Building work price list: Installation of Palisades up to 50 cm High
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Exterior elements cost | ||||
| Installation of palisades up to 50 cm | pcs | €4.50 / pcs | pcs | enter quantity- |
| Installation of palisades over 50 cm | pcs | €6.50 / pcs | pcs | enter quantity- |
| Construction of exterior steps from palisades | lm | lm | - | |
| Installation of timber / WPC decking | m² | €32.50 / m² | m² | enter quantity- |
What palisades are and what they are used for
Palisades are posts made of concrete, timber or plastic. They are set upright, tight against each other, in a continuous line. Up to 50 cm high, they form a firm edge to a path, a planting bed or a patio. They can also work as a low wall that holds back a small change in level in the garden. They usually come into play during landscaping around the house, when a standard kerb is not enough and areas need to be separated by height. For an overview of related edging and paving jobs, see block paving and edging costs.
A kerb only separates paving from the lawn. A palisade can also handle a small difference in level, for example a raised bed, a stepped transition next to a patio or the edge of a gentle slope. A height of up to 50 cm is practical for an ordinary garden. It holds the soil, does not look heavy and needs no complex calculation.
When palisades up to 50 cm are suitable and when they are not
Part of a palisade is always in the ground. A unit 50 cm long therefore shows less above ground, roughly two thirds of its length, or about 30 to 35 cm. When planning, do not work from the length of the unit but from how much should stand above the ground.
If a larger slope has to be held back, or a car or heavy load will stand behind the palisade, the job becomes a retaining wall. This should be assessed by a specialist and needs a deeper foundation, usually concrete. For taller units, see installation of palisade edging over 50 cm high.
Low palisades in a garden usually need no consent. However, each case depends on the specific situation. For retaining walls, changes in ground level on the boundary with a neighbour's property, or work at a block of flats, check in advance with your local council whether any permission or notification is needed. In a block of flats, also agree the work beforehand with the freeholder or the managing agent.
What to decide before placing the order
- What the palisade is for: whether it is just a decorative edge to a bed or it will hold back soil. This determines the material, the bed and the depth of the trench.
- Height above ground: how many centimetres the palisade should stand above ground, and whether the top edge should be level, sloping or stepped.
- Line: straight run, curves, corners. A curve can be marked out with a hosepipe directly on site and shown before work starts.
- Connection to surroundings: if paving is also planned, its level and fall should be set in advance so that water does not run towards the palisade.
- Who supplies the materials: whether the contractor provides the palisades, gravel and concrete, or you buy them yourself. All units should come from one delivery, as the colour of concrete can vary slightly between production batches.
Concrete, timber or plastic: which material to choose
Concrete palisades are the most durable. They withstand frost, moisture and soil pressure and, when properly installed, last many years. They are made in grey and coloured versions and with surfaces that imitate stone or timber. They are the right choice for slopes, around the house and next to driveways. They are heavy, however, so carrying them takes strength and good access.
Timber palisades look natural and are quick to install. Timber in the ground will sooner or later succumb to moisture and rot, even when treated. They are better suited to decorative bed edges than to holding back soil.
Plastic and composite palisades are light, do not rot and need almost no maintenance. Their strength is lower, however, so they are suitable for visually separating areas, not for retaining ground.
A simple rule: the more pressure the palisade will take, the more you should lean towards concrete and a concrete bed.
How the installation works step by step
- Locating services and setting out. First, check whether any underground services run along the line. Then the line and the height of the top edge are marked with a string line and pegs. A hosepipe or marker spray helps with curves.
- Excavation. A trench is dug deep enough to take the sub-base, the bed and the buried part of the palisade. This usually means at least a third of the unit length plus the sub-base. If the palisade will hold back soil, the trench is made wider to leave room for concrete haunching behind it.
- Sub-base. Gravel or crushed stone is spread on the bottom and thoroughly compacted. This layer carries the load and also drains water away.
- Bed. For light decorative edges, a compacted gravel bed is enough. On slopes, under heavier loads or in soft ground, the palisades are set in concrete, usually mixed semi-dry (earth-moist).
- Setting. The palisades are set one by one to the string line, tight against each other, and tapped into place with a rubber mallet. Plumb, line and level are checked continuously with a spirit level or laser.
- Rear haunching and drainage. If the palisade holds back soil, it is backed with concrete on the soil side and drainage gravel is placed behind it, with a land drain pipe in wet ground. For a decorative edge on level ground, it is enough to backfill and compact gravel around the palisades.
- Backfilling and finishing. Finally, the trench is backfilled, the soil is lightly compacted and the surroundings are joined to the lawn, bed or block paving. If the bed is concrete, backfilling and loading only take place once it has hardened, according to the manufacturer's data.
Why so much attention to the sub-base? Soil freezes in winter and becomes waterlogged in spring. If the sub-base is not firm and free-draining, the palisades start to lean after the first winter.
What the price depends on
The guide labour price is €4.50 per piece. Because the price is per piece, the total depends mainly on the number of units along the line. Narrower palisades mean more pieces and more work for the same length.
- Purpose and bed: a decorative edge on a gravel bed is the cheapest. A concrete bed with rear haunching adds material, labour and curing time, so the price per piece rises noticeably.
- Ground: slopes and the need to hold back soil require a deeper trench, a concrete bed and haunching. Work on level ground is much quicker.
- Shape of the line: with curves and changing heights, each unit is adjusted individually, so a complex line takes longer than a straight run.
- Soil: clay or waterlogged ground needs a deeper sub-base and drainage, which adds material and digging.
- Obstructions in the trench: tree roots, stones or old concrete footings must be removed, often by hand or with a breaker. Where existing paving is in the way, block paving removal may be needed first.
- Access and removal: poor access to the site, carrying heavy concrete units over long distances and large amounts of spoil to remove all make the job more expensive.
- Services along the line: near them, digging is done carefully by hand, which slows excavation.
- Material: light plastic and timber palisades are set faster than heavy concrete ones.
When comparing quotes, check whether the price per piece includes excavation, sub-base, concrete, drainage and removal of spoil, or whether these are charged separately. Before you hand over spoil or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
What makes the work easier and what slows it down
- Services located: if underground services are located before the contractor arrives, digging can start straight away.
- Clear line: before work starts, remove furniture, plant pots and hoses. Move any plants you want to keep in advance.
- Space for materials: pallets of palisades, gravel and a skip for spoil should have space as close to the line as possible, with firm access.
- Water and electricity: an outside tap for mixing concrete and a socket for a mixer or plate compactor save time.
- Weather: concrete should not be laid in frost or at temperatures close to freezing. Heavy rain softens the trench and stops work.
If you hit a gas pipe while digging or smell gas, stop work immediately, leave the area and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
Mistakes that show up after the first winter
- Poorly compacted sub-base. The palisades settle unevenly and the line starts to wave.
- Set too shallow. A short buried section cannot resist soil pressure and the units lean out.
- No drainage. Water behind the palisade pushes, freezes in winter and gradually forces it outwards.
- Wrong material. Timber or plastic on a slope where concrete belongs.
- No rear haunching. The palisades stand only in gravel although they hold back soil, and over time they spread apart.
- Level not checked. On a longer run, even a small deviation is clearly visible.
- Backfilling before the concrete hardens. Soil pressure shifts freshly set units and the fault cannot be corrected without taking them out.
- Paving falling towards the palisade. Water collects at the joint, soaks the sub-base and the palisades lean.
How to check finished palisades
- the line is straight or smoothly curved as planned,
- the top edges are level or at the agreed fall, with no steps between units,
- the palisades stand plumb and do not move when pushed by hand,
- the height above ground matches what was agreed,
- there is concrete haunching and drainage gravel at the back where the palisade holds back soil,
- the units fit tightly together and no gap is wider than elsewhere,
- there are no concrete residues or chipped edges on the visible face,
- the joint with paving, lawn or bed is clean and without holes,
- water does not stand behind the palisade after rain,
- the area is tidied and surplus soil removed.
DIY guide: palisades as an edge to a bed or path
A low decorative edge on level ground can be done yourself following the method described above. If the palisade is to hold back a slope, stands by a driveway or heavy machinery will run above it, the work is better left to a contractor. The same applies where palisades form a raised edge next to a patio or a timber or WPC deck that will carry load. Do not dig blind near services, especially gas and electricity. Any work on gas pipes must be done by a Gas Safe registered engineer, and work on electrical cables should be left to a qualified electrician.
- Prepare the tools: spade, shovel, wheelbarrow, string line, pegs, spirit level, straight edge, rubber mallet and a hand tamper or a hired plate compactor.
- Have the services along the line located before digging.
- Set the string line exactly at the height of the top edge, not at ground level, so that each unit can be aligned to it.
- Start setting from a corner or from the lowest point of the line and work in one direction.
- Every few units, lay the straight edge with a spirit level across the top edges so that any deviation does not build up over a longer run.
- With a concrete bed, mix only as much concrete as you can use in time, and backfill only once it has hardened.
- After the first heavy rain, check whether any unit has settled and realign it straight away.
- With heavy concrete units, wear work gloves and sturdy footwear and lift with your knees, not your back.
Frequently asked questions
The guide price is €4.50 per piece. The final amount varies mainly according to whether the palisade holds back soil and needs a concrete bed. Other factors are described in the price section.
It depends on the width of the unit. With a typical width of around 10 to 15 cm, it works out at roughly 7 to 10 pieces per metre. To get the exact number, divide the length of the line by the width of the palisade and add a few spare pieces for corners and breakages.
Usually at least a third of the palisade length is buried, with a compacted sub-base and bed beneath it. On slopes and in soft ground it is better to go deeper.
A low edge to a bed or path usually needs no permission. For retaining walls, changes in ground level near a neighbour's boundary or work at a block of flats, check with your local council in advance whether anything is required.
A short run on level ground can usually be done in a day or two. Longer runs, slopes and curves take longer, and you also need to allow time for the concrete to harden.
Yes, it is a common solution. A palisade can form the edge of a path or patio and hold back a change in level at the same time. Levels are best planned together with the paving so that water does not collect at the joint.
Concrete palisades with a good sub-base and drainage last many years. Timber ones have a much shorter life in the ground, even when treated. For any material, the quality of the sub-base and drainage is what matters most.
Related work
How palisades over 50 cm are set in concrete, why drainage and backfill matter, and what to check when you accept the finished retaining wall.
How a timber or WPC deck is installed, which base and subframe to choose, which gaps and fall to keep, common mistakes and what to check at handover.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
How to lift block paving without needless damage, when to reuse the blocks, and what to watch with kerbs, buried services and waste disposal.
What a levelling course under block paving is, which material to use, how thick it should be and how to screed it flat before laying.
How to compact a gravel sub-base with a vibrating plate: layer thickness, number of passes and how to check the base is firm enough for paving.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.