Building work price list: Installation and Fixing of Wooden Stair Treads with Risers
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Stairs and balustrades cost | ||||
| Install stair treads with risers | pcs | €95.00 / pcs | pcs | enter quantity- |
| Install stair treads | pcs | €65.00 / pcs | pcs | enter quantity- |
| Sand stair treads + 3 coats varnish | pcs | pcs | - | |
| Install timber handrail | lm | €15.00 / lm | lm | enter quantity- |
What fitting treads with risers involves
Fitting stair treads means a joiner bonds and fixes timber treads onto a finished concrete or steel staircase. With the riser option, vertical boards are also fitted between the steps, so each step is covered in timber on every visible face. This is done in new builds while the stair is still bare concrete, and in renovations where old terrazzo or tiles are worn out. The structural staircase stays in place. Only the surface you walk on changes.
The tread is the horizontal board you step on. The riser is the vertical board beneath it that covers the concrete face of the step. The price is quoted per piece, meaning one finished step made up of a tread and a riser. For a budget you only need to count the steps, not square metres.
Treads with or without risers: the difference
Price lists usually show two similar items: fitting timber treads only, and fitting treads with risers. The difference is what remains visible.
- Treads only: timber is laid on the horizontal surface only. The concrete step faces need another finish, such as plaster, skim or paint. This option is simpler and quicker. More detail is in the guide to fitting timber stair treads.
- Treads with risers: the vertical face is also clad in timber, so the staircase looks like one piece. More measuring and scribing is needed, because the joint between tread and riser is clearly visible and must be free of gaps.
Why choose risers? They hide uneven concrete faces, protect them from scuffing by shoes and are easier to keep clean. On a steel staircase without faces, they also close the open space between steps, which families with small children tend to appreciate. Risers can be in the same timber as the treads, in a contrasting species or in painted MDF, which works well with white doors and linings.
What to decide before the joiner comes to measure
Treads and risers are made to measure, so changes after manufacture are expensive or impossible. Before the survey it is worth being clear on the following:
- finished floor levels at the bottom and top, meaning what floor finish will be used and how thick it will be,
- timber species and type of tread, solid or engineered, and the colour or shade,
- riser material, the same timber, a contrasting species or painted MDF,
- nosing profile and overhang of the tread over the riser, square or rounded edge,
- finish, lacquer, oil or hardwax oil, and whether an anti-slip finish is required,
- stair lighting, if wanted. The wiring must be run before fitting by an electrician working to BS 7671:2018+A4:2026, the current IET Wiring Regulations. A new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. The joiner then only routs the grooves or cut-outs,
- balustrade, meaning whether the existing one stays, is removed, or a new one will be fixed into the treads, the stair string or the wall. A new wooden handrail for the balustrade should be planned at this stage.
Floor levels matter because the timber cladding raises the whole staircase by the thickness of the tread. If all treads are the same thickness, the intermediate steps keep the same rise as before. Only the first step from the lower floor becomes higher, and the last step at the upper floor becomes lower, unless this is allowed for when the floors are designed. All rises should be equal, which is also a basic requirement of building regulations for stair geometry.
Step depth needs the same attention. The riser thickness takes up part of the original going of the concrete step, and the tread overhang moves the nosing forward. On narrow concrete steps this can leave less room for the foot, and the first step projects further into the room. During the survey the joiner should check that the stair will still be comfortable and safe to use once clad, and choose the riser thickness and overhang accordingly.
Cladding a concrete staircase in timber: material, thickness and finish
Hardwood is used for stairs, most often oak, followed by beech or ash. Oak resists wear well and has a pronounced grain. Beech is slightly softer and more sensitive to moisture.
- Solid treads, in one piece or glued from staves, can be sanded and refinished several times in the future.
- Engineered treads, made of several layers, are more dimensionally stable and less prone to twisting, so they suit wide steps.
Treads are typically around 30 to 40 mm thick, and risers are thinner. A thicker tread is stiffer and can take more sanding, but raises the stair level more, which shows at the first and last step. For the finish, lacquer gives a hard-wearing layer, oil keeps a natural look, and hardwax oil is a compromise. On stairs it is also worth considering an anti-slip treatment, either in the lacquer or as grooves near the nosing.
How the work proceeds step by step
The method is similar for both options. Risers add one extra stage and more scribing work.
- Measuring each step individually. Concrete stairs almost never have identical steps or true right angles. The joiner measures the rise, going, flatness and moisture content of the substrate on every step.
- Making the parts to measure. Treads are cut to the actual shape of the staircase, not the drawings. Risers are made to the height of each step separately to take up small variations in the concrete.
- Acclimatisation. The finished parts are left for several days in the space where they will be fitted, so the timber adjusts to the temperature and humidity. Relative humidity there should be roughly 40 to 60 %, and fitting starts only once plaster and screeds have dried.
- Preparing the substrate. Any old coverings are removed, the concrete is cleaned of dust and grease, primed, and larger irregularities are levelled with a smoothing compound or ground off.
- Fitting the risers and treads. The parts are bonded with a flexible adhesive designed for timber to concrete, usually polyurethane or MS polymer based. Depending on the substrate, the bond is supplemented with concealed mechanical fixings. Each step is checked with a spirit level after fitting and weighted down until the adhesive sets.
- Finishing details. Gaps at the wall are covered with a moulding or flexible sealant, small joints are filled, and if the treads were not supplied pre-finished, lacquer or oil is applied.
- Protecting the finished stairs. If other work is still going on in the house, the steps are covered with hardboard or protective film so that other trades do not scratch them.
On a steel staircase, a resilient pad is placed between timber and metal so that vibration is not transferred to the timber and the step does not knock.
What the price depends on
The guide labour price is €95.00 per step. It applies to a standard step on a straight flight with flat, dry concrete and steps of roughly equal size. The following make the work longer and more expensive:
- uneven or damaged concrete that needs levelling and repairs to the nosings. Minor levelling has little effect on the price, but repairs to broken edges and thicker build-ups are noticeable,
- removal of old tiles, vinyl or existing treads, usually priced as a separate job including waste disposal. In homes built before 2000, have suspect materials tested before you drill or demolish, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor,
- winding or dog-leg staircases, where each step has a different shape. Every piece is measured and cut individually, so the labour per step is much higher than on a straight flight,
- rounded nosings and joining to an existing balustrade, where cut-outs are made and scribed around the newel posts and spindles,
- recessed LED lighting or aluminium nosing strips, which add routing and precise fitting,
- on-site finishing, if the treads are not supplied finished from the workshop. Lacquering or oiling after fitting means several coats and waiting time between them,
- steel staircases, where resilient pads are added and joints to the metal must be dealt with.
When comparing quotes, check whether the price per step includes materials, meaning the treads, risers and adhesive, or labour only, and whether substrate preparation and finishing are included.
When consent or approval is needed
Replacing the surface of an existing staircase is ordinary finishing work. If you also intend to alter the staircase structure itself, check with your local authority building control whether approval is required. In Scotland, structural alterations need a building warrant from the council before work starts. Do not alter the load-bearing structure of the stair without a structural engineer. In a block of flats, always agree any work to common parts in advance with the freeholder, managing agent or residents' management company.
What makes fitting easier and what delays it
A lot of time is saved when the site is genuinely ready for fitting. It helps when:
- plaster, screeds and skim coats around the staircase are dry and no more wet trades are working in the house,
- the temperature and humidity in the house are stable, the heating is on in winter and the house is not aired heavily for long periods,
- the staircase is clear, with no stored materials or tools from other trades,
- there is power for tools and a place where the treads can be stored before fitting,
- it has been agreed in advance how you will reach the upper floor while fitting is in progress and the adhesive cures. Sometimes alternate steps are bonded, or the work is done in sections,
- no heavy materials will be carried through the house after fitting, or the stairs are thoroughly covered.
Fitting is delayed by a damp substrate that still needs to dry, other trades working on the stairs at the same time, and late changes that require some parts to be remade.
Typical mistakes and how they show up later
Most problems do not appear straight away, but after a few months or after the first heating season.
- Damp or dusty substrate. The adhesive does not bond across the full area, voids form under the tread and the step starts to creak.
- Skipped acclimatisation. The timber adjusts to the air in the house after fitting, gaps open up or the treads twist.
- Rigid or general-purpose adhesive. Timber moves, and if the joint is not flexible it cracks or debonds.
- No expansion gap at the wall. Timber expands with moisture, and if it has nowhere to go, the tread bows or splits.
- Inaccurate measuring. A difference of a few millimetres between steps is felt underfoot and people trip. If floor thicknesses are forgotten, the first or last step ends up with a different rise, which is hard to correct afterwards and often means replacing parts.
- Poorly scribed riser. A visible gap remains at the joint with the tread, collects dirt and can creak as timber rubs on timber.
- No resilient pad on a steel staircase. The step knocks when walked on and vibration passes into the timber.
- Stairs left unprotected during other work. Scratches and dents from tools and materials show immediately in lacquer or oil, and repair means sanding.
How to check the finished staircase
At handover, walk up and down the stairs, both slowly and at a normal pace, and check:
- that no step creaks, flexes or moves underfoot,
- that all rises are equal, including the first and last,
- that the treads have the same overhang over the risers,
- that the treads are level and the nosings are in line,
- that there is no visible gap at the joint between tread and riser,
- that a gap has been left at the walls and covered with a moulding or sealant,
- that the finish is even, without runs or missed areas,
- that cut-outs around balustrade posts and any lighting are clean,
- that you have been told when the stairs can take full load and how to care for the surface.
Frequently asked questions
The guide price is €95.00 per step on a standard straight flight. The final amount depends mainly on the condition of the substrate and the shape of the staircase, as described in the price section above.
In most cases, yes. The concrete must be sound, free of major cracks and sufficiently dry. Old coverings are removed, the substrate is levelled and the timber is bonded directly onto it.
On a standard straight staircase in a house, fitting itself usually takes two to four working days. Add the time for making the treads to measure, which happens beforehand, and for levelling the substrate if needed.
It depends on the adhesive and finish used. Careful walking is usually possible once the adhesive has set, while full loading and moving furniture should wait until both the adhesive and the lacquer or oil have fully cured. The exact times are given by the manufacturer, and the joiner should tell you at handover.
Most often because the tread is not bedded across its full area or an unsuitable adhesive was used. The timber then moves slightly with each step and rubs against the concrete or the riser.
It depends on the look you want. Risers unify the staircase and protect the faces from scuffing by shoes. If you like the contrast of timber against a white wall, treads alone are enough and the faces can be painted.
Lacquered treads only need wiping with a slightly damp cloth, while oiled treads need re-oiling from time to time. Solid treads can be renewed after years by sanding and applying three coats of varnish, so they last a long time. Other related jobs are covered in the overview of carpentry work.
Related work
How timber stair treads are fitted to concrete stairs, steel spine stringers or timber strings, what to prepare beforehand and how to check the result.
How wooden stair treads are sanded and given three coats of varnish, when refurbishing is enough, what to avoid and how to check the finish.
How a wooden handrail is fixed to a wall or a balustrade, which timber and finish to choose, what to watch out for and how to check the finished job.
Price list for carpentry and joinery in 2026: fitting doors, windows, built-in wardrobes and boarding. What affects the price and a quick estimate in NUMIQ.
How kitchen units are installed without appliances, how to prepare the room, which mistakes to avoid and how to check the finished kitchen.
How an invisible routed worktop joint is made, which worktops suit it, what makes the job harder and how to check the finished joint.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.