Electrical installation

Practical advice, work sequences and prices for your project.

9 articles

All articles

9 articles · Page 1/1
Smart home and FTP cabling: electrical installation prep costs for an intelligent home

Smart homes and FTP cabling: the cost of wiring for an intelligent home

A smart home is no longer a luxury, smart lighting, thermostats and security are standard features of 2026 renovations. However, the critical decisions are made during the electrical design phase, not when buying the devices. Installing hardwired computer networks with FTP cabling costs between €381.60 and €572.40 for a complete flat setup, while preparation for an EMS system ranges from €800 to €2,500. In this article, you will learn why wired networking is still worth it in the era of WiFi, the different levels of smart home systems available, and how to future-proof your electrical installation.

· 6 min· Reads: 3
Bathroom electrical installation: zones, permitted light fittings and safety rules

Bathroom Electrical Installations: Zones, IP Ratings and Safety Regulations

The bathroom is the most strictly regulated area in home electrics, the combination of water and electricity poses a risk that IEC 60364 based wiring standards address by dividing the space into specific zones. Installing and connecting a bathroom extractor fan costs between €56.20 and €84.20 in 2026, a recessed IP44 light fitting ranges from €18.30 to €27.50, and the entire bathroom circuit with RCD protection forms part of a full property rewiring or fit-out. In this article, you will learn which zones apply, which light fittings and sockets are permitted, and which common mistakes to avoid.

· 5 min· Reads: 4
LED lighting in a flat: installation costs for strips, spotlights, and chandeliers

LED Lighting in Flats: Installation Costs for Strips, Spotlights, and Chandeliers

LED lighting is now the standard for every renovation and new build, compared to traditional bulbs, it saves 80 to 90% in energy and lasts for 25,000 to 50,000 hours. In 2026, LED strip installation costs between €7.70 and €11.50 per linear metre, recessed spotlights with hole cutting cost €18.30 to €27.50 per unit, pendant chandeliers €41.90 to €62.90, and wall lights €13.40 to €20.20. In this article, you will find real-world installation prices for all types of light fittings, how to plan your lighting during a renovation, and which mistakes to avoid.

· 5 min· Reads: 6
Electrical installation condition report: cost, process and 5 mandatory tests

Electrical Installation Condition Report: Cost, Process and 5 Mandatory Tests

An electrical installation condition report confirms that the wiring in your flat or house is safe. You need one when a new installation is connected, after rewiring, and often when selling, letting or dealing with an insurer. An inspection of a flat costs roughly €205.90 to €308.90. This article explains when an inspection is required across Europe, which 5 tests it includes, how it works step by step and how to choose a qualified inspector.

· 6 min· Reads: 4
Cost of rewiring: complete price guide by property size

Cost of Rewiring: Complete Price Guide by Flat Size

Electrical installation is one of the most critical and technically demanding tasks in both renovations and new builds. A full electrical installation and fit-out for a 1-bedroom flat in 2026 costs on average €952 to €1,428, for a 3-bedroom flat €1,435 to €2,153, and for a 5-bedroom property €2,603 to €3,824. In this overview, you will find real market prices based on property size, what the fit-out includes, the differences between flats and houses, and how to hire a qualified electrician with the correct certifications.

· 7 min· Reads: 3
How to improve the security of your garden

How to improve the security of your garden

Owning a well designed and attractive home is something to be proud of, but security is even more important. Your home contains valuables you have worked hard for, as well as the people you care about most. For that reason, reliable locking systems should always be combined with additional security measures such as cameras or alarm systems.

· 3 min· Reads: 3,730
How to make your home more energy efficient

How to make your home more energy efficient

Upgrading your home to be more energy efficient is worthwhile for two major reasons. First, these improvements can significantly reduce your long-term energy costs and high household bills. Second, using less energy helps lower your overall impact on the environment and contributes to protecting our planet.

· 3 min· Reads: 1,775

New articles by email, once a month

Four useful reads before a renovation. No spam.