Sheet metal work

Practical advice, work sequences and prices for your project.

2 articles

All articles

2 articles · Page 1/1
Rewiring a flat: costs, process, and when an upgrade is essential

Rewiring a Flat: Costs, Process, and Signs You Need an Urgent Upgrade

Replacing old electrical wiring is often the most delayed part of a renovation, yet outdated electrics are the leading technical cause of domestic fires. In 2026, a full rewire starts from €952 for a studio flat up to €3,824 for a 5-bedroom property, with chasing channels costing between €5.70 and €8.50 per linear metre and plastering repairs at €7.30 to €10.90 per linear metre. In this article, you will learn when a rewire is essential, the step-by-step process, real-world costs, and common mistakes to avoid.

· 5 min· Reads: 4
Reliable renovation of standing seam metal roofs

Reliable renovation of standing seam metal roofs

Standing seam metal roofs are among the most widely used roofing systems today. For new buildings, planning documentation is legally required and serves as the basis for proper execution. However, roof refurbishments and even complete roof replacements are often carried out without professional preparation or technical design.

· 12 min· Reads: 1,269

New articles by email, once a month

Four useful reads before a renovation. No spam.