Price list 2026 · Europe

Bitumen membrane for foundations

A bitumen membrane on the foundations protects the masonry from damp that would otherwise rise from the ground into the walls. The job is done in two stages. First a bitumen primer is applied to the concrete. Once it has dried, a torch-on bitumen waterproofing membrane is melted onto the surface with a flame.

Updated 11/2026·10 min read·23 price list items
Standard labour price
€2.80/ m²
Indicative range
€2.80 - €3.50
60 m² flat
€420.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Bitumen membrane for foundations

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Concrete works23 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Concrete works cost

Bituminous primer coatm²€3.50 / m²m²enter quantity-
Laying bitumen felt damp-proof membrane (DPM)m²€2.80 / m²m²enter quantity-
Pouring strip foundations into trenchm³€40.00 / m³m³enter quantity-
Laying and levelling blinding concretem²€8.00 / m²m²enter quantity-
Pouring slab foundations, 100 mm thickm²m²-
Pouring slab foundations, 150 mm thickm²m²-
Pouring slab foundations, 200 mm thickm²m²-
Formwork for foundations and wallsm²€18.00 / m²m²enter quantity-
Shuttering for floor slab (Doka/Peri system)m²m²-
Striking floor slab formworkm²€5.80 / m²m²enter quantity-
Tying reinforcement barst€350.00 / ttenter quantity-
Laying and tying mesh reinforcement 100×100m²€2.70 / m²m²enter quantity-
Laying and tying mesh reinforcement 150×150m²€3.00 / m²m²enter quantity-
Pouring concrete stairs including formworkm³m³-
Erecting stair formworklmlm-
Dismantling stair formworklm€12.00 / lmlmenter quantity-
Hand-laid floor screed up to 7 cmm²€9.00 / m²m²enter quantity-
Machine-applied screeds - cementitiousm²€10.50 / m²m²enter quantity-
Machine-applied screeds - anhydrite self-levellingm²€11.80 / m²m²enter quantity-
Installation of ceramic beam and block floorm²€20.00 / m²m²enter quantity-
Cutting expansion jointslm€5.00 / lmlmenter quantity-
Power floating concrete floorm²€4.50 / m²m²enter quantity-
Pumping concrete mixm³m³-
Total labour
- enter quantity
Create quote from price list →

Why and when foundations are waterproofed

Foundation concrete is absorbent and the ground beneath a house is always at least slightly damp. Without a continuous membrane, moisture would travel from the foundation into the first course of masonry and from there further up the walls. The result is damp plinths, crumbling plaster and mould at floor level. A bitumen membrane creates a layer between the foundation and the building that water cannot pass through.

On a new build, the membrane is laid in the following situations:

  • on a foundation slab over the whole area, under the masonry and under the future floor,
  • on strip foundations and blinding concrete, when the house stands on strips and the floor is built later,
  • under the first course of masonry as a horizontal damp-proof course, which is later joined to the floor membrane,
  • in a basement, where the horizontal membrane under the slab is joined to the vertical waterproofing of the external walls.

For what a correct substrate looks like, see the articles on pouring a foundation slab and strip foundations. The bitumen membrane is the next step and follows directly on from them.

What to decide before work starts

What kind of water acts on the house

The membrane build-up is set by the design, according to the water expected around the house. Technical literature distinguishes three cases:

  • soil moisture: natural moisture in the ground that does not form a continuous water table. According to technical sources, one bitumen membrane is usually sufficient here,
  • draining and percolating water: rainwater that passes through the backfill and exerts only slight pressure on the structure. Two membranes are recommended on horizontal surfaces,
  • water under pressure: groundwater with a continuous water table that at least occasionally rises above the level of the foundation base. Here two modified membranes or a different system are specified.

If you are not sure what kind of water affects your plot, the decision belongs to the designer and a hydrogeological survey, not to the installer on site.

Radon

Foundation waterproofing often has a second job: preventing radon from the ground from entering the house. Public health authorities set reference levels for radon in homes, and their recommended preventive measures include determining the radon index of the plot and making structures in contact with the ground more airtight. The bitumen membrane manufacturer Sika states explicitly that oxidised membranes with a glass mat of the V60 S35 and V60 S40 type are entirely unsuitable as radon protection. Where radon is a concern, modified membranes with glass fabric, for example of the G200 S4 type, are used and sized by calculation. According to the manufacturer, for a single-storey house without a cellar of up to 200 m², the calculation often comes out at one membrane, although recommended build-ups commonly allow for two.

Oxidised or modified membrane

There are two main groups of torch-on membranes on the market:

  • oxidised membranes are cheaper and stiffer. For example, the manufacturer specifies an oxidised membrane with G200 glass fabric and a thickness of 4 mm as a single layer against soil moisture, and in multi-layer systems also against water under pressure and radon. It can be applied when both the product and the air are at +5 °C or above,
  • SBS modified membranes are more flexible and cope better with movement of the substrate and with cold. They are used where water loading is higher, against radon and for details.

The carrier is also important. Membranes with glass fabric (G) have good tensile strength, while membranes with a glass mat (V) are, according to the manufacturer, used as a bottom layer combined with stronger membranes. Membranes with an aluminium carrier must not be used as a standalone waterproofing layer below ground. Technical publications on radon also rule out membranes with an absorbent carrier made of paper or jute.

Felt is not a waterproofing membrane

Lightweight bitumen felt, for example the A330H type with a rag fibre carrier, is nailed or glued, and the manufacturer states that its watertightness is limited. It is intended as an underlay beneath roof coverings. For foundation waterproofing, a full membrane around 4 mm thick is torched on. When comparing quotes, ask for the specific membrane type, not just 'felt'.

Step-by-step procedure

  1. Checking the substrate: the concrete must be sound, clean and dry, free of sharp protrusions, stones and grease. According to the manufacturer, fresh concrete should be left to cure for 2 to 3 weeks.
  2. Rounding corners and edges: internal corners, edges and arrises are rounded with cement screed or render to a radius of 40 to 50 mm, so the membrane does not have to bend over a sharp angle.
  3. Primer: the bitumen primer is applied with a roller or brush to a dry surface at +5 °C or above. According to the manufacturer, coverage is 0.2 to 0.3 kg/m² and it dries in 2 to 24 hours. On wet concrete the water acts as a separating layer and the primer does not work.
  4. Unrolling and aligning the membrane: the membrane is unrolled, positioned accurately and then rolled up from both ends towards the middle.
  5. Torching on: the torch heats the underside of the membrane and the substrate, and the membrane is gradually unrolled and pressed down over its whole area. On larger areas, technical articles recommend two operatives.
  6. Overlaps: side laps are at least 10 cm, end laps at least 15 cm. A well-torched joint shows a narrow bead of bitumen squeezing out at the edge. End laps of adjacent strips are staggered by at least 0.5 m.
  7. Details: at corners the membranes overlap by 150 mm or a reinforcing strip at least 300 mm wide is added. Pipe penetrations are sealed with collars and proper sealing, not with mastic alone.
  8. Connection to vertical waterproofing: on slabs and basements, the horizontal membrane is left projecting so that the vertical membrane can later be torched onto it. For a reinforced return joint, an additional strip at least 300 mm wide is used.
  9. Protection: the finished membrane must not be loaded with materials or walked on in sharp-soled footwear. It needs protecting until it is covered by the floor or the masonry.

Membrane under masonry

On a house built on strip foundations, the membrane is often laid in two stages. Technical articles advise priming and torching the membrane only under the loadbearing walls first, with a lap of at least 15 cm left for the later connection, and laying the full floor membrane just before the floor insulation goes down. A full-area membrane laid at the very start would easily be damaged by subsequent work on site. Masonry guides describe the horizontal layer under the first course as mortar, membrane and a further layer of mortar. For choosing blocks and mortar for the first course, see the overview Ytong and Porotherm.

How the membrane is torched onto larger horizontal areas and onto basement walls is described in detail in the articles on torching bitumen membrane onto a horizontal surface and onto a vertical surface.

What affects the price

The work is charged per m² of waterproofed area and consists of two items: primer at approximately €3.50 per m² and torching on the membrane at €2.80 per m². The final total depends mainly on:

  • number of layers: with water under pressure or a higher radon risk, two membranes are torched on, so the laying item is counted twice,
  • full area or just strips under the masonry: narrow strips under walls involve more cutting, joints and handling per m² than a large continuous area,
  • number of details: corners, drainage and water pipe penetrations, reinforcing strips and the connection to vertical waterproofing,
  • condition of the substrate: cleaning, removing protrusions and forming rounded corners are separate operations,
  • membrane type: SBS modified membranes and radon membranes cost more than oxidised ones,
  • weather and timing: priming and torching cannot be done below +5 °C or on wet concrete, so the work may be postponed,
  • stages: if the membrane is laid under the masonry first and over the full area later, the installer has to come twice.

When calculating the area, laps and the upstands on the slab edges are included as well. Check the materials, meaning the primer and the membranes, separately in the quote.

What should be ready

  • the concrete is cured, dry, and free of dirt and sharp protrusions,
  • ducts and penetrations for drainage, water, electricity and earthing are fitted in advance, as drilling through a finished membrane later creates a weak point,
  • timber, polystyrene, sheeting and other flammable materials are cleared from the vicinity,
  • it is clear whether the whole area is being waterproofed or, for now, only the strips under the masonry,
  • the design specifies the type and number of membranes and, where relevant, radon protection,
  • it is agreed who will cover the membrane, when, and how it will be protected until then.

Store membrane rolls upright. If they lie flat, their round cross-section deforms into an oval, the membrane is harder to unroll and may be damaged.

Common mistakes

Torching onto damp or fresh concrete

Water in the substrate prevents the primer from bonding and turns to steam when the membrane is heated. The membrane only sticks in spots, and bubbles and channels form underneath it through which water travels.

Skipping the primer

Without primer, the membrane sticks to the dust on the concrete surface. It looks fine at first, but over time it comes away from the substrate.

Loose-laid membrane

If the membrane is not torched on over its whole area, the watertightness depends entirely on the joints and penetrations. Any defect in a joint then lets water spread under the whole area.

Wrong material

Felt instead of a waterproofing membrane, a membrane with an aluminium carrier as the only layer, or an oxidised membrane with a glass mat on a plot with radon. The difference in material cost is small, while a repair under a finished house is almost impossible.

Horizontal and vertical waterproofing not connected

Technical articles list this among the most common mistakes. On forums, the same experience comes up again and again: waterproofing the plinth only down to ground level, without a continuous horizontal layer under the wall, does not solve the damp problem.

Dimple membrane instead of waterproofing

A dimple membrane is only a protective and separating layer. It does not replace waterproofing, it merely protects it from damage by the backfill.

Damage during bricklaying

Stored pallets, wheelbarrow wheels and sharp soles will puncture even a good membrane. Technical articles list damage to the membrane during bricklaying and material storage among the usual mistakes, so protect it until it is covered.

How to check the finished work

  • the membrane is torched on over its whole area, with no bubbles, creases or lifting edges,
  • every joint shows a continuous bead of squeezed-out bitumen, and the edge cannot be lifted with a blunt scraper,
  • side laps are at least 10 cm, end laps at least 15 cm, and end laps are not in one line,
  • with two layers, the joints of the top and bottom membranes are not above one another,
  • corners and penetrations have reinforcement and collars, not just mastic,
  • edges are ready for the vertical waterproofing to be connected and are not covered in mud,
  • there are no burnt-through spots or punctures in the membrane,
  • you have photos of the whole area and the details, and a record of the membrane type used.

Always take photographs before bricklaying and before the floor is laid. After that, nobody will see the membrane again.

For DIYers

Torching on is work with a naked flame, and its quality is hard for a layperson to judge. Leave it to waterproofing installers. You can, however, help with the preparation:

  1. Clean the slab or strips of soil, mortar and dust and remove sharp protrusions.
  2. Check that the concrete is dry and has cured in line with the manufacturer's instructions.
  3. Having agreed the type of primer with the installer, apply it with a roller in a thin, even coat at a temperature above +5 °C.
  4. Let the primer dry as stated in the technical data sheet and protect it from rain and dust.
  5. Clear flammable materials from the surroundings and have a fire extinguisher ready.
  6. Once finished, protect the membrane and do not store anything on it.

Frequently asked questions

The work has two items: primer at approximately €3.50 per m² and torching on the membrane at €2.80 per m². With two layers, laying is counted twice. Check materials and details such as reinforcement of corners and penetrations in the quote.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.