Building work price list: Core Drilling Holes in Reinforced Concrete Panels up to 15 cm
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Concrete cutting cost | ||||
| Forming opening in RC panel up to 15 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Cutting RC panel up to 10 cm | lm | €35.00 / lm | lm | enter quantity- |
| Cutting RC panel up to 15 cm | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete walls up to 150 mm thick | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete floors up to 100 mm deep | lm | €25.00 / lm | lm | enter quantity- |
| Core drilling holes ø up to 100 mm | pc | €90.00 / pc | pc | enter quantity- |
| Core drilling holes ø 100-200 mm | pc | pc | - | |
| Core drilling holes ø over 200 mm | pc | pc | - | |
| Forming opening in RC panel up to 10 cm | pcs | €75.00 / pcs | pcs | enter quantity- |
| Installation of steel support structure (welded) | pcs | pcs | - | |
| Trimming metal door frames in RC up to 10 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Trimming metal door frames in RC up to 15 cm | pcs | €125.00 / pcs | pcs | enter quantity- |
| Chasing for services (electrical, water) | lm | lm | - | |
| Cutting out window or door opening | pcs | pcs | - | |
| Cutting opening in reinforced concrete panel | pcs | pcs | - | |
| Cutting asphalt surfaces | lm | €15.00 / lm | lm | enter quantity- |
What a hole up to 15 cm is for and how it is made
A round opening in a concrete panel is most often needed when refurbishing a flat in a large-panel block. Typical uses are a penetration for a waste or water pipe, cooker hood extract ducting, bathroom ventilation, air conditioning or a bundle of cables. Holes up to 15 cm are mainly used for larger pipes and ventilation ducting. For thinner services there is also a smaller version up to 10 cm. Both belong to the wider field of concrete cutting.
A core drill does not break concrete by impact. A tubular diamond core bit slowly grinds away a ring of concrete and then a whole concrete cylinder, the core, is removed from the wall. The panel does not vibrate and the area around the hole does not crack. The bit also cuts through steel reinforcement. That does not mean the reinforcement may be cut anywhere. A hole up to 15 cm in diameter usually hits several bars, and some floor panels are prestressed, where cutting the reinforcement is dangerous. The position of the hole must therefore be chosen with care.
Hole up to 10 cm or up to 15 cm: which one you need
The two options differ in the diameter of the core bit, and therefore in what can pass through the hole. The hole should always be slightly larger than the pipe or duct. The gap leaves room for a sleeve, seal or insulation and allows a small adjustment of position.
- A hole up to 10 cm is enough for cables, water pipes, smaller waste pipes, and air conditioning pipework, cable or condensate line. It is a smaller intervention in the panel and it is easier to find a suitable spot in dense reinforcement. Details are in the article on cutting a reinforced concrete panel up to 10 cm thick.
- A hole up to 15 cm is chosen for larger penetrations: cooker hood extract, ventilation ducting, the main bathroom waste or a pipe with thicker insulation. The bit cuts more reinforcement, so in a loadbearing wall the work must be assessed even more carefully.
Watch the borderline sizes. A hole up to 15 cm comfortably takes a standard 110 mm waste pipe with its seal, or 125 mm ventilation ducting. A 150 mm duct, used with more powerful cooker hoods, needs a larger bit than this item covers. Such an opening is dealt with separately, and with even more caution in a loadbearing structure.
Loadbearing walls, the managing agent and building control
In a large-panel block most walls and all floors are part of the structure of the whole building. Even a round hole in them affects a shared part of the building. Do not drill it yourself, and before booking anyone, speak to the managing agent, freeholder or residents' management company. A structural engineer's assessment is usually needed for a larger opening, for several holes close together or for drilling near the edge of a panel. With a hole up to 15 cm this caution matters even more than with the smaller version. Where a larger opening is formed instead, for example as part of cutting reinforced concrete panels for openings, windows and doors up to 15 cm, the engineer may specify the installation of a welded steel support structure in the cut opening.
Prestressed floor panels are a special case. Their reinforcement is tensioned during manufacture and carries most of the load. A cut prestressing wire or strand weakens the panel far more than an ordinary bar. Do not drill into a floor without a structural engineer first identifying the panel type and a safe position for the hole.
Whether your alteration needs approval under the building regulations or other consent should be checked with local building control. Do not assume in advance that no approval is needed.
If electrical cables may run in the wall, isolation and any rerouting must be carried out by a qualified electrician. The same principle applies to gas pipes near the drilling point: work starts only once their route has been confirmed. If a gas pipe is damaged despite this, leave the area immediately, do not operate any switches and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Any repair or rerouting of the gas pipe must then be carried out by a Gas Safe registered engineer.
What to settle before booking the drilling
The drilling itself is quick, but a mistake in the brief cannot be undone. A hole in concrete is permanent, so it pays to be clear on the following:
- Exact diameter. Measure the outside diameter of the pipe including insulation and sleeve, and check what hole size the ventilation or air conditioning manufacturer recommends. It often happens that a hole is drilled "to fit the pipe" and then the insulation or sleeve will not fit.
- Position and height. Mark the centre of the hole and think about where it will come out on the other side of the wall or floor. For a floor, also check the flat below so the hole does not come out into a light fitting, a cupboard or a riser.
- Direction and fall. Cooker hood extracts, ventilation and air conditioning condensate usually need a slight fall towards the outside so that water does not run back into the flat. A core drill can also drill at a slight angle, but this must be agreed in advance.
- Written consent from the managing agent or freeholder and, where relevant, a structural engineer's opinion, before the date is fixed.
- Agreement with the neighbours when drilling into a floor or a wall between flats. For a floor it helps to have access to the flat below to catch the water and the core.
- Who seals and makes good the penetration. Drilling usually does not include fitting the pipe, sealing or plastering around it.
How core drilling the hole works step by step
- Checking the position: the hole position is checked against the drawings or the planned pipe route, and the centre is marked.
- Checking for services: a detector is used to locate cables, pipes and reinforcement in the wall. Where possible, the hole is moved away from dense reinforcement. In homes built before 2000, have suspect materials around the drilling point tested first, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Protecting the surroundings: the floor and furniture around the drilling point are covered with sheeting, and for a floor also the area in the flat below the hole.
- Fixing the rig: the drill stand is fixed to the wall or floor with an anchor or a vacuum plate so that the bit does not wander. Floors are usually drilled from above, from the floor of the flat above the hole.
- Cooling and power: the water cooling is connected and a way of collecting water, or a slurry vacuum, is set up below the hole. As the machine works with water, it is connected through a residual current device, for example a portable PRCD, or into a socket on an RCD-protected circuit. Extension leads and connectors must not lie in water.
- Drilling: the bit is advanced slowly with even pressure. It gradually cuts through both concrete and reinforcement.
- Removing the core: the concrete cylinder is taken out. For a hole up to 15 cm it weighs several kilograms, and in a floor it drops downwards at the end, so the area below the hole must be clear and secured.
- Checking and cleaning up: the hole is cleaned, the diameter and direction are checked, and slurry and water are removed.
For a single hole in a typical panel the drilling itself is usually short. Preparation, fixing the rig and cleaning up take longer.
What affects the price
The guide labour price is €105.00 per hole. The final figure may differ depending on the following:
- Panel thickness. A thicker panel means longer drilling and more wear on the bit. Internal loadbearing walls in panel blocks tend to be thinner, while external sandwich panels with insulation are much thicker and take longer to drill. It is worth asking to what depth the price per hole applies.
- Amount of reinforcement. If the bit meets heavy bars, the work slows down and the bit wears faster.
- Wall or floor. A hole in a floor is more demanding than a horizontal hole in a wall. When drilling from above, the water and core must be caught in the flat below, and floor coverings often have to be lifted. Drilling upwards into a soffit is even harder in terms of fixing the rig and handling the water. Floors therefore tend to cost more than walls.
- Angled hole. Drilling with a fall or at an angle needs more precise setting of the stand and takes longer.
- Access and height. A hole right next to a corner, above kitchen units, in a narrow bathroom or high up near the ceiling makes fixing the stand harder and may need a scaffold tower.
- Furnished flat. Furniture, floors and plaster must be carefully protected from water and slurry, which adds time.
- Number of holes. Several holes in one visit are more efficient than separate call-outs. For a single hole, travel and setting up make up a large part of the price.
- What is included. Removal of the core and slurry, service detection, sealing the penetration and making good are often separate items. When comparing quotes, check exactly what each one covers.
How to prepare the flat for drilling day
The work goes more smoothly if the area around the wall is cleared, the floor is covered and water and power are easy to reach. In particular, it helps to have:
- the centre of the hole marked on the wall and a piece of the pipe, or its exact size, on site so the diameter can be checked straight away,
- furniture moved and belongings put away at least a few steps from the drilling point,
- a socket and a water supply nearby,
- information for the operative on where to park and whether the lift works, as the drill and stand are heavy,
- for a floor, the neighbour at home at the agreed time.
The work takes longer if the hole position is only decided on the day, if there is a wait for the neighbour or the managing agent, or if the service check shows the hole must be moved and nobody knows where to. As the work is noisy, it is worth checking the building rules for permitted working hours.
Common mistakes and how they show up later
A hammer drill or breaking out instead of core drilling. The impacts break up the edge of the hole, can cause cracks and damage the reinforcement. The hole ends up ragged and larger than needed, and making good around it becomes difficult.
Drilling without checking for services. A drilled-through cable or pipe turns one hole into a costly repair, often in the neighbouring flat as well.
Drilling into a floor without a structural engineer. In a prestressed panel, cut reinforcement can reduce the load capacity of the floor. This only shows later as cracking or deflection, and the repair is complicated.
Wrong diameter. Insulation will not fit in a hole that is too small, and a hole that is too large weakens the panel unnecessarily. For ventilation and cooker hoods, a smaller hole also means poorer airflow.
Rig not fixed. The bit slips, the hole is angled or oval, and it comes out on the other side in the wrong place.
Hole without a fall. With a cooker hood extract or condensate line, water runs back into the flat and damp patches appear on the wall around the penetration.
Underestimating the water. Cooling slurry seeps under the floor or into the flat below, especially when drilling a floor. It shows as stains on the neighbour's ceiling or a damp floor for days afterwards.
Penetration left unfilled. The gap around the pipe lets through noise, smells and, in a fire, smoke. Penetrations between flats and through floors are therefore sealed with a suitable material, and fire-rated material where they pass through a fire compartment. In an external wall an unsealed penetration lets in cold and, in rain, water.
How to check the finished hole at handover
Inspect the hole before the pipe is fitted and the wall is made good. Defects are harder to put right later.
- the hole is in the agreed position and at the height shown on the sketch,
- the diameter suits the pipe including insulation or sleeve, ideally tested with an actual piece of pipe,
- the hole is straight or has the agreed fall, without noticeable deviation, and comes out on the other side where it should,
- the edges are clean, with no broken-off pieces and no cracks around the hole,
- any cut reinforcement was approved by the structural engineer in advance, where this was required,
- nearby services are undamaged and working,
- slurry and water have been removed, including from the floor and the area below the hole,
- the core and concrete waste have been taken away, or it is clear who will dispose of them. If someone else removes the waste, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
Frequently asked questions
The guide price is €105.00 per hole. The final figure depends on the panel thickness, the amount of reinforcement, whether a wall or a floor is drilled, access to the location and the number of holes drilled in one visit.
This is not advisable. Neither a hammer drill nor an angle grinder will produce a clean hole of this diameter in reinforced concrete, and the impacts can damage the panel. It is also part of the building's structure, so this work belongs with a specialist using a core drill.
With wet core drilling, hardly any. The water binds the dust and cools the bit. Instead of dust there is slurry, which must be collected and cleaned up.
With a small hole away from the panel edge this commonly happens in practice. A hole up to 15 cm, however, usually cuts several bars, so its position should be assessed in advance and as little reinforcement as possible should be cut. With prestressed floor panels a structural engineer must always decide.
It cannot be seen by eye. A structural engineer identifies the floor panel type from the building's design documents, which the managing agent or freeholder usually holds, or from an investigation on site.
In a block of flats, yes, because you are drilling into the shared structure of the building. Whether approval under the building regulations is also needed can be confirmed by local building control.
The drilling itself usually takes from a few minutes to several tens of minutes, depending on the panel thickness and reinforcement. Preparation, fixing the rig and cleaning up come on top of that. Check the duct diameter in the cooker hood or ventilation instructions before booking so the hole does not have to be drilled again.
Related work
How a reinforced concrete panel up to 10 cm thick is cut, what to prepare before the cutter arrives, how linear metres are measured and how to check the work.
How door and window openings are cut in reinforced concrete panels up to 15 cm thick, when you need a structural engineer and how to check the result.
How a welded steel frame is fitted in a new opening in a load-bearing wall, what the structural engineer decides and how to check the finished work.
How a steel door frame is cut out of a reinforced concrete wall up to 10 cm thick, what to prepare, what to watch for in a flat and how to check the work.
How a metal door frame cast into a concrete panel up to 10 or 15 cm thick is cut out, what affects the job and how to check the result.
How a hole up to 10 cm is core drilled through a reinforced concrete panel, what to agree first and how to check the finished opening.