Flooring

Practical advice, work sequences and prices for your project.

11 articles

All articles

11 articles · Page 1/1
Resin flooring: cost per m², epoxy vs polyurethane comparison

Resin flooring: cost per m², epoxy vs polyurethane, substrate and common mistakes

Poured resin floors are an increasingly popular choice for renovating homes, garages and commercial spaces. This article explains the differences between epoxy and polyurethane, what makes up the price, what the substrate has to meet, how the job is done and what most often goes wrong in practice. Current prices are in the flooring work category.

· 9 min· Reads: 6
Common Mistakes When Removing Old Flooring and How to Avoid Them

Common Mistakes When Removing Old Flooring and How to Avoid Them

Removing old flooring is often the first step in a home renovation. While it may seem straightforward, inexperienced or rushed actions can cause serious problems. Damaged subfloors, excessive waste production, or inefficient material removal can prolong the renovation and increase costs. If you are planning to remove an old floor, it is crucial to avoid the most common mistakes and prepare properly for the work. This article explains how to handle demolition, provides approximate construction costs, and offers tips for choosing the right professionals.

· 4 min· Reads: 890
Choosing the Right Flooring for Every Room: Which Materials Work Best for the Living Room, Kitchen and Bathroom?

Choosing the Right Flooring for Every Room: Which Materials Work Best for the Living Room, Kitchen and Bathroom?

Flooring is one of the most heavily used elements in any interior, which makes choosing the right material essential. Each room has specific requirements, the living room needs comfort and visual appeal, the kitchen requires durability, and the bathroom must withstand high levels of moisture. In this article, we look at the most suitable flooring materials for different rooms while also considering installation and maintenance costs. You will also learn how to plan flooring works to achieve the best possible result.

· 3 min· Reads: 907
How to calculate the cost of flooring and floor installation? 5 key things to consider

How to calculate the cost of flooring and floor installation? 5 key things to consider

Choosing a new floor and having it professionally installed is a major step in renovating a flat, house or office. A clear and realistic cost calculation helps you avoid unnecessary stress, delays and unexpected expenses. This guide walks you through the entire process, from selecting the right material to the finishing details that often determine how long your new floor will last.

· 3 min· Reads: 736
Step by step: How to prepare a subfloor for floating floor installation

Step by step: How to prepare a subfloor for floating floor installation

Correct subfloor preparation is essential for the long-term performance and trouble-free use of a floating floor. Skipping or underestimating this stage often leads to deformation, squeaking and damage to the floor panels. In this article, you will learn how to prepare a subfloor for floating flooring step by step, using professional methods without unnecessary complications. Proper preparation directly affects the final appearance, stability and walking comfort of the entire floor.

· 4 min· Reads: 531
How to Install a Floating Floor: Correct Technique and Common Mistakes

How to Install a Floating Floor: Correct Technique and Common Mistakes

Installing a floating floor requires more than basic DIY skills. Every detail matters. An incorrectly installed floor may squeak, deform or separate over time. In this article, you will learn how professional installation works step by step, the differences between laminate, vinyl and engineered wood click flooring, and what to watch out for to avoid the most common mistakes.

· 4 min· Reads: 602
How Does Sanding an Old Parquet Floor Work? Process, Benefits and Common Mistakes

How Does Sanding an Old Parquet Floor Work? Process, Benefits and Common Mistakes

Renovating a parquet floor is an excellent way to refresh your interior while avoiding the high cost of a full floor replacement. Sanding, filling and varnishing parquet floors restores the natural beauty of the wood and improves resistance to everyday wear. This article explains how parquet floor sanding is carried out, why renovation is often a better option than replacement, and which mistakes should be avoided.

· 4 min· Reads: 472
Epoxy vs. Polyurethane Poured Flooring: Which Is More Cost-Effective for a Home or Office?

Epoxy vs. Polyurethane Poured Flooring: Which Is More Cost-Effective for a Home or Office?

Choosing the right flooring for a home or office can be challenging, especially when deciding between different types of poured floors. Epoxy and polyurethane poured flooring systems have distinct properties that affect not only the appearance of a space but also its functionality. While epoxy flooring up to 4 mm thick offers excellent resistance to scratching, polyurethane design flooring stands out for its flexibility and aesthetic appeal. So which option is better for your home or workplace? Let’s take a closer look at the advantages, disadvantages, and cost differences of these two popular solutions.

· 7 min· Reads: 465
Concrete floors and everything you need to know

Concrete floors and everything you need to know

Whether you are renovating your entire home or upgrading specific rooms, choosing the right flooring is one of the most important decisions you will make. Flooring has a major impact not only on the appearance of a space, but also on its practicality, comfort and long-term performance.

· 3 min· Reads: 2,778
Restoring Original Parquet Floors: Why Refurbishing Old Flooring Is Worth It

Restoring Original Parquet Floors: Why Refurbishing Old Flooring Is Worth It

Old wooden floors carry a unique character that is difficult to replicate in modern new builds. Restoring original parquet blocks is not only an environmentally responsible decision, but also an investment in the timeless beauty of your interior. A professionally refurbished wooden floor can often outperform brand new materials in both appearance and longevity.

· 4 min· Reads: 353

New articles by email, once a month

Four useful reads before a renovation. No spam.