Building work price list: Electrical Installation Condition Report (Flat)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Inspections cost | ||||
| Electrical Installation Certificate / EICR (flat) | pcs | €190.00 / pcs | pcs | enter quantity- |
| External LV connection inspection report | pcs | pcs | - | |
What an EICR is and who may carry it out
An EICR is the formal record of a periodic inspection and test of an electrical installation. The electrician inspects the installation visually and tests it with specialist instruments. They then assess whether it meets the current IET Wiring Regulations, BS 7671:2018+A4:2026. The report describes the installation, records the test results and lists any defects. It ends with a clear overall outcome of satisfactory or unsatisfactory. Defects are usually given codes: C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended) and FI (further investigation needed).
There are two kinds of inspection and testing, and each has its own paperwork. For the wider picture, see the overview of electrical installation work.
- initial verification is carried out before a new or altered installation is put into use, for example after a new build, a rewire or a major change to the circuits. The result is an Electrical Installation Certificate, or a Minor Works Certificate for small jobs,
- periodic inspection is repeated at intervals and checks whether the installation has deteriorated since it was last tested. The result is the EICR.
An EICR should only be carried out by a qualified and competent electrician with experience of inspection and testing. Not every electrician who installs sockets and lighting is experienced in periodic inspection. Many inspectors are registered with a competent person scheme. Ask to see proof of their qualifications and registration. Note their name and registration number. If in doubt, check their details on the scheme's public register.
When and how often a flat needs an EICR
For owner-occupied flats there is no fixed legal interval for periodic inspection. In practice an inspection is needed in these situations:
- after electrical work, even partial, such as replacing the consumer unit, adding circuits or rewiring the kitchen and bathroom. New work is certified by the installer, and a full condition report is useful when only part of an older installation has been changed. In England and Wales a new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start,
- on completion of a new build or a change of use. Always check with building control which electrical documents they require,
- when buying or selling a flat. It is not normally a legal requirement for a sale. It does, however, tell a buyer a great deal about the wiring, especially in older blocks with original cabling and fuse boxes,
- after a fault, short circuit or fire, to find the cause and confirm that the rest of the installation is sound,
- when letting a flat. In England, private landlords must have the installation inspected and tested at intervals of no more than 5 years, or sooner if the most recent report says so. In Northern Ireland, landlords must also have it inspected and tested by a qualified person at least every 5 years. Check the current rules for Scotland and Wales,
- when an insurer, freeholder or managing agent asks for it.
For owner-occupied homes, Electrical Safety First recommends an EICR at least every 10 years. For older wiring, after DIY alterations or where the installation is clearly in poor condition, electricians usually advise a shorter interval of around five years. Old rubber-insulated cables become brittle, and loose connections can overheat. If there are young children or elderly people in the home, a check is all the more worthwhile.
Be clear about who is responsible for what. The owner or leaseholder is responsible for the installation inside the flat. The freeholder or managing agent is responsible for risers, corridors, communal lighting and other shared areas. The boundary is not always obvious. In many blocks the meter sits in a communal cupboard and the cable to the flat's consumer unit runs through shared areas. Check your lease or ask the managing agent where your part ends. Do not alter communal parts without their consent. Where the cut-out or meter is concerned, the network operator may also set its own conditions - the supply side is covered by an inspection report for the external LV electrical connection.
What to agree before booking the inspection
When booking, tell the electrician exactly what you expect. Agree these points in particular:
- what the report is for: after a rewire the installer issues a certificate for the new work, while an older flat needs a periodic inspection and an EICR,
- the extent of the inspection: the flat only, or also a storage cupboard, garage or other space supplied from your consumer unit. Any agreed limitations should be written in the report,
- timing: after electrical work, testing belongs at the end, once all the electrician's work is finished. It should also happen before the installation is put into full use,
- what happens next: whether the electrician will propose remedial work for any defects found and on what terms they will return to retest.
How an EICR in a flat is carried out
In a typical flat the inspection takes one to three hours. A larger flat or a more complex installation, such as electric underfloor heating, can take longer. The usual sequence is:
- Documents: the electrician reviews any available paperwork, such as drawings, the circuit chart or a previous certificate or report.
- Visual inspection: they check the consumer unit, the circuit labelling, and the condition of sockets, switches and visible cables. They also check that accessories suit their location, for example in the bathroom.
- Protective conductors: they test continuity, meaning that the earth reaches every socket and every item of equipment that needs it.
- Insulation resistance: this test shows whether cable insulation is damaged or has deteriorated with age.
- Earth fault loop impedance: this confirms that the protective device will disconnect quickly enough in the event of a fault.
- RCD: they test whether the residual current device trips at the correct leakage current and within the correct time.
- Assessment: the results are assessed against the current wiring regulations and the report is written up.
- Handover: the report is handed over in writing and the electrician explains the outcome and any defects.
The power will not be off the whole time. For some tests, such as insulation resistance, the circuits are isolated. Loop impedance and RCD tests are done live. During the RCD test the device trips, so the circuits it protects lose power for a moment. Bear this in mind for the fridge, computer or aquarium.
The cost of an EICR for a flat and what affects it
The guide labour price is €190.00 per report. This covers the inspection of one typical flat. The final figure depends mainly on the number of tests and how easily the electrician can trace the installation:
- size of the flat and number of circuits: more circuits, sockets and RCDs mean more tests. A studio is quicker than a large flat with several consumer units, such as one wired as described for electrical installation in a two-bedroom flat,
- age and condition of the wiring: with old cabling and confusing alterations, the electrician has to trace the circuits. The inspection then takes noticeably longer and the price may be higher,
- bathrooms and outdoor areas: the bathroom and balcony have stricter requirements and are checked more thoroughly,
- more complex equipment: electric underfloor heating, an electric cooker or other fixed appliances on dedicated circuits add tests,
- type of inspection: testing after a full rewire tends to be more detailed, because the whole new installation is assessed,
- defects found: the inspection itself does not fix anything. Remedial work is a separate job for an electrician, and a retest afterwards is usually an extra item,
- timing and travel: an urgent appointment, a weekend visit or a remote location can increase the price.
When comparing quotes, ask whether the price includes the written report, a retest after repairs and travel.
How to prepare for the inspection
Before the electrician arrives, it helps to:
- have the paperwork ready: with a circuit chart and a previous report, the electrician does not have to work out which circuit serves which room,
- clear access to the consumer unit: a consumer unit hidden behind a wardrobe or boxed in slows the work down,
- make every room and socket accessible: sockets behind heavy furniture or a locked cupboard add time,
- unplug appliances: unplug the television, computer, chargers and extension leads. Otherwise they could distort the insulation resistance results or be damaged,
- be ready for short power cuts: save any work on your computer and avoid opening the fridge or freezer during testing,
- mention any DIY alterations: the electrician then knows where to look and does not have to trace the wiring blind.
The most common defects in older flats
The same defects come up again and again. Knowing about them in advance means the outcome will not come as a surprise:
- no RCD protection: older flats often have none. Yet an RCD is exactly what cuts the power within a fraction of a second if someone gets a shock,
- old wiring in poor condition: loose or overheated connections and perished insulation, which can start a fire,
- unprofessional DIY alterations: a replaced socket with no earth, a light connected "their own way", a wrongly rated circuit breaker or fuse,
- cheap substandard products: sockets and extension leads that overheat under load,
- no labelling in the consumer unit, so nobody knows what to switch off when there is a fault.
If the electrician finds a serious defect, the overall outcome will be unsatisfactory. Where there is immediate danger, they may also recommend that part of the installation is not used until it is repaired.
Only a qualified electrician should work on the installation. Do not carry out repairs to the defects yourself. Even replacing a socket or a circuit breaker is a job for a competent professional. If the defects point to a full rewire, see electrical rewiring in a one-room flat: first and second fix.
Mistakes with an EICR and how they show up later
A report from someone without the right qualifications
The document may look professional, but without a competent, qualified inspector behind it, it carries little weight. This becomes clear on a sale, at building control sign-off or after an insurance claim, when someone refuses to accept it.
A report without test results
If it only says "satisfactory" in general terms, there is no way of checking what was actually tested. Neither a buyer nor an insurer can learn anything from it. At the next inspection there is nothing to compare against.
Testing before the work is finished
If the electrician connects or changes anything after testing, the paperwork no longer matches the installation. When a problem arises, it is worthless.
Putting off serious defects
Overheated connections or a missing earth may go unnoticed for years. Then they show up as a short circuit, an electric shock or a fire.
How to check the report on handover
You will receive the report in writing. Keep it with the other documents for the flat and pass it on to the new owner when you sell. Before accepting it, check that it includes:
- the address and precise identification of the flat,
- the purpose of the report and whether it is an initial verification or a periodic inspection,
- the inspector's name, registration details and signature,
- the date of the inspection and the recommended date of the next one,
- a description of the installation, including the cable types, number of circuits, protective devices and RCDs,
- test results for each circuit,
- the RCD test results, if an RCD is fitted,
- a list of defects with their location, classification code and recommended remedy,
- a clear overall outcome of whether the installation is safe for continued use,
- an extent of inspection that matches what you ordered, for example whether it covers your storage cupboard.
If anything in the report is unclear, ask the electrician to explain it at handover. For any defects, ask which need dealing with straight away and which are less urgent.
Frequently asked questions
The guide price is €190.00 per report. The final price depends mainly on the number of circuits, the age and condition of the wiring and the equipment in the flat, such as electric underfloor heating. Allow also for a retest after any repairs.
For a normal sale it is not usually a legal requirement. A buyer may ask for one, though, and for them it is valuable evidence of the condition of the wiring. If you are selling an older flat, an up-to-date report makes negotiations easier.
For owner-occupied flats there is no fixed validity period. The electrician normally states a recommended date for the next inspection in the report. A report loses its value mainly when the installation has been altered since or when it is very old. For rented homes, follow the current rules for the part of the UK where the flat is.
Only if they are also qualified and competent in inspection and testing. Many people still choose an independent electrician for the EICR, so that the check is not done by the same person who did the work.
An electrician repairs the defects listed in the report. After the repairs, the installation is retested and the paperwork is updated to show a satisfactory outcome. Without this, the unsatisfactory report remains on file. Serious defects should be dealt with without delay.
That depends on your policy. After a fire or damage caused by electricity, the insurer may ask about the condition of the installation. An up-to-date report helps show that the electrics have been properly maintained. The exact terms are set out in your policy wording.
Related work
When you need an inspection report for an external low-voltage connection, how the testing works, what the report must contain and what to check.
Price list for electrical installation work in 2026: cabling, sockets, switches, lighting and fuse boards. What affects the cost and a quick estimate in NUMIQ.
How a full rewire of a one-room flat or studio works, from chasing to sockets, what to prepare, what to watch for and what to check at handover.
How a full rewire of a two-bedroom flat works, from chasing walls to final testing, what to decide beforehand and how to check the finished job.
How a rewire of a 4-room flat works, what to decide before the electricians arrive, how to plan circuits and the consumer unit, and how to sign it off.
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.