Building work price list: Installation of Palisade Edging Over 50 cm High
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Exterior elements cost | ||||
| Installation of palisades over 50 cm | pcs | €6.50 / pcs | pcs | enter quantity- |
| Installation of palisades up to 50 cm | pcs | €4.50 / pcs | pcs | enter quantity- |
| Construction of exterior steps from palisades | lm | lm | - | |
| Installation of timber / WPC decking | m² | €32.50 / m² | m² | enter quantity- |
What tall palisades are and when they are needed
Palisades are posts, usually concrete, set tightly side by side in a concrete foundation. A row of palisades over 50 cm high is no longer just the edge of a flower bed. It holds back soil, deals with a change in ground level and in practice works as a small retaining wall. Typical uses are sloping plots, terraced gardens, the side of a driveway, or anywhere one ground level needs to be safely separated from another.
Low palisades up to 50 cm are mainly used as edging. They separate a path from a lawn or form a low raised bed. You can read more about this in the article on installing palisades up to 50 cm high. At greater heights their role changes. The soil behind them pushes outwards, it gets heavier after rain, and the palisade has to resist this pressure for years without leaning.
Tall palisades are mainly suited to these situations:
- levelling the ground around a new build on a slope,
- terracing a garden into several level areas,
- retaining an embankment beside a driveway or parking space,
- raised beds and separating a seating area from a working part of the garden.
Compared with a conventional concrete wall they look lighter and more natural. However, once the height increases or a car will be driven behind the wall, this is no longer ordinary garden work. As a rough guide, a structural engineer should be brought in for a level change of about 1 m or more, always where vehicles will load the ground behind the wall, and also where the wall stands close to the house, on the boundary or in wet, unstable ground. If the manufacturer states a lower maximum retaining height for its unit, that limit applies.
What to decide before any digging starts
With a retaining wall, most mistakes cannot be put right later without taking the wall apart. It is therefore worth having these points clear before placing an order:
- Height of the level change: not the length of the palisade, but how much soil the wall will actually retain. This determines the type of unit, the depth of the foundation and whether a structural engineer is needed.
- What will be behind the wall: lawn and planting load the wall less than a path, patio or parking area. If vehicles will drive behind the wall, tell the contractor at the very start.
- Where the water will go: the drainage behind the wall needs an outlet, for example into a soakaway, onto lower ground within your own property, or into a surface water drain if the drainage owner allows it. Water must not be directed onto a neighbour's land.
- Position on the plot: for a wall on the boundary or next to a road or footpath, it is wise to know exactly where the boundary runs and to agree things with the neighbour in advance. The location also affects what the local council may require.
- Type and appearance of the units: the colour and finish of the palisades should suit the paving and the house, but the deciding factor is whether the unit is designed for that retaining height.
- Links to other work: if paving, steps or fencing will be built around the wall, it pays to agree the order of work and the levels at the same time.
Which palisades to choose
Concrete palisades
For heights over 50 cm these are the most common choice. They are strong, cope well with frost and damp and need almost no maintenance. They come in various colours and finishes, often imitating stone or timber, so they can be matched to block paving or the house elevations.
Steel-reinforced palisades
For taller walls and higher soil pressure, reinforced units are used. The reinforcement increases load capacity and reduces the risk of a unit snapping under pressure. Whether they are needed is set out in the manufacturer's technical data or decided by a structural engineer based on height and loading.
Timber palisades
They look natural, but at greater heights and in constant contact with soil they last considerably less time and need regular treatment. They are better suited to decorative parts of the garden with lower loads, not to the main retaining wall.
The choice is not only about looks. Soil type, the height of the level change, the amount of water in the area and whether the wall will retain only lawn or also a hard surface all matter. If the manufacturer states a maximum retaining height for the unit, keep within it.
Palisades on a slope: step by step
- Services and setting out: the position of underground services is checked and the line of the palisades is set out with a string line and pegs. The finished top level, or its fall, is also fixed.
- Excavation: a trench is dug for the foundation. Its depth depends on the height of the palisades, the soil and the loading. Manufacturers often state that roughly a third of the unit's length should go into the foundation.
- Trench bottom: it is compacted, and if needed a layer of gravel is added and compacted.
- Concrete bed: concrete is prepared and the palisades are set one by one into the fresh concrete.
- Checking position: height, line and plumb are checked continuously with a spirit level and string line, or a laser level. Corrections are made straight away, before the concrete sets.
- Haunching the back: concrete is also placed behind the palisades so that they form one solid unit.
- Curing: the concrete must cure according to the manufacturer's instructions. In normal practice full backfilling and compaction wait at least a week, longer in cold weather. Using a plate compactor right next to green concrete is risky, as it can move the palisades.
- Drainage and backfill: a perforated drainage pipe, geotextile membrane and gravel backfill are placed behind the wall, compacted in layers. Right next to the wall, a lighter machine is used with more care.
- Tying in the surroundings: the wall is joined to the adjacent surfaces, such as paving, steps or lawn.
Where the palisades meet block paving, the final step is spreading and brushing jointing sand into the joints. More on this work is in the overview of block paving and edging.
Why foundation, drainage and backfill are decisive
Why do tall palisades sometimes start to lean after a few years? Almost always the cause is water or a weak foundation. Soil saturated after rain is heavier and pushes on the wall much more than dry soil. If the water has nowhere to go, the pressure keeps rising and the ground beneath gradually softens. In winter frost adds to this, lifting the wet soil and pushing the wall even harder.
That is why the space behind palisades is not simply backfilled with the excavated soil. Gravel or crushed stone that lets water through is used, with a drainage pipe at the bottom, typically around 100 mm in diameter, discharging where water can safely run away. A geotextile membrane separates the gravel from the soil so it does not clog over time. The ground above the wall should fall gently away from it, not towards it.
Compacting in layers, usually 20 to 30 cm at a time, is just as important. If the backfill is tipped in all at once, it settles later, rain softens the soil behind the wall and the palisades are loaded unevenly.
Price of installing palisades per piece: what it depends on
The guide labour price is €6.50 per piece. Pricing is therefore by the number of units, not by metres of wall, and a longer wall needs several of them for every metre. How to work out the number of pieces is explained in the questions below. The final sum is then affected by the following:
- Length and height of the unit: a longer palisade means a deeper trench, more concrete and heavier handling. The difference in labour between a unit just over 50 cm and one retaining a level change of around a metre is significant.
- Soil: dry sandy or loamy soil without stones is quick to dig. Stony ground, heavy clay that is hard to dig and drains poorly, wet ground or made-up ground make the work considerably more expensive. Sometimes a larger foundation or replacement of the sub-base is needed.
- Slope: on a steep slope work is slower, the trench needs support and the top of the wall often has to be stepped.
- Access: where a mini digger can reach the site and concrete can be delivered by truck, the work is fastest. If materials and concrete have to be carried by hand or wheelbarrow, the price rises noticeably, with difficult access by tens of percent.
- Shape of the line: a short straight run is cheapest. Curves, corners, steps and connections to walls or paving mean more measuring and slower setting.
- Load behind the wall: parking or driving behind the wall requires reinforced units, a heavier foundation and often a structural assessment.
- Drainage and backfill: supply of gravel, membrane and drainage pipe, their compaction and the water outlet may be included in the quote or charged separately.
- Groundwork and removal: a long, tall wall produces a lot of spoil. Its removal and disposal are usually priced separately. As a householder you have a duty of care for this waste, so check that the carrier is registered with the Environment Agency and ask for a waste transfer note. If old paving has to come up first, see block paving removal.
- Nearby services: near cables or pipes, digging has to be done by hand and with care, which slows the work.
When comparing quotes, ask exactly what the price per piece includes: setting only, or also excavation, concrete, drainage, backfill, spoil removal and supply of the palisades.
What makes the job easier and what slows it down
Preparation by the client saves a lot of time on site:
- have plans of underground services available, or have them located and marked in advance,
- have the property boundary clearly marked, especially for a wall next to a neighbour,
- check with the local council whether anything is needed and sort it out before the agreed start date,
- clear the way for the delivery vehicle and machinery, moving parked cars, planters and other temporary obstacles,
- agree where the palisades and gravel will be stored and where the spoil can be heaped temporarily,
- provide access to water and an electricity supply if concrete will be mixed on site,
- decide the top level, the fall and the drainage outlet in advance, so the work does not stop waiting for answers.
Longer spells of rain, when the trench becomes waterlogged, and frost will extend the work. Concrete should not be placed at temperatures around freezing without protection; around 5 °C is commonly taken as the limit. The schedule must also include the days when the concrete is curing and nothing is done on the wall. If a timber or WPC deck is planned on the upper level, it is best fitted once the wall and backfill have settled.
Typical mistakes and how they show up later
A shallow trench or too little concrete in the foundation. At first the wall seems fine, but after one or two winters the top starts to lean out away from the soil. The repair means taking the palisades out and setting them again.
No drainage and soil backfill instead of gravel. Water is held behind the wall, damp patches appear on the face of the palisades and mud may seep out of the joints. The pressure builds and the wall gradually moves.
Backfilling before the concrete has cured. Green concrete cannot resist soil pressure or compaction, the palisades move during backfilling or shortly afterwards and the wall stays crooked.
Concreting in frost without protection. The foundation concrete does not reach its strength, it crumbles and the wall loses its support, even though nothing is visible on the surface.
Inaccurate setting. Units that stick out or have dropped look poor and also load the wall unevenly. The most heavily loaded pieces then lean first.
Underestimating soil pressure. At a height that should involve a structural engineer, the wall can crack, overturn or slide together with the slope. Such a mistake is not only expensive but also dangerous.
Palisades intended for lower use set into a tall retaining wall. Thin or unreinforced units bend or snap under pressure, typically just above the foundation.
Ground above the wall falling towards the palisades. Rainwater runs straight behind the wall and the drainage cannot cope.
How to check the finished work
At handover it is worth walking the full length of the wall and checking these points:
- the palisades are plumb and the top holds the designed level or an even fall, which can be checked with a spirit level and by sighting along the line,
- the line is straight, with no units sticking out or dropped,
- there are no wide gaps between palisades through which soil could escape,
- the foundation concrete is solid, with no visible voids,
- there is gravel backfill and drainage with a clear outlet behind the wall, ideally shown to you before backfilling,
- the ground above the wall falls away from the palisades,
- the units are not cracked or spalled,
- the junctions with paving, steps and lawn are neat and stable,
- the area is tidy and surplus soil has been taken away, if agreed,
- the contractor has given you details of the materials used and the manufacturer's recommendations.
After that, an occasional check is enough, especially after heavy rain and winter: whether the wall is leaning or cracking and whether the drainage is carrying water away.
Frequently asked questions
The guide price is €6.50 per piece. The final sum depends on the length of the units, the soil, the slope, site access, the shape of the line and whether the price also covers excavation, concrete, drainage and spoil removal.
Divide the length of the wall by the width of one unit as stated by the manufacturer and round up. For a unit about 12 cm wide, 100 / 12 gives roughly 8.3, so in practice 9 pieces are needed per running metre. For curves and corners it is worth adding a few spare pieces.
It depends on the height, the location and whether the structure is a retaining wall, for example on the boundary with a neighbour or next to a road or footpath. Do not assume that no permission is needed. Planning permission and building regulations approval are separate, and permitted development rights can be removed in certain areas by Article 4 Directions. Before work starts, check with your local council's planning department and, where relevant, building control.
The depth is determined by the height of the palisade, the soil type and the loading. A common rule of thumb is roughly a third of the unit's length in the concrete foundation. Exact figures are in the manufacturer's technical data, and for taller walls a structural engineer will specify them.
DIY installation is not recommended at this height. This is a retaining structure that carries the pressure of soil and water. Faults in the foundation or drainage often show only after years, are hard to repair and can lead to a collapse, so it is better to use an experienced landscaping contractor.
A short run on an easily accessible plot is usually finished in a few days. On a slope, with poor access or a longer wall it takes longer. The time must also include concrete curing before backfilling, in normal practice at least a week.
With good-quality material, a sound foundation and working drainage they last many years with little maintenance. Their life is shortened mainly by water that has nowhere to drain and by frost acting on waterlogged ground.
Related work
How palisades up to 50 cm high are installed, which material and base to choose, what to avoid and how to check the finished work.
How a timber or WPC deck is installed, which base and subframe to choose, which gaps and fall to keep, common mistakes and what to check at handover.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
How to lift block paving without needless damage, when to reuse the blocks, and what to watch with kerbs, buried services and waste disposal.
What a levelling course under block paving is, which material to use, how thick it should be and how to screed it flat before laying.
How to compact a gravel sub-base with a vibrating plate: layer thickness, number of passes and how to check the base is firm enough for paving.