-levels. Screed is not vibrated like structural concrete, it only needs to be spread thoroughly and finished smooth.
- Movement joints. Large areas, irregular rooms and doorways are divided by joints. For sand-cement screed, common practice is bays of up to about 40 m², with the longer side no more than about 8 m and a side ratio no greater than 2 : 1. L-shaped rooms are split at the corner. Anhydrite allows larger bays, with exact limits given by the manufacturer. Joints should separate the individual heating loops and should not cross them more often than necessary.
- Curing and drying. Fresh screed is protected from draughts, direct sun and frost. The heating is switched on only after the time stated by the screed manufacturer, followed by a recorded commissioning heat-up.
Why so many layers? Each one has a job: the insulation holds the heat, the edge strip allows movement and the screed stores and spreads the heat. If one is missing, the floor heats less well or deteriorates over time.
Sand-cement or anhydrite screed: which to choose
Two main types of screed are used over underfloor heating. Both perform well if the manufacturer's method is followed.
- Sand-cement screed tolerates moisture and suits bathrooms and ground floors. Under the applicable standards the cover over the pipe is usually at least around 45 mm. Fibres and an underfloor heating additive are added to the mix. It dries more slowly.
- Anhydrite (calcium sulphate) screed is liquid, surrounds the pipes very well and conducts heat effectively. It can be thinner, with the exact depth set by the manufacturer. It is sensitive to moisture, so wet rooms need thorough tanking, and the surface is usually sanded before the floor finish is laid.
If the floor build-up is shallow or a faster programme is needed, anhydrite is worth considering. For damp areas, or where a proven and robust solution is preferred, sand-cement screed is the better fit. The decision should follow the heating design and the type of final floor finish.
What affects the price
The indicative labour rate in the price list is €6.50 per running metre. A running metre here means one metre of laid pipe, not a square metre of floor. Contractors often quote screed per m², so convert the figures when comparing quotes. The metres of pipe per 1 m² of floor depend on the spacing in the design: at 100 mm centres it is roughly 10 m, at 150 mm roughly 6 to 7 m and at 200 mm roughly 5 m. The exact loop lengths are in the heating design or can be supplied by the heating engineer. The final cost depends mainly on:
- Condition of the substrate: a new build with a level slab is straightforward. A renovation is more demanding, as the old floor must be broken out down to the structural layer and the base levelled. In homes built before 2000, have suspect materials tested before you drill or demolish, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. Breaking out and levelling are often priced separately and can cost more than the screeding itself. Before the rubble is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Screed depth and type: a deeper screed uses more material and takes longer to dry. Anhydrite is usually dearer as a material, but it can be thinner and is quick to pour.
- Room layout: large open areas are the cheapest. Many small rooms, recesses and thresholds mean more movement joints and hand work, which noticeably increases the price.
- Access and delivery: with good access for a pump or mixer, the work goes quickly. Upper floors without a lift or tight access make moving material harder and more expensive.
- Size of the job: on a small area, such as a single bathroom, the rate per metre is higher because preparation and delivery are spread over fewer metres.
- Additional items: insulation, edge strip, additives, fibres, curing and sanding of anhydrite may or may not be included. Ask about this when getting a quote.
What makes the work easier and what delays it
The screed crew needs the whole area at once, and the pour must not be interrupted. It helps when the client has ready:
- windows and external doors fitted, so the space can be closed against draughts and frost,
- plastering and other wet trades on the walls finished, so no scaffold towers are needed on the screed afterwards,
- water and electricity on site for the mixer or pump,
- clear access from the vehicle to the pour area and agreed parking for the truck mixer,
- rooms cleared of materials and tools from other trades,
- a room temperature above freezing, generally at least around 5 °C, including for several days after the pour.
The work is delayed if the pipes are not finished or tested, if there is no design showing the joints, or if other trades walk on the screed earlier than the manufacturer allows. Fresh screed can usually take careful foot traffic only after a few days, with the exact time given by the manufacturer.
Drying and the first heat-up
After the pour, the screed needs to be left alone. For the first few days it should be protected from draughts, direct sunlight and frost. The heating is first switched on only after the time set by the screed manufacturer. For sand-cement screed this is usually around three weeks, for anhydrite sooner, roughly after a week.
This is followed by the commissioning heat-up: the water temperature is raised gradually, held for several days and then slowly reduced again. The process is recorded on a log sheet. Full drying before the floor finish is laid takes much longer, several weeks for a deep sand-cement screed. Readiness is decided not by the calendar but by a moisture test, which the flooring contractor should carry out before laying.
Ventilation during drying should be short and thorough, not a constant draught through windows left ajar. In a closed space, a dehumidifier can help by removing moisture from the air. Fans and hot-air dryers should not blow directly onto fresh screed, as the surface would dry faster than the base and crack.
Typical mistakes and how they show up later
Screeding without a pressure test
A leaking joint under the screed only shows once the heating runs, as a pressure drop in the system or a damp patch on the floor. Repair means breaking out the floor.
Missing edge strip or strip trimmed too early
The screed then bears against the walls and cracks, often along the walls or in corners.
Pipes not fixed down properly
They float towards the surface, leaving too thin a layer above them. The screed later breaks there, and drilling for fixings risks hitting a pipe.
Cover too thin
The floor heats in stripes and the screed above the pipes is easily damaged.
Drying too fast
Turning the heating up to full straight after the pour, or draughts in summer, cause cracks that later telegraph through to the tiles.
Floor finish laid on damp screed
Timber floors cup, tile adhesive fails to bond and tiles come loose over time and sound hollow when tapped.
Movement joints across loops or bays too large
A joint crossing pipes without a protective sleeve stresses the pipe every time the screed moves. If a bay without a joint is too large or too elongated, the screed "finds" its own crack. A joint in the screed must also continue through the tiling, otherwise the tiles crack right above it.
No record of pipe positions
Without a plan or photos, it is not safe to drill into the floor later, for example when fixing door stops, balustrades or furniture.
How to check the finished work
At handover, check that the following are in place:
- a pressure test record from before the pour,
- a pipe layout plan with dimensions or photos taken before screeding,
- edge strip around the full perimeter of the rooms and movement joints as per the design,
- a level surface with no cracks, damaged areas or hollow spots when tapped,
- details of the screed type and depth and the date of the pour,
- a commissioning heat-up log with temperatures and dates,
- a record of the moisture test before the floor finish is laid.
Flatness can be checked with a 2 m straightedge laid on the floor in different directions. It is best to specify the screed flatness class in the contract: under BS 8204, SR1 allows a gap of no more than 3 mm under a 2 m straightedge, SR2 5 mm and SR3 10 mm. The edge strip above the screed is trimmed only after the floor finish is laid, not before.
For more on related jobs, see the overview of heating work.
Frequently asked questions
The price list gives an indicative rate of €6.50 per running metre, meaning per metre of laid pipe. Depending on spacing, 1 m² of floor usually has 5 to 10 m of pipe. The actual cost depends on the screed type and depth, the substrate, the room layout, site access and whether insulation, edge strip and curing are included.
Laying screed is physically demanding and mistakes can only be put right by breaking it out. The pressure test, manifold connection and commissioning heat-up should be done by a heating engineer. For the pour itself, an experienced screed crew is worth having.
It depends on the screed type and depth, the weather and ventilation. The deciding factor is the moisture test after the commissioning heat-up. Timber floors and vinyl are more sensitive to residual moisture than tiles.
If a pipe is damaged during screeding, the pressure gauge drops and the fault is found before the screed sets. It is easy to repair at that stage, whereas after setting the floor would have to be broken out.
Replacing an internal floor usually needs no formal approval, but this depends on the scope of the work. Check with the local authority in advance if the work goes beyond a like-for-like floor replacement. In a flat, always agree the work with the managing agent or freeholder first.
Fine hairline cracks after drying are common, and the flooring contractor stitches and fills them with resin before laying the finish. Wider cracks or level differences should be shown to the contractor, as they may point to missing movement joints or heating up too quickly.
Only with care and using the pipe layout plan or photos taken before the pour. Without them, there is a risk of drilling through a pipe. If in doubt, the pipe positions can be found with a thermal imaging camera while the heating is running.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
How a heating system is filled, what pressure to set, how to bleed radiators and what to check once the work is finished.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.