Building work price list: Cutting Reinforced Concrete Panels (Openings, Windows, Doors) up to 15 cm
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Concrete cutting cost | ||||
| Cutting RC panel up to 15 cm | lm | €50.00 / lm | lm | enter quantity- |
| Cutting RC panel up to 10 cm | lm | €35.00 / lm | lm | enter quantity- |
| Cutting concrete walls up to 150 mm thick | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete floors up to 100 mm deep | lm | €25.00 / lm | lm | enter quantity- |
| Core drilling holes ø up to 100 mm | pc | €90.00 / pc | pc | enter quantity- |
| Core drilling holes ø 100-200 mm | pc | pc | - | |
| Core drilling holes ø over 200 mm | pc | pc | - | |
| Forming opening in RC panel up to 10 cm | pcs | €75.00 / pcs | pcs | enter quantity- |
| Forming opening in RC panel up to 15 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Installation of steel support structure (welded) | pcs | pcs | - | |
| Trimming metal door frames in RC up to 10 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Trimming metal door frames in RC up to 15 cm | pcs | €125.00 / pcs | pcs | enter quantity- |
| Chasing for services (electrical, water) | lm | lm | - | |
| Cutting out window or door opening | pcs | pcs | - | |
| Cutting opening in reinforced concrete panel | pcs | pcs | - | |
| Cutting asphalt surfaces | lm | €15.00 / lm | lm | enter quantity- |
When a panel is cut and what a thickness of up to 15 cm means
The usual reasons are a new door, a window, an opening between rooms or a service penetration. This work is ordered mainly during the refurbishment of flats in large-panel concrete blocks, for example to open the kitchen into the living room, move a doorway or widen an existing opening.
The panel contains steel reinforcement, so ordinary tools cannot cope with it. A diamond blade cuts through the concrete and the steel in one pass. The cut is straight and the surrounding panel barely vibrates, which is not possible when breaking out with a hammer.
This item covers panels up to 15 cm thick. In panel buildings these are often load-bearing walls, so the structural side must be handled carefully. At this thickness the wall is usually cut from both sides and the two cuts must meet exactly. Thinner panels and partitions up to 10 cm are priced separately, see cutting a reinforced concrete panel up to 10 cm thick, and so is the job of cutting out an old steel door frame in a thinner wall.
There is no need to guess the thickness. It can be measured in an existing opening, for example at a door frame, or found in the building drawings, which the managing agent or freeholder usually holds. Plaster or skim on both faces adds a few millimetres and is cut as well. If the total comes out just over 15 cm, the job falls into a different price band.
Load-bearing wall or partition: structure and approval
This question decides the whole job. A load-bearing panel carries loads from the floors above. Cutting an opening in it without a design can lead to cracks, sagging above the opening and, in the worst case, stability problems for a whole section of the building.
Load-bearing walls tend to be thicker and partitions thinner, but thickness alone is not proof. A reliable answer comes from the building drawings and a structural engineer. Where a load-bearing wall is involved, the engineer specifies the size and position of the opening and usually a steel strengthening, such as a frame or lintel made from steel sections. This is a separate job - installation of a welded steel support structure in a cut opening.
In a flat this is never only the owner's decision. Work to the structure must be agreed in advance with the freeholder, managing agent or residents' management company, and the lease often requires written consent. Structural alterations generally also fall under the building regulations, so contact your local building control before ordering the work. In Scotland, structural alterations, extensions and loft conversions need a building warrant from the council before work starts. Do not assume that a simple notification will be enough.
What to decide before placing the order
The contractor cuts what is marked on the wall. The brief is responsible for the correct size and position of the opening. Before the first visit, clarify the following:
- The exact size of the opening. It depends on what goes into it: a timber lining, a steel frame, a window or just a bare opening. The door or window manufacturer states the fitting tolerance. Choose the door before cutting starts.
- Finished floor level after refurbishment. A new screed or floor covering changes the height from floor to the head of the opening. A wrong height means either extra cutting or building the opening back down.
- Position relative to corners and ceiling. In a load-bearing wall the structural engineer decides how close the opening can be to a corner or the ceiling. In a partition the choice is yours, but it is still worth leaving room beside the opening for furniture and light switches.
- Who arranges the structural design and propping. Some firms include it, others only cut and the steelwork is supplied by another contractor. Agree this in writing.
- Who removes the concrete. A cut-out section of a 15 cm panel for a standard door weighs roughly 650 kg. Agree in advance whether the cutting firm carries it out and takes it away, or whether you arrange this yourself.
- Timing and neighbours. Cutting is noisy. Choose the day and time according to the building rules or lease and warn the neighbours beforehand, otherwise complaints to the managing agent are likely.
How the opening is cut
- The contractor visits the site, checks the panel thickness and, for a load-bearing wall, asks for the structural engineer's design. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- The opening is marked out accurately on the wall to suit the door or window, with an allowance for fitting the frame or lining.
- The line of the cut is checked for electrical cables, water, gas or heating pipes. These are isolated or rerouted.
- For a load-bearing wall, the ceiling is propped before cutting and the steel strengthening is installed as designed by the engineer.
- The surroundings are covered with polythene sheeting and the floor is protected against water and slurry.
- Core holes are drilled in the corners of the opening so that the cut does not overrun beyond it.
- The panel is wet cut with a diamond blade, usually from both sides. The cuts must meet exactly.
- The cut-out block is cut into smaller pieces that can be carried out safely. The pieces must not be allowed to fall uncontrolled onto the floor.
- Finally the slurry is removed, the edges are cleaned and the waste is taken away.
The edges after a diamond cut are straight, but they leave bare concrete and cut ends of reinforcement. The steel should be treated with an anti-corrosion primer as soon as possible, otherwise it starts to rust and the rust can later bleed through the plaster or spall the concrete. Treating the reinforcement, making good the reveals, fitting the frame and plastering around the opening are separate jobs.
Which equipment is used
A handheld diamond saw is the most common choice in flats. It is mobile, fits into smaller rooms and with water cooling cuts fairly cleanly. At thicknesses up to 15 cm it is usually used from both sides.
A track-mounted wall saw is used for larger openings and where a perfectly straight edge matters. Running on a track gives an accurate cut with less vibration. The blade is round, so at full depth it either stops short of the corner or overruns past it. An overcut beyond the corner weakens the panel, so the corners are drilled first or finished by hand.
Diamond core drilling suits round penetrations for pipes, cables or ventilation and the corners of rectangular openings. It is not used to form the door opening itself.
An angle grinder with a diamond disc is suitable only for small adjustments and trimming. It does not reach deep, produces a lot of dust and leaves rough, uneven edges.
What the price depends on
The price is calculated per running metre of cut, meaning the length of the line the blade travels, not the area of the opening. The guide price for the labour is €50.00 per running metre.
Worked example: for a door opening of 0.9 × 2.0 m, the two sides, the head and the bottom edge are cut, roughly 5.8 running metres in total. If the firm counts the cut from each side of the panel separately, it can come to around 11.6 running metres. Cutting the block into pieces adds further cuts, for example three horizontal cuts across the 0.9 m width add about 2.7 running metres. When comparing quotes, ask how the firm measures and whether cutting up the block, corner drilling and removal are charged separately.
The main factors affecting the price are:
- Cutting from both sides. Common at thicknesses up to 15 cm. Depending on how it is measured, it can double the cut length on the invoice.
- Load-bearing wall. A structural engineer, propping and installing the steel strengthening are added. These often cost more than the cutting itself and are not included in the rate per running metre.
- Density of reinforcement. More steel slows the cut and wears the blade faster. Reinforcement tends to be denser around the edges of the panel and around original openings.
- Access. A narrow hallway, an upper floor without a lift or little space around the wall lengthen both preparation and carrying out the pieces.
- Cuts next to the ceiling, floor or a corner. The saw is harder to position there, so other equipment and corner drilling are often needed.
- Accuracy required. If a perfectly straight edge without further making good is wanted, a track-mounted wall saw is used, which takes longer to set up.
- Small jobs. For a single short cut, travel and equipment set-up make up a large part of the price, so firms often apply a minimum call-out charge.
What makes the work easier and what slows it down
- Water and power on site. Wet cutting needs a water supply and slurry extraction. If these are missing, an alternative has to be found. It helps to know where the nearest tap and a working socket are, and to check in advance what supply the machine needs.
- Services rerouted in advance. Moving a cable or pipe is a separate job for a qualified electrician or plumber, and gas work is always for a Gas Safe registered engineer. If this is done before the cutters arrive, nobody has to wait.
- Skip or bulk bags for waste. Reinforced concrete is heavy and does not belong in household waste. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. A skip booked in advance shortens the whole day.
- Cleared space. Both sides of the wall need free space for the saw, the props and stacking the pieces. Furniture that cannot be moved out should be covered.
- Documents ready beforehand. The structural engineer's design, consent from the freeholder or managing agent and any building control approval should be in place before the start date. Otherwise the firm arrives and cannot begin.
- Lift and stairs. It is worth knowing whether the lift can take the concrete pieces and whether it needs protecting. Agreeing this with the managing agent avoids disputes.
- Sealed-off rooms. Taped doors to other rooms and a clear route to the entrance speed up both the work and the clean-up.
Typical mistakes and how they show up later
Cutting without a structural engineer. A wall is sometimes treated as a partition just because it "looks thin". The consequences may only appear months later as cracks above the opening, cracking in neighbouring flats or a sagging ceiling. The repair is usually far more involved than a design done beforehand.
Inaccurate marking out. An opening without an allowance for the frame or lining leads to extra cutting. An opening that is too large leads to building it back, which can later show as a crack at the junction between the concrete and the new material.
Cut services. A cable or pipe inside the panel cannot be seen from outside. A cut cable can cause a power cut for the neighbours too, and a cut pipe can cause a flood.
Overcuts at the corners. The blade leaves a cut beyond the opening in the corner, which weakens the panel unnecessarily. A diagonal crack often starts from exactly such an overcut.
Cuts from both sides that do not meet. A step remains in the edge of the opening, which has to be broken back and repaired. The frame then does not sit straight.
Untreated reinforcement. The cut ends of the steel are covered with plaster without primer. Over time rust stains appear on the reveal or the plaster starts to flake.
Dry cutting in an occupied flat. Fine concrete dust gets everywhere and is harmful to health. It settles in furniture and ventilation for weeks. Wet cutting or extraction with a suitable filter is essential.
Unsupported block. A heavy cut-out section can damage the floor or injure someone if it falls in one piece. The impact can also be transmitted into the ceiling below.
How to check the finished opening
Before signing off, inspect the opening in good light with a spirit level in hand. For a load-bearing wall, ideally the structural engineer or a site supervisor should also attend the handover.
- Dimensions. The opening matches the agreement and leaves an allowance for the frame or lining.
- Plumb and level. The edges are vertical and horizontal, checked with a spirit level.
- Meeting of cuts. The cuts from both sides meet without a step and there are no overcuts beyond the opening at the corners.
- Surrounding panel. There are no new cracks or broken-off pieces around the opening.
- Strengthening. The steel frame or lintel is installed as designed by the structural engineer.
- Reinforcement at the edges. It is agreed who will treat the cut steel against corrosion and when, if this is not part of the job.
- Services. Nearby services are undamaged and working.
- Clean-up. Slurry and dust are removed, the floor and furniture are undamaged and the waste has been taken away.
- Documents. You have the structural engineer's design and the paperwork needed for building control.
- Invoicing. The invoice or handover record states the measured cut length in running metres, and it matches the agreed method of measurement.
Further work of this kind is described in the overview of concrete cutting.
Frequently asked questions
As a guide, €50.00 per running metre of cut. The final amount depends mainly on the density of reinforcement, access to the wall, cuts next to the ceiling or in a corner, and whether the cut from both sides is counted. The structural engineer, propping, steel strengthening and concrete removal are usually charged separately.
It is not advisable. It is work to the structure of the building, it involves heavy equipment and dust, and a load-bearing wall needs a structural engineer and consent from the freeholder or managing agent. This work is best left to a firm with diamond cutting equipment.
Most reliably from the building drawings, usually held by the managing agent or freeholder, and from a structural engineer's assessment. Wall thickness is only a rough indication, not proof.
It depends on which part of the structure is affected. Structural alterations generally fall under the building regulations, so ask your local building control before work starts. In a block of flats, consent from the freeholder or managing agent under the lease is also needed.
The cutting itself usually takes a few hours, depending on the reinforcement, access and equipment. Preparation, propping, installing the steel strengthening and removing the waste often take longer.
With wet cutting the dust is bound in the water and mainly slurry is produced, which is vacuumed or collected. It is still a good idea to cover the surroundings with polythene and seal off the other rooms.
The cut reinforcement at the edges must be treated against corrosion. Then the reveals are made good, the frame or window is fitted and the surrounding area is repaired and plastered. These jobs are not part of the cutting, so order them separately or agree them in a single quote.
Related work
How a reinforced concrete panel up to 10 cm thick is cut, what to prepare before the cutter arrives, how linear metres are measured and how to check the work.
How a welded steel frame is fitted in a new opening in a load-bearing wall, what the structural engineer decides and how to check the finished work.
How a steel door frame is cut out of a reinforced concrete wall up to 10 cm thick, what to prepare, what to watch for in a flat and how to check the work.
How a metal door frame cast into a concrete panel up to 10 or 15 cm thick is cut out, what affects the job and how to check the result.
How a hole up to 10 cm is core drilled through a reinforced concrete panel, what to agree first and how to check the finished opening.
How core drilling through a reinforced concrete panel works, when a 10 cm hole is enough, when you need 15 cm and what to check in a block of flats.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.