Building work price list: Installation of Steel Support Structure (by Welding) in a Cut Opening
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Concrete cutting cost | ||||
| Installation of steel support structure (welded) | pcs | €350.00 / pcs | pcs | enter quantity- |
| Cutting RC panel up to 10 cm | lm | €35.00 / lm | lm | enter quantity- |
| Cutting RC panel up to 15 cm | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete walls up to 150 mm thick | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete floors up to 100 mm deep | lm | €25.00 / lm | lm | enter quantity- |
| Core drilling holes ø up to 100 mm | pc | €90.00 / pc | pc | enter quantity- |
| Core drilling holes ø 100-200 mm | pc | pc | - | |
| Core drilling holes ø over 200 mm | pc | pc | - | |
| Forming opening in RC panel up to 10 cm | pcs | €75.00 / pcs | pcs | enter quantity- |
| Forming opening in RC panel up to 15 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Trimming metal door frames in RC up to 10 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Trimming metal door frames in RC up to 15 cm | pcs | €125.00 / pcs | pcs | enter quantity- |
| Chasing for services (electrical, water) | lm | lm | - | |
| Cutting out window or door opening | pcs | pcs | - | |
| Cutting opening in reinforced concrete panel | pcs | pcs | - | |
| Cutting asphalt surfaces | lm | €15.00 / lm | lm | enter quantity- |
What the steel structure in a new opening does
When a new opening is cut into a load-bearing wall or concrete panel, for example a doorway between kitchen and living room, the wall above loses part of its support. A steel support structure takes over that job. It is a lintel or a complete frame made from steel sections, welded on site, fixed into the wall and designed to carry the load around the opening. It is often described as structural support for the opening. In concrete panel blocks of flats it is usually a steel frame fitted into the panel. For how this fits into the wider process, see the overview of concrete cutting.
It is needed whenever a structural engineer assessing work on the load-bearing structure decides the opening has to be strengthened. In concrete panel blocks this applies to almost every new or enlarged opening in a load-bearing panel. The structure then stays in the wall permanently. Once plastered or boxed in, it is normally hidden, but it still carries part of the building above.
A non-load-bearing partition is a different case. A standard lintel, or none at all, is usually enough there. However, whether a wall is load-bearing cannot be judged by its thickness or by how it sounds when tapped. The building drawings or a structural engineer must decide.
What to arrange and decide before installation
Structural engineer's assessment or design
A steel structure is not designed by eye. The size of the sections, the fixing method and whether a lintel is enough or a full frame is needed are set by a structural engineer in a report or design. The engineer assesses the wall type (reinforced concrete panel, brick, aerated concrete block), the load from the floors above and the position of the opening in relation to panel edges and other openings. The installer should work to this design. If the installer proposes something different, the engineer must approve the change.
Consent from the building owner and building control
In a block of flats, contact the freeholder, managing agent or management company before any work starts. Work on a load-bearing wall affects the whole building, and most leases require written consent for structural alterations. Structural alterations to load-bearing walls are subject to building regulations, so check with local authority building control or an approved inspector what approval is needed before work begins. In Scotland, structural alterations, including building or removing load-bearing walls, need a building warrant from the council before work starts, and starting without one is an offence. If the wall is shared with a neighbour, party wall procedures may also apply. Do not assume that no approval is needed.
Qualified welder and fire safety
Welding is hot work involving open flame and sparks. It should be carried out by a qualified welder. Welding in an occupied residential building carries an increased fire risk, so a hot work permit should be issued in advance and a person appointed to act as fire watch. Combustible materials are removed from the area, gaps and openings in the floor are covered, and a fire extinguisher must be at hand. After welding has finished, the area and adjoining rooms are checked for several hours, because insulation or dust can smoulder unseen.
How the opening will look when finished
It pays to know in advance what will be fitted into the opening and how the steel will be covered. Sections fixed to both faces of the wall make it thicker at the opening by their own width plus the plaster or lining. This affects the choice of door lining and architrave, which must cover the full thickness. Decide in advance whether the opening is to be plastered, lined with plasterboard or simply covered by the door lining. The installer can then position the sections so that the finishing work does not need to be redone.
Step-by-step installation
The exact sequence is set by the structural engineer. In concrete panels, the structure is often fitted after the opening has been cut. The procedure below describes this variant. Elsewhere, especially in masonry walls, a slot is first cut above the future opening, the lintel is inserted and grouted in with mortar. The wall below is only cut once the grout has cured and the lintel is carrying the load.
- Setting out: the opening and the position of the sections are marked out according to the design. Services in the wall are checked. In homes built before 2000, have suspect materials tested before you drill or cut; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. If electrical cables need rerouting, this is done by a qualified electrician.
- Propping: if the engineer specifies it, the ceiling or wall above the future opening is supported with adjustable steel props.
- Pre-drilling corners: core holes are drilled at the corners of the opening before cutting. Each cut then ends exactly in a hole and does not overrun the corner, so no cracks form.
- Cutting: the opening is cut between the pre-drilled corners with a diamond wall saw or wire saw, as for cutting a reinforced concrete panel up to 10 cm thick or cutting reinforced concrete panels up to 15 cm.
- Cleaning the edges: the edges of the opening are cleaned of dust and loose pieces of concrete.
- Fitting the sections: the steel sections are placed on one or both faces of the wall, aligned flush, levelled and temporarily secured.
- Welding: the sections are welded together at the corners into a frame and the welds are cleaned of slag. Welding is done before chemical anchors are installed. Heat from welding would damage the resin in anchors close to the weld. If welding near anchors already fitted, they must be far enough from the weld or protected from heat.
- Fixing: holes are drilled for anchors or through-bolts and the sections are fixed according to the design.
- Filling gaps: gaps between the steel and the wall are filled with non-shrink mortar or grout so that the section bears on its full surface.
- Removing props: props are removed only after the grout and anchors have cured and the work has been checked.
- Protection and finishing: the steel is painted with anti-corrosion primer, especially the welds. The surface is prepared for plaster or lining.
What the structure is made of
Steel sections
Lintels and frames are made from hot-rolled sections. Channels, such as parallel flange channels (PFC), are very common in concrete panels. They can be fixed to both faces of the wall and clamped together with through-bolts. Universal beams and columns (UB, UC) are chosen for wider spans and heavier loads, where a stiffer beam is needed. Steel angles are used mainly for smaller openings or as secondary members. The section type and size come from the calculation, not from what happens to be in stock.
Fixings
The sections are fixed to the wall with chemical anchors, mechanical anchors or threaded rods passing through the wall and tightened from both sides. Chemical anchors hold well in concrete and solid masonry. However, they need clean drilled holes and curing time according to the manufacturer, and they do not tolerate overheating. In hollow bricks, mesh sleeves are used, otherwise the resin runs into the voids.
Welds and corrosion protection
Welding turns the individual sections into one rigid unit. Welds must be continuous wherever the design specifies, not just tack welds. After welding, the joints are cleaned and painted, because rust starts first at the welds.
What affects the price of installing a steel structure in an opening
The guide labour price in the price list is €350.00 per piece. The price list treats one structure as one piece. Contractors charge in different ways, though. Some price the installation by the weight of steel in kilograms, others charge separately for welding, fixing and materials. When comparing quotes, work out exactly what is being paid for. The main factors that make two similar-looking openings cost different amounts are:
- Span of the opening and size of sections: a larger opening means longer, heavier sections. They have to be carried in and held in place during installation, often by several people. Wide openings with universal beams or columns cost noticeably more than a standard doorway.
- Lintel or full frame: a lintel alone is simpler. A frame with posts at the sides means more welds, more anchors and more precise alignment.
- One or both faces of the wall: sections on both faces clamped with through-bolts mean twice the material to fit and drilling through the full wall thickness.
- Wall type and thickness: drilling is slower in thick reinforced concrete with dense reinforcement. Hollow bricks need mesh sleeves and more care with fixing.
- Propping: if propping is needed over several floors or the props must stay longer, both the number of props and the time they are on site increase.
- Access and space: an upper floor, a small lift the sections will not fit into, or a cramped flat with no room to manoeuvre all lengthen the job.
- Services in the wall: if electrics, water or heating pipes must first be rerouted, this is extra work, often by another trade.
- Complexity of shape: sloping or irregular reveals and a non-standard frame need more cutting and adjusting of sections on site.
- What the price includes: ask whether it covers the steel, anchors, non-shrink mortar and anti-corrosion paint. Also check whether cutting the opening, propping, fire watch and removal of rubble are charged separately. Before rubble is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
What makes the job easier and what slows it down
Apart from the structure itself, much depends on how the property is prepared. The job is easier with:
- the structural engineer's design sent to the installer in advance, and the freeholder's or managing agent's consent in hand before the first day,
- a cleared and protected area, with no furniture, carpets or curtains near the opening,
- agreed times when noisy work and welding are allowed in the building, and neighbours informed in advance,
- an agreed supply point for power to the saw and welder and water for cooling during cutting,
- a heated property, so there is no wait for the room to warm up.
The job takes longer if it turns out on site that the design or hot work permit is missing, or that welding cannot go ahead because combustible items have been left nearby. Bear in mind too that while the props are in place, other work in the room cannot continue.
Typical mistakes and how they show up later
A different or lighter section than the engineer specified. It gets used because it was to hand. The lintel may deflect over time and cracks appear in the wall above the opening. In a load-bearing panel this concerns the safety of the whole building, not just appearance.
Cutting without propping, or with cuts overrunning the corners. The panel is weakened and diagonal cracks spread from the corners of the opening. Reinforcement cut beyond the corner is not easy to repair.
A section that does not bear on the wall across its full surface. The gap was not filled with mortar, so the load is transferred through only a few points. The wall can crush under the section and the plaster around the opening cracks.
Anchors in uncleaned holes, loaded before curing or overheated by welding. The resin does not bond across the full surface and the anchor can work loose. It cannot be seen at first glance and only shows once the structure moves.
Tack welds instead of continuous ones, frame corners not fully welded. The frame is not the rigid unit the calculation assumed. A weld can crack under load.
Welding without protecting the surroundings and without checks afterwards. The result can be scorched floors, smoke in neighbouring flats and, at worst, a fire. Smouldering debris can ignite hours after the welder has left.
Missing anti-corrosion paint. This does most damage at the welds and in areas later covered with plaster. Rust increases the volume of the steel, pushes the plaster off, and brown stains and cracks appear on the surface.
Working in an unheated space. If temperature limits are ignored, mortar and resin do not cure properly. The anchors and grout then lack the strength the engineer assumed.
Props removed too early. This is one of the most dangerous mistakes. The structure takes the full load before it is able to carry it.
How to check the finished work at handover
At handover, go through these points, ideally before the structure is covered with plaster. Most of them will not be visible later.
- the sections match the structural engineer's design in type, size and position,
- the lintel or frame is level and flush with the wall,
- anchors or bolts are in the specified number and tightened,
- welds are continuous, free of cracks and slag, and the frame corners are fully welded,
- the gap between steel and wall is filled and the section does not stand proud anywhere,
- all steel, including welds, has anti-corrosion paint,
- there are no new cracks above or around the opening and no cuts overrun the corners,
- props were removed only after the grout had cured and with the approval of the responsible person,
- the surroundings have been checked after welding, with no smouldering debris or scorch marks,
- the structural engineer's design or report and a record of the work carried out are available,
- for larger alterations, it is worth having the engineer inspect the structure before it is covered.
Keep photos of the structure before it is covered with the property documents. When selling or renovating again, they show what is hidden in the wall.
Frequently asked questions
The guide price in the price list is €350.00 per piece. The final price depends on the span of the opening, the size of the sections, the wall type, the need for propping and access to the site. If a contractor charges by the kilogram of steel, convert the quote to the whole structure so it can be compared.
Yes. Widening a doorway in a load-bearing wall is also work on the load-bearing structure. The engineer assesses whether the original lintel is sufficient or a new steel frame is needed, and the procedure is the same as for a new opening. If an old steel door frame is in the way, it is usually removed first, as described for cutting out steel door frames in reinforced concrete walls up to 10 cm.
Welded corners join the sections into one rigid frame that carries the load around the opening better. Bolted connections are also used, but only where the structural engineer designs them that way.
Until the grout and anchors have cured according to the manufacturer's data and the structural engineer or site manager confirms they can be removed. The time depends on the mortar and resin used and the temperature in the property.
Usually not. After anti-corrosion painting, the structure is plastered, lined with plasterboard or covered by the door lining, so the opening looks like an ordinary opening.
Yes. Work should not start without consent from the freeholder or management company and without checking the approval route with building control.
It is not suitable for DIY. It is work on the load-bearing structure of the building, requiring a structural engineer's design, a qualified welder and proper fire safety. A mistake affects the whole building, not just one flat.
Related work
How a reinforced concrete panel up to 10 cm thick is cut, what to prepare before the cutter arrives, how linear metres are measured and how to check the work.
How door and window openings are cut in reinforced concrete panels up to 15 cm thick, when you need a structural engineer and how to check the result.
How a steel door frame is cut out of a reinforced concrete wall up to 10 cm thick, what to prepare, what to watch for in a flat and how to check the work.
How a metal door frame cast into a concrete panel up to 10 or 15 cm thick is cut out, what affects the job and how to check the result.
How a hole up to 10 cm is core drilled through a reinforced concrete panel, what to agree first and how to check the finished opening.
How core drilling through a reinforced concrete panel works, when a 10 cm hole is enough, when you need 15 cm and what to check in a block of flats.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.