Price list 2026 · Europe

Groundworks: excavation cost per m³ 2026, backfilling, compaction and removal

Earthworks and excavation cover digging by machine and by hand, trimming foundation bases, backfilling, compaction, shoring and taking away spoil. What you pay depends mostly on the type of soil, how deep the dig goes, whether a machine can get in, and how much soil has to leave the site.

Updated 09/2026·17 min read·21 price list items
Standard labour price
8,02 €/ m³
Indicative range
6,40 € - 10,50 €
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
Short answer

Machine digging of a construction pit costs 8,02 € per m³ of labour, based on the current price list. Foundation trenches cost more, because they are narrower and need extra trimming. Hand trimming, backfilling, compaction, shoring and taking soil away are priced separately. Heavy ground, a high water table or tight access for the machine will all push the price up.

Types of work and their prices

per m³
Foundation Trench Excavation

The most common job for a new build or a fence. The excavator digs precisely to the set-out line, and the base is then trimmed by hand.

8,02 €
per m³
Construction Pit

A large volume for a basement or a ground-bearing slab. The rate per m³ is lower, but removal and temporary storage of the soil become the deciding factor.

6,00 €
per lm
Trench for Utility Connections

Excavation for water, drainage, electricity or gas. The depth follows the utility provider's requirements and the frost-free depth, which varies regionally.

22,05 €
per m³
Hand Excavation

For places machinery cannot reach, or near utilities. The price depends on the soil class: class 1-2 covers sand and topsoil, class 3 clay and gravel, class 4 heavy clay and gravel with boulders. The class is determined by a site visit or ground survey; even a machine moves more slowly through clay or rock.

per m³
Backfill and Compaction

Backfill is placed in layers and each layer is compacted. Uncompacted backfill later settles under paving or a path.

10,02 €
per m³
Removal of Soil

Excavated soil increases in volume by a quarter to a third. On small plots, removal is often the biggest line item.

Price the work from the price list

Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.

Excavation and groundworks21 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal
Excavations
Mechanical bulk excavationm³8,02 €-
Manual excavation (soil class 1-2)m³22,05 €-
Manual excavation up to 1m depth (soil class 3)m³32,07 €-
Manual excavation up to 1m depth (soil class 4)m³40,10 €-
Mechanical strip foundation excavation (width from 50 cm)m³-
Mechanical pad foundation excavation (width from 80 cm)m³20,05 €-
Mechanical trenching for utilitieslm6,00 €-
Hand trimming of strip foundation up to 1m depthlm8,02 €-
Hand trimming of pad foundation up to 1m depthm²11,53 €-
Hand trimming of formation levelm²5,00 €-
Hand auger excavation up to 25 cm diameterpcs-
Hand auger excavation up to 35 cm diameterpcs-
Backfilling and compaction
Backfill with soil and compactionm³-
Backfill with gravel / crushed aggregatem³10,02 €-
Fills with sand-gravel + compactionm³8,52 €-
Sub-base compaction with vibratory platem²2,50 €-
Compaction with vibratory rollerm²1,80 €-
Waste removal
Spoil removal (incl. loading)m³10,02 €-
Soil removal / Sand-gravel deliverykm3,40 €-
Shoring
Trench shoring up to 2m depthm²-
Other works
Other unspecified workshr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Model Scope of Excavation Works for a Construction Pit (40 m³)
Machine Excavation Only
40 m³ of construction pit, without trimming or removal.
320,80 €
Excavation with Base Trimming
40 m³ of excavation plus hand trimming of 30 m² of the foundation base.
471,10 €
Excavation, Trimming and Removal
40 m³ of excavation, 30 m² of trimming and removal of 30 m³ of soil (excluding backfill).
771,70 €
Indicative total labour cost based on the quantities shown. Each row covers the excavation itself only. It does not include machine transport, tipping fees, surveyor set-out or dewatering. Trimming of trenches is charged per linear metre, and trimming of the base (including under footings) by the m².

Preparation and sequence of excavation

01
Marking Out and Finding Services

Before any digging starts, the site boundary and existing underground services are marked out. No machine digs near services until the network operator gives clearance, and inside the protection zone (usually up to 1 m from the service, depending on the operator) the work is done by hand.

02
Digging by Machine

The excavator stops just above the design depth, so the ground the foundation will sit on stays undisturbed.

03
Trimming by Hand

The base and sides are trimmed by hand and any loosened soil is taken out. The foundation has to sit on firm ground that nobody has disturbed.

8,02 €/lm
04
Shoring Deeper Digs

Anything deeper than 1.3 m has to be secured with shoring or sloped back (battered), as local health and safety rules require. On house plots with enough room, battering is the usual choice and costs less.

05
Backfilling and Compacting in Layers

Backfill goes in layers of 20-30 cm, depending on the compactor, and each layer is compacted before the next goes in. Under a ground-bearing slab, a plate load test checks the gravel bed, which is why compaction is priced as its own item.

Method of work

  1. 01A site visit to check how the machine gets in and where the soil can be stored for a while.
  2. 02Marking out the building and underground services in line with the operators' clearances.
  3. 03Digging by machine to the design depth, stopping a little above the foundation base.
  4. 04Trimming the base and sides by hand, then checking depth and level.
  5. 05Handing over the foundation base before concreting, with a ground check if anything looks doubtful.
  6. 06Backfilling in compacted layers and taking away the soil that is left over.

5 common mistakes

01
Digging Too Deep Under the Foundation

Once the soil under a foundation is disturbed, it cannot be compacted back. Any over-dig has to be filled with concrete, not soil.

02
Not Checking for Underground Services

Cutting through a cable or gas pipe means damage, a stopped job and a fine. Always have services located before the machine turns up.

03
Backfilling All at Once Without Compacting

One thick, loose layer keeps settling for years. Paving, a patio and any connections on top of it crack and sink.

04
Leaving the Dig Open in the Rain

Water softens the foundation base and it can carry less load. Pour the concrete as soon as you can once the excavation has been signed off.

05
Forgetting to Budget for Soil Removal

Dug-out soil takes up more room than it did in the ground. If you leave out removal and tipping, the budget will not add up.

What groundworks actually include

In quotes and cost estimates you will see both terms, groundworks and excavation works. They cover everything that changes the shape of the land or digs into the ground below it: stripping topsoil, digging for foundations, a basement and service connections, backfilling and bedding pipes, compaction, landscaping around the house and moving or removing soil. On a new house these are the very first jobs on site. Once they are finished, none of it is visible. Mistakes made at this stage still show up a few years later, as cracks in the walls, sunken paving or a damp basement.

In practice, groundworks usually fall into three stages, and different contractors often handle them. First comes digging for the foundations and service connections. Then comes backfilling and compaction once the substructure is built. Last comes landscaping the plot. When you put the budget together, be clear about who is responsible for which stage. The handover points between contractors are where soil removal, final trimming of the trench or compaction tend to get forgotten.

The ground beneath: why you should know your soil before anyone starts digging

How deep and wide a foundation needs to be depends on how much load the ground can carry and how it behaves. For a new build this is usually settled by a site investigation, or at least a basic one. On simpler buildings the structural engineer works from trial pits and from what is known about neighbouring plots. A trial pit dug with a mini excavator where the house will stand costs little compared with the whole build. It often shows whether there is clay, made ground or groundwater at foundation depth.

Price lists often group soil into classes. These come from an older earthworks standard that is no longer in use, but estimators kept them as a familiar shorthand for how hard the ground is to dig. For you, one point matters: the heavier and stickier the soil, the slower the digging, the faster the machine wears and the more each cubic metre costs. Clay has another awkward habit. It shrinks as it dries out and swells when it gets wet. That is why foundations in clay go deeper. The area around the house is also protected from swings between dry and wet, for example with drainage and by keeping trees away from the walls. In many countries with clay soils, trees close to a house are a well-known cause of subsidence.

Made ground deserves its own mention. It means filled-in pits, old cellars or drained and filled marshy land. On plots in villages and older towns it turns up more often than people expect. Made ground cannot reliably carry a building. The foundation either goes down through it, or the made ground is dug out and replaced with compacted gravel, always as the structural engineer specifies.

Why the same soil has three different volumes

Groundworks deal with three volumes of the same soil. In situ soil is soil as it lies undisturbed in the ground, and excavation is measured on that basis. Once it is dug, it loosens and takes up more space, roughly a quarter to a third more. Sand bulks up less, clay and rock more. After backfilling and compaction the volume shrinks again, but it almost never goes back exactly to where it started.

This has two practical consequences. First, check whether the quote prices removal per cubic metre of in situ soil or of loose, bulked soil. Two quotes can differ on this point alone. Second, you need enough room on the plot for a temporary spoil heap. The soil from a basement dig covers a surprisingly large area. It also must not sit at the edge of the excavation, where its weight would push on the sides.

Topsoil, and what to do with surplus soil

Topsoil, the fertile upper layer, is stripped separately and kept in its own heap. You will want it later for landscaping and planting. If it gets mixed with the subsoil, you end up making a garden on poor, heavy ground and buying topsoil back in. Topsoil does not belong in backfill under floors, paths or around foundations, though. The organic matter in it slowly rots and the fill settles.

Clean excavated soil that stays on the same plot is generally not treated as waste. Once it leaves the site, waste rules usually apply. It has to go to a landfill, a licensed recycling facility or another site that can legally accept it, and depending on where it comes from, a soil test may be required. Disposal charges are rarely included in the price of the digging, and with larger volumes they make up a noticeable part of the budget. It makes sense to plan the landscaping so that as much soil as possible stays on the plot, for example to level a slope or raise the ground around the house. Your local council or environmental authority can tell you which rules apply to moving soil where you live.

When water appears in the excavation or frost arrives

Groundwater in an excavation makes the job much harder. The sides start to slump, the bottom turns to mud, and concrete must not be poured into standing water unless a special method is used. Where groundwater is shallow, pumping from a sump is usually enough. A sump is simply a small, deeper pit dug in one corner of the excavation where the water collects. If the water table is higher, you need a design from a specialist.

Groundwater levels rise and fall over the year. A dig that stays dry in a dry summer tells you nothing about whether the basement will stay dry next spring. Waterproofing is designed for the highest water level you can expect, not for what was visible during digging.

In winter there is one simple rule: no concrete goes onto a frozen formation level, meaning the prepared bottom of the excavation that the foundation sits on. Frozen soil loses its strength when it thaws, and the foundation settles. If the excavation cannot be concreted before the frost, the bottom is covered and protected, or the last layer of soil above formation level is left in place and dug out just before the pour.

Safety in the excavation and services underground

A collapsing trench wall is one of the serious dangers on a building site, and it happens even where the wall looks solid. Stiff clay can hold a vertical face for hours. Then rain, vibration from a passing machine or a heap of soil at the edge weakens it, and the wall gives way. Nobody should climb into an unsupported deeper trench, not even for a quick look. Health and safety rules for construction sites set the depth at which a trench needs shoring or sloped sides, and your contractor should know them. Soil, materials and machines stay a safe distance from the edge. In practice that usually means at least half a metre, more for heavy plant.

Ask the operators of underground services, meaning electricity, gas, water, sewers and telecoms, for their plans in good time. Getting a response usually takes several weeks. Many countries have a central enquiry service for this, and your local authority or contractor can point you to it. The operator often wants its own technician to locate the route on site. When digging near a gas main or a high-voltage cable, it may also want a representative present. Digging the trench itself is ordinary groundwork. Connecting gas and electricity, however, may only be done by a suitably qualified person. For gas, that means a qualified, registered gas engineer.

If a gas pipe is damaged during digging or you smell gas, leave the area straight away. Do not use naked flames or switch any electrical equipment on or off, and call the gas emergency number or 112 once you are at a safe distance.

Permits and reshaping the land on your plot

Digging for foundations is part of building the house and comes under the permission for the house itself. With separate landscaping, retaining walls, raised ground or a big change in ground level, things are less clear. Whether your change to the land needs a permit, a notification or nothing at all depends on local building regulations. These differ between countries and regions and change over time. Check with your local building authority before work starts. Do not rely on how it worked a few years ago or on what a neighbour did.

Think about your neighbours as well as the authorities. If you raise the ground near the boundary, rainwater often starts running onto the next plot or pressing against the neighbour's fence. Raised ground near a boundary therefore usually needs drainage and sometimes a low retaining wall. If the wall has to hold back a greater height of soil, a structural engineer designs it. Talking to the neighbour before the machines arrive also saves a lot of trouble later.

Site access and choosing the right machine

The machine you choose affects both speed and cost. A mini excavator fits through the gate of a plot that is already lived on and does little damage, but it is slow on a large excavation. A bigger excavator working with a loader digs a basement much faster. It needs firm access, room to turn and a route for the lorries that take the soil away. On small jobs, such as a service connection or a fence, getting the machine to site can make up a large part of the price.

Before any plant arrives, check the width and strength of the access route and look for overhead cables above the plot. Also think about cesspits, septic tanks, wells and underground tanks. These often do not appear on any utility plan, and you may be the only one who knows where they are. A heavy machine leaves marks on a lawn or block paving, so agree the route across the plot in advance and protect it with panels or boards where needed.

Backfilling around foundations and service connections

What goes into the backfill matters just as much as how it is compacted. Soil with roots or other organic matter, rubble mixed with timber and plastic sheeting, and frozen soil do not belong around foundations or under floors. When backfilling against basement walls, the waterproofing needs protection, usually a dimpled membrane or insulation boards. A sharp stone in the fill can tear the waterproofing, and nobody will notice until water starts coming in.

Service pipes and cables are laid on a sand bed and surrounded with sand so that stones do not press on them. A coloured warning tape goes into the backfill above each service. If someone digs there in a few years, the tape warns them that something runs underneath. Take care when compacting over plastic pipes. A heavy vibrating plate directly above them can squash them out of shape.

DIY guide: digging fence post holes by hand

You can dig shallow holes for fence or pergola posts yourself, as long as you follow a few basic safety rules. For deeper digs, larger volumes or work near services, it is wiser to call in a contractor.

  1. Check with the service operators and in your plot documents that no cables, gas pipes or water pipes run along the fence line.
  2. Set out the fence line with a string line and pegs, and mark the position of each post at the planned spacing.
  3. Cut out the turf and topsoil where each hole will go and keep them to one side so you can put them back later.
  4. Dig each hole with a spade or a hand auger to at least the frost-free depth given in the fence system instructions or the design.
  5. Put the dug soil on a sheet away from the edge of the hole so that it does not fall back in or press on the sides.
  6. Clean out the bottom of the hole, remove any loose soil and, if needed, replace it with a layer of gravel rather than soil.
  7. Check the depth and position of every hole against the string line before setting the posts.
  8. Cover any open holes with a board if they will not be concreted the same day, so that nobody falls in and water does not collect.

How to check and sign off excavation work

Inspect the excavation before any concrete goes in, while you can still see the bottom and the sides. Once the concrete is in the ground, there is nothing left to check. For important foundations, ask the structural engineer or the site supervisor to inspect the formation level.

  • The size and depth of the excavation match the design and the setting out
  • The bottom is cleaned out and free of loose soil, stones and standing water
  • Any areas dug too deep are marked for filling with concrete
  • The sides of deeper excavations are supported with shoring or cut back to a safe slope
  • The dug soil sits at a safe distance from the edge
  • The topsoil is stored separately from the rest of the soil
  • Any services uncovered during digging are undamaged and recorded
  • The backfill material, layer thickness and compaction method are agreed
  • The volume of soil taken away and where it went or how it was reused are documented

Frequently asked questions

Machine digging of a construction pit costs 8,02 € per m³ of labour, based on the current price list. Narrower trenches for foundations and footings cost more, and trimming, backfilling and removal are added on top.

Price the whole project, not just one job

In the building work price list you pick items from every trade, and NUMIQ turns them into a client-ready quote.