Torch-applied Bitumen Felt - Horizontal Surface (Single Layer)

Torch-applied bitumen felt on a horizontal surface creates a continuous waterproof layer on a flat roof, terrace or ground slab. Guide price: €32.00 per m². The substrate, the number of details and the area affect the cost most.

Updated 09/2026·11 min read·14 price list items
Standard labour price
€32.00/ m²
Indicative range
€25.60 - €41.60
60 m² flat
€4800.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Torch-applied Bitumen Felt - Horizontal Surface (Single Layer)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Flooring14 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Preparation

Torch-on bitumen felt (1 layer)m²€32.00 / m²m²enter quantity-
Removal of existing floating flooringm²€2.80 / m²m²enter quantity-
Skirting board removalm€1.20 / mmenter quantity-
Removal of glued linoleum flooringm²€4.50 / m²m²enter quantity-
Grinding concrete subfloorm²€9.50 / m²m²enter quantity-
Subfloor sanding before levelling (adhesive/tar removal)m²€4.50 / m²m²enter quantity-
Subfloor priming + corner caulkingm²€3.50 / m²m²enter quantity-
Subfloor primingm²€1.90 / m²m²enter quantity-
Self-levelling compoundm²€6.90 / m²m²enter quantity-
Perimeter expansion tapelm€2.50 / lmlmenter quantity-
Expanded clay (Liapor) levelling fillm²€14.50 / m²m²enter quantity-
Install OSB boarding to floorm²m²-
Wood fibre underlay board 20 mm (thermal and impact sound insulation)m²m²-
Force-fit joint stitching with resin and wave connectorspc€18.00 / pcpcenter quantity-
Total labour
- enter quantity
Create quote from price list →

Torch-on felt for flat roofs, terraces and ground slabs

The roofer or waterproofing installer heats the underside of the bitumen membrane with a gas torch. The molten bitumen is then pressed onto the prepared substrate. The result is a continuous layer that keeps water and moisture out of the structure.

This item covers a horizontal surface and a single layer of membrane. On new builds it is most often used to waterproof the ground slab before the walls go up. In refurbishment it is usually the flat roof of a garage, an extension or a block of flats. Concrete terraces and balconies are also common, where a new layer stops leaks.

On a horizontal surface gravity helps. The roll is unrolled, torched and settles onto the substrate under its own weight. On a roof or terrace the substrate needs a slight fall, usually at least around 1.5 to 2 %. Otherwise water ponds in one place.

When a single layer is enough and what to decide beforehand

A single layer is enough where the structure is exposed only to normal ground moisture or to rain that drains away quickly. For a ground slab this means free-draining ground with working drainage. On clay soil, with a high water table, on a slope with water running in, or under a habitable basement, a two-layer system is usually needed. This should be decided by the designer, not estimated on site.

Flat roofs are stricter. Here the single layer is the whole roof covering. It must therefore be a cap sheet that the manufacturer specifically approves for single-layer use. An ordinary underlay membrane on its own is not adequate on a roof.

Most waterproofing problems start at the decision stage, not during torching. Before placing an order, clarify the following:

  • which membrane will be used: the quote should state the bitumen type, the reinforcement and the thickness, not just a brand name,
  • whether the substrate has a fall: on roofs and terraces the fall is formed in the concrete or in a screed or tapered layer before waterproofing, the felt does not create it,
  • who deals with penetrations and edges: outlets, pipes, parapets and junctions with walls should be clearly named in the quote,
  • what goes on top: on a roof the membrane stays exposed to the sun, on a ground slab or terrace further layers follow, for example a screed or tiles laid with a perimeter expansion strip along the walls. This decides between a mineral-surfaced membrane and a protective layer,
  • whether the old layer is stripped: in refurbishment this depends on its condition, not on habit. In homes built before 2000, have suspect materials tested before stripping or drilling. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.

On the roof of a block of flats, the work must be agreed with the managing agent, freeholder or residents' management company. If the roof build-up or insulation changes during the renovation, check with your local authority's building control what approval is needed. Insulation on renovations in England must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027.

Which membrane to choose

  • SBS modified bitumen membrane stays flexible even in frost and bridges small cracks in the substrate. It is a common and sensible choice for both slabs and roofs of houses,
  • oxidised bitumen felt is simpler and less flexible. It becomes brittle in frost and can crack. It is better suited as an underlay or for less demanding areas,
  • mineral-surfaced membrane is used as the cap sheet on a roof that stays exposed to the sun. The mineral finish protects the bitumen from UV radiation,
  • membrane with an aluminium core is specified where there is an increased radon risk. In that case the designer sets the build-up based on the radon assessment of the site.

With a single layer, thickness also matters. A ground slab usually receives an SBS membrane at least 4 mm thick. On a flat roof the single layer is typically a 5 mm mineral-surfaced SBS cap sheet. A thinner membrane has less margin for minor damage and ageing.

Membranes for below-ground waterproofing and membranes for roof coverings are assessed against different product standards. When choosing, it is worth checking the label on the roll and the technical data sheet. They state the purpose of the membrane, the bitumen type, the reinforcement and the thickness. A brand name says nothing about quality.

How torching onto a horizontal surface is carried out

  1. Clean the substrate of dust, laitance, release oil residues and loose material. Fill holes and voids with repair mortar. Uneven or contaminated concrete may first need grinding and levelling.
  2. Round off internal corners and edges with a mortar angle fillet. A membrane cannot be laid permanently over a sharp right angle without tension. On roofs and terraces this mainly concerns the junction with the parapet and the house wall.
  3. Check that the concrete is cured and dry throughout its depth, not just on the surface. On roofs and terraces also check the fall, for example with a straightedge and spirit level or by pouring a little water.
  4. Coat the whole surface with bitumen primer and let it dry as the manufacturer specifies. A correctly primed surface is evenly dark, without shiny wet patches.
  5. Dry-lay the rolls and align them. The end laps of adjacent rolls must not meet at one point. Laps follow the manufacturer's instructions, usually about 10 cm at the sides and 15 cm at the ends. On a sloping surface, start at the lowest point so the upper sheet overlaps the lower one in the direction of water flow.
  6. Torch the membrane across its full width while also warming the substrate. The right temperature is shown by a small bead of molten bitumen flowing ahead of the roll.
  7. Press the membrane down with a roller. A thin continuous bead of bitumen must squeeze out at the laps.
  8. Finish the edges. On roofs and terraces, take the membrane up the parapet or wall as an upstand, normally at least 150 mm above the finished surface, and finish it under flashing or a termination bar. On a ground slab, leave the edge ready for connecting the vertical tanking as designed.

Pipe penetrations and sleeves must be fitted before waterproofing. They are sealed with a proprietary collar or a collar torched from the membrane. Drilling through the finished layer afterwards cannot be reliably repaired. The same applies to roof outlets, which must be joined watertight to the membrane.

Work with an open flame is a job for a professional. Torching is done only in dry conditions without strong wind. The minimum temperature is set by the manufacturer. For oxidised felts the limit is usually around +5 °C, while manufacturers often allow SBS membranes to be torched at lower temperatures. Combustible materials nearby, such as timber, polystyrene or sheeting, must be covered or kept at a safe distance. A fire extinguisher must be at hand. Where the membrane meets insulation or timber, a self-adhesive membrane is used instead of torching.

When the below-ground walls are also waterproofed

Tanking foundation walls, basement walls and the plinth is a separate job. On a wall, the installer has to hold, heat and press the membrane while torching. Work always proceeds from the bottom up. On tall walls the membrane is cut into shorter lengths and sometimes mechanically fixed at the top. Otherwise a long sheet would drag the soft bitumen down under its own weight and the layer would thin out at the top. The work is often done in a narrow trench. A trench around 60 to 80 cm wide makes it much easier.

For the horizontal waterproofing, the junction is what matters most. If the wall membrane is not joined watertight to the slab waterproofing, moisture bypasses it at the corner and rises into the masonry. In practice a damp basement is often caused not by the membrane itself but by a poorly made junction. Vertical tanking is taken above ground level, usually at least around 30 cm. Before backfilling it is protected with dimpled membrane or XPS boards. Once backfilled it is inaccessible, so any defect is very difficult to repair.

What affects the price

The guide labour price is €32.00 per m². It applies to a standard horizontal surface with a prepared substrate. The final amount is shifted by these factors:

  • substrate condition: clean, flat and dry concrete only needs priming. Removing laitance, filling voids or levelling irregularities adds cost depending on the extent, noticeably on a poor substrate,
  • size of the area: on a large area the work flows. On a small balcony or porch canopy, preparation and details take most of the time. The price per m² is usually much higher,
  • number of details: every pipe penetration, outlet, rooflight, corner and fillet adds work. An area with many details can cost tens of percent more than a simple area of the same size,
  • edges and upstands: taking the membrane up a parapet or wall is slower than flat work and is often charged separately,
  • old covering: stripping and removing old felt is a separate job (check that whoever takes the waste away is a registered waste carrier and ask for a waste transfer note), and residues may need grinding off old adhesive and bitumen. If the old layer can stay, there is a saving, but it still has to be cleaned and primed,
  • access and height: for a ground slab the materials are unloaded right next to it. On a roof they must be carried up, sometimes scaffolding or lifting equipment is needed,
  • materials: SBS modified membrane costs more than oxidised felt, and thicker, mineral-surfaced or aluminium-core membranes cost more still. Check whether materials are included or charged separately,
  • time of year: out of season the weather forces breaks and the job takes longer.

What makes the work easier and what slows it down

The installer works quickly when there is nothing to wait for on site. It helps if the client arranges:

  • finished and cured concrete on time. If the pour is delayed, the waterproofing is delayed too,
  • penetrations and outlets fitted before waterproofing. The plumber should finish before the waterproofing installer starts,
  • a clear area without stored materials, pallets or other trades' tools,
  • access to the area: space to unload rolls and gas cylinders, a route onto the roof, and vehicle access for a ground slab,
  • a date with a weather margin: rain, dew or strong wind stop the work. It is not reasonable to expect it on an exact day,
  • protection of the finished layer: on a ground slab, agree with the bricklayers that they do not walk on the membrane unnecessarily or stack materials on it.

Typical mistakes that cause trouble later

  • missing or wet primer: the membrane bonds only in spots. On a roof the wind later lifts it, on a slab it peels off during subsequent work,
  • damp substrate: the water turns to vapour when heated, lifts the membrane and creates a void beneath it,
  • overheating: prolonged heating in one spot burns the reinforcement. The membrane then tears under load,
  • short laps or joints without a bitumen bead: water gets under the waterproofing and spreads across the area,
  • laps against the direction of water flow: water runs under the joint and in time finds its way beneath the membrane,
  • no fall: water ponds on the roof or terrace. The membrane ages faster underneath and any small joint defect lets water in,
  • ordinary underlay as the only layer on a roof: without a mineral surface the sun quickly destroys it and the roof starts leaking earlier than it should,
  • upstand finished too low at a parapet or wall: splashing water and melting snow get behind the membrane,
  • sharp corners without a fillet: the membrane stays under tension and cracks as the building settles,
  • unprotected membrane on a ground slab: during bricklaying people walk on it and materials are placed on it. It is easily punctured and nobody notices.

How to check the finished waterproofing

Slab waterproofing can only be checked before further layers go on. On a terrace this means before tiling, on a roof before any protective layer. Ask for photos of corners, penetrations and edges as well. At handover, look for:

  • a continuous bitumen bead along the full length of the laps,
  • joints that cannot be lifted by hand or with a scraper,
  • a surface without blisters, ripples or shiny scorched areas,
  • laps running in the direction of water flow,
  • rounded corners without the membrane under tension,
  • sealed pipe penetrations and outlets,
  • an upstand taken high enough up the parapet or wall and finished under flashing or a termination bar,
  • on a ground slab, an edge ready for connecting the vertical tanking,
  • roll labels matching the quote, meaning the membrane type and thickness,
  • on roofs and terraces, a surface with no standing water after rain.

Within the wider flooring work, a well-executed membrane is the base on which screeds and floor finishes on terraces and ground slabs depend.

Frequently asked questions

The guide labour price is €32.00 per m² for a single layer on a horizontal surface. The final price rises with substrate repairs, a small area, many penetrations and corners, upstands, stripping the old covering and difficult roof access.