Building work price list: Inspection Report for External LV Electrical Connection (Flat)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Inspections cost | ||||
| External LV connection inspection report | pcs | €250.00 / pcs | pcs | enter quantity- |
| Electrical Installation Certificate / EICR (flat) | pcs | pcs | - | |
What an LV connection inspection report is and who deals with it in a block of flats
An inspection report for the external LV connection is a document. In it, a qualified electrical inspector confirms that the electricity supply into the building has been installed correctly and safely. LV means low voltage, the normal voltage supplied from the distribution network. The report contains the results of the inspection and the test readings. A signature alone is not enough.
In everyday speech, "the supply" means the whole cable from the cabinet at the boundary to the main distribution board in the building. Technically, two parts are distinguished:
- the service connection in the narrow sense is the section from the network up to the cut-out or service cabinet. This is normally owned, maintained and checked by the distribution network operator (DNO),
- the consumer's installation starts after the cut-out. It includes the meter cabinets and the main building supply cable up to the main distribution board in the building. The owner is responsible for this part, and it is this part that the inspection report in this article covers.
In a block of flats, the incoming supply and the main building cabling are communal parts of the building. The inspection and any repairs are therefore ordered by the managing agent, freeholder or residents' management company and paid for from the service charge. An individual flat owner does not order this inspection. Without the agreement of the other owners and without a qualified professional, a flat owner must not interfere with these parts. Flat owners usually come across the report when:
- they ask the DNO for a higher supply capacity for their flat, and the DNO wants to know whether the building cabling can cope,
- they are buying a flat and want to know the condition of the building's electricity supply,
- the owners are voting on replacing the incoming supply or the meter cabinets,
- they own a flat in a small building without a managing agent, where the owners look after the supply together.
In such cases it is enough to ask the managing agent for a copy of the latest report. If it is old or missing, a proposal for a new inspection should go on the agenda of the owners' meeting.
When the connection needs inspecting and what the owners should decide in advance
The DNO and the authorities commonly require an inspection in these situations:
- a new connection: a new block of flats or a new house where a new supply point is created. Building control usually wants to see the certificate before the building is signed off,
- replacing or rerouting the supply: a new cable, a different route, new meter cabinets,
- repair after damage: for example when an excavator has cut the cable during groundworks. Joining it is not enough, the repair has to be verified by testing,
- increasing the main fuse rating or another change where the DNO wants up-to-date evidence of the condition,
- older buildings where the occupier changes and no demonstrably current record is available.
Several DNOs cover different regions of the UK. Each has its own technical connection requirements. They specify, for example, the type and position of the cabinet and the point where the network ends and the owner's installation begins. The managing agent or designer should know these requirements before the supply is replaced. For a new building, check directly with building control what is needed for sign-off. In England and Wales, a new circuit or a consumer unit replacement is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
When the supply in a building is being replaced, the owners should settle the following in advance:
- when to contact the inspector: ideally before the work starts. The inspector will say what needs to be seen and recorded,
- who photographs the trench: the cable in the trench, the sand bedding, the warning tape and the ducts can only be recorded before backfilling. Often nobody takes photographs and the cable is already buried. The inspector then cannot verify how it was laid and may ask for a trial hole or a written declaration from the installer,
- what main fuse rating the building needs: the cable size is chosen according to it. Increasing the rating later can mean a new cable and a new inspection. The managing agent should therefore find out the plans of individual owners, such as electric water heating or electric vehicle charging, before the replacement.
How the inspection is carried out step by step
The inspector reviews the documents, checks the installation and measures the electrical values with calibrated instruments. The usual procedure is:
- Request the documents: the design or a sketch of the supply, data on the cable and devices, photographs of the trench before backfilling, and any earlier reports.
- Walk the route from the cut-out or meter cabinet to the main distribution board in the building. Check that the boards match the documents, are closed and labelled, and have an ingress protection rating suitable for outdoor use.
- Verify that the cable is suitable for direct burial, for example armoured cable, and correctly sized for the main fuse. Check ducts, wall entries and sealing wherever they are visible.
- Measure the insulation resistance of the conductors to confirm that the insulation is not damaged or damp.
- Verify the continuity of the protective conductors and the correct separation of the combined neutral and earth (PEN) into separate earth and neutral at the point set out in the design.
- Measure the earth fault loop impedance. This shows whether the protective device will disconnect quickly enough in the event of a fault.
- Measure the earth electrode resistance. If the board contains RCDs, test their operation as well.
- Prepare the report with the results, the conclusion and any defects, and hand it over signed.
External cabling is exposed to damp, frost and mechanical damage. The inspector therefore also looks at things that matter less inside a building: the sand bedding under the cable, the warning tape above it, the ducts under paths and driveways, and the sealed cable entry into the building.
What the inspection report should contain
A valid report follows BS 7671:2018+A4:2026, the current IET Wiring Regulations, which set the requirements for inspection and testing and for protection against electric shock. The report should contain:
- identification of the building, the supply point and the type of inspection (for a new supply this is an initial verification),
- a description of the cabling: cable type and size, route length, installation method, the boards and the main fuse rating,
- the earthing arrangement and the method of protection against electric shock,
- the measured values and the test instruments used,
- the defects found and recommendations for putting them right,
- a clear conclusion on whether the installation is safe to be put into service,
- the inspector's name, registration or qualification details, the scope of competence, the date, the report number, a signature and a stamp.
With an unsatisfactory conclusion, the DNO will not energise the supply point. After the repair, the inspection has to be repeated.
What the price of the connection inspection report depends on
The guide labour price is €250.00 per piece, where one piece means one report for one supply. The final amount depends mainly on what the inspector finds on site:
- age and condition of the cabling: a new supply with a design is the simplest case. In an old building with an unknown cable, more investigation and testing is needed and the price is usually noticeably higher,
- documentation: when both the design and the trench photographs are missing, the inspector has to trace the information or ask for a trial hole. This makes the job longer and more expensive,
- length and clarity of the route: a short route with one cabinet is cheaper than a long route with several entries and crossings,
- number of boards and devices: a block of flats usually has more meter cabinets and protective devices than a house. Every additional board, RCD or earth electrode adds work,
- earthing: an earth electrode that is hard to reach or corroded terminals mean more time on site,
- urgent deadline: inspectors usually charge extra for a fast turnaround,
- repeat inspection: if the inspector finds defects, there is a repair and another check, which is paid for separately.
When comparing quotes, the managing agent can ask whether the price includes travel, preparing the report and a recheck after minor defects have been put right.
How the managing agent and owners can speed up the inspection
- book the inspector several weeks in advance, not just before the connection is due,
- on the day, provide access to all cabinets and boards, including keys to the basement, the intake room or the cabinet on the façade,
- notify residents at least a few days ahead with a notice in the entrance that the electricity will be off for a short time,
- appoint one person for the managing agent or management company to be on site and receive the report,
- have the installer available by phone in case the inspector needs something explained.
Typical faults that cause a connection to fail
Poor or missing earthing. The earth electrode is not connected, the joints are corroded or the earth resistance is too high. Shock protection then does not work as it should, and in a fault, dangerous voltage can appear on metal parts.
Undersized cable. The cable size does not match the main fuse or the route length. The cable can overheat and the loop impedance comes out too high. This often only shows up when a higher supply capacity is requested and the cable has to be replaced with fresh digging.
Unsuitable cable or laying. The cable is not suitable for burial, or the sand bedding, warning tape or duct under the driveway is missing. Over the years damp or pressure from stones damages the insulation, and during later excavations nobody knows the cable is there.
Poor joints. A cable connected to an old board without a protective device, temporary connectors, or a repair joint not designed for burial. Water gets into such a joint and in time there are outages or insulation failure.
Missing documentation. For sign-off or a DNO application, the developer brings only a statement that an electrician did the work. That is not enough and the connection is delayed.
An informal opinion from an electrician who is not qualified to inspect and certify has no value for the DNO or building control. The inspector is personally responsible for the accuracy of the report. Repairs to the supply may only be carried out by a qualified electrician, never as DIY.
How to check the report handed over
Before attaching the report to a connection application or submitting it for sign-off, or before the managing agent files it with the building records, compare it with the actual situation:
- the address and supply point belong to your building, not to another property,
- the number and location of the boards in the report match what is in the building,
- the main fuse rating in the report is the same as the one actually fitted and stated in the agreement with the supplier or DNO,
- the test results show actual figures, not just a general statement of "satisfactory",
- the conclusion clearly states that the installation is safe to use,
- if the report lists defects, you have written confirmation that they have been put right,
- the inspector is competent for low voltage installations up to 1000 V,
- the report states the date of the next periodic inspection,
- the report is kept in paper and electronic form together with photographs of the route.
For an overview of related jobs, see the section on electrical installation work.
Frequently asked questions
No. The incoming supply and the main building cabling are communal parts of the building, so the inspection is arranged by the managing agent or the residents' management company. The flat owner only deals with the Electrical Installation Condition Report for the flat. Any change that affects the supply or the building's main fuse must be discussed with the managing agent.
The guide price is €250.00 per piece. The final price depends mainly on the age of the cabling, the available documentation, the route length, the number of boards and the turnaround time.
Yes, if they are qualified to inspect and certify within the required scope. Their report has the same validity. Many managing agents nevertheless choose an independent inspector so that the work is checked by someone other than the installer.
Testing a typical supply usually takes a few hours, longer in a block of flats with several boards. Depending on workload, the inspector usually prepares the report within a few days. Book the inspector as soon as the work is finished, not a week before sign-off or connection.
The inspector describes them in the report together with recommended remedies. A qualified electrician carries out the repair, followed by a repeat check with a new or supplementary report. Only with a satisfactory conclusion will the DNO energise the supply point.
Yes, electrical installations are inspected periodically. Electrical Safety First recommends an EICR at least every 10 years for an owner-occupied home, and landlords must have one done at least every 5 years. The interval depends on the environment the installation is in. Outdoors and in damp conditions it is usually shorter than in dry indoor areas. The inspector states the date of the next inspection in the report, and in a block of flats the managing agent or management company keeps track of it. A new inspection is also needed after any work on the supply, such as a repair, cable replacement or change of main fuse.
No. The connection inspection covers the section up to the building's main distribution board. The wiring in the flat, sockets and lighting circuits have their own certification, which the flat owner arranges, for example after rewiring a one-room flat with first and second fix or a first and second fix electrical installation in a two-bedroom flat. Building control usually requires this certificate as well.
Related work
When you need an electrical condition report for your flat, who may issue it, what is tested and how to check the finished report.
Price list for electrical installation work in 2026: cabling, sockets, switches, lighting and fuse boards. What affects the cost and a quick estimate in NUMIQ.
How a full rewire of a one-room flat or studio works, from chasing to sockets, what to prepare, what to watch for and what to check at handover.
How a full rewire of a two-bedroom flat works, from chasing walls to final testing, what to decide beforehand and how to check the finished job.
How a rewire of a 4-room flat works, what to decide before the electricians arrive, how to plan circuits and the consumer unit, and how to sign it off.
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.