Kitchen Unit Installation - Excluding Appliances

Fitting a kitchen without appliances costs roughly €55.00 per running metre. It covers units, worktop and trims, and a straight run usually takes a day. The price depends mainly on layout, wall condition and worktop material.

Updated 09/2026·10 min read·5 price list items
Standard labour price
€55.00/ lm
Indicative range
€44.00 - €71.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Kitchen Unit Installation - Excluding Appliances

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Carpentry and joinery5 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Kitchens cost

Install kitchen unitslm€55.00 / lmlmenter quantity-
Invisible routed worktop jointpcspcs-
Fit kitchen appliances into unitspcs€55.00 / pcspcsenter quantity-
Install and connect extractor hood ductingpcs€55.00 / pcspcsenter quantity-
Adjust and cut worktoplm€19.00 / lmlmenter quantity-
Total labour
- enter quantity
Create quote from price list →

What the installation includes and what it does not

This work covers assembling and fitting the whole kitchen: base units, wall units, worktop, plinths, trims and end panels. Appliances, the sink and the tap are not connected. That is separate work for an electrician and a plumber. The service is useful when a new flat-pack kitchen has been delivered, when the kitchen is replaced during a renovation, or when the units need to be in place before other trades arrive.

The kitchen fitter handles the joinery side. It sits within carpentry work. The fitter makes sure the kitchen stands level and solid and that everything opens and closes properly. The usual tasks are:

  • assembling the unit carcasses according to the manufacturer's instructions,
  • positioning and levelling the base units on adjustable legs,
  • hanging and fixing the wall units to the wall,
  • joining the units together into one run,
  • measuring, cutting and fitting the worktop, including cut-outs for the sink and hob,
  • fitting plinths, cover trims, end panels and upstands or wall trims,
  • adjusting hinges, doors and drawers.

Outside this work are connecting the oven, hob, dishwasher and extractor hood, fitting the sink and tap, connecting water and waste, moving sockets, new electrical circuits and under-cabinet lighting. These are covered under oven and extractor hood installation and connection and similar jobs. Electrical connection belongs to a qualified electrician. In England and Wales, a new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts. If the kitchen has gas, only a Gas Safe registered engineer may connect or disconnect a gas cooker or hob, so check the back of their ID card to see which work they are qualified for. If you smell gas, turn off the supply at the meter, open the windows, do not use any switches and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

When agreeing the job, check whether the fitter will place integrated appliances into the units without connecting them, for example sliding in the oven or dishwasher and fitting the dishwasher door panel. Some fitters include this, others price it separately as integrated appliance installation in kitchen units. The same applies to removing the old kitchen and taking away the packaging.

What to decide and prepare before fitting

Fitting is mostly delayed when a decision has not been made in time. Before booking, be clear about:

  • Worktop height: usually around 90 cm, fine-tuned with the legs. The person who cooks most should decide. Taller people often prefer a higher worktop, shorter people a lower one.
  • Wall unit height: this depends on the extractor hood, whose manufacturer sets a minimum distance above the hob, and on whether the top shelf is within reach.
  • Worktop material: stone and quartz worktops are templated only once the units are fitted, and the worktop supplier makes the cut-outs, so allow for another visit.
  • Exact appliances: cut-outs and housings are made for specific models. Have the appliances on site, or at least their installation instructions with cut-out templates.
  • Fixings: the wall plugs supplied with the kitchen may not suit your walls. Agree whether the fitter will supply suitable fixings.
  • The old kitchen: removal, disconnection and disposal are separate tasks, often for several trades. Before handing over the old units or rubble, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

The kitchen is one of the last things to go in. Before the fitter arrives, the following should be finished:

  • the final floor, so the kitchen does not have to be lifted or taken apart later,
  • plastering and decorating, and tiling if it runs behind the units,
  • water, waste, electrical points and the extractor duct in the right places according to the kitchen design.

The services do not need to be connected, but their positions must be fixed. Otherwise a socket ends up behind a unit side panel or a waste pipe sits right under a partition. Clear the room and the route from the entrance. A long worktop needs room to manoeuvre, and the units need space to be unpacked and checked for damage before fitting.

The job goes faster with a printed kitchen plan with dimensions, working power on site for tools and lighting and, in a block of flats, a booked lift, parking for the van and agreed hours for noisy work. Fitting stops when part of the delivery is missing, when the design changes on site, or when another trade, such as a tiler, is working in the kitchen at the same time.

How fitting works step by step

An experienced fitter starts by checking, not drilling. The order of units varies. Some fitters start with the base units, because they form the base for the worktop and set the line for the whole kitchen. Others hang the wall units first, so the base units are not in the way when working at the wall. Both methods work if they follow the same marked line.

  1. Checking the delivery: units, doors and fittings are checked against the list and inspected for damage.
  2. Surveying the room: the fitter measures the room, checks the walls and floor for flatness and compares everything with the plan. The highest point of the floor is found, because the height of the whole kitchen is set from it.
  3. Marking out: a level line is marked on the wall for the base units and for the wall unit hanging rail, and the fitter checks where cables and pipes run in the wall.
  4. Assembling carcasses: units are assembled according to the manufacturer's instructions, without doors for now, so they are easier to handle.
  5. Base units: they are positioned, levelled in both directions and screwed together. Holes are cut in the units for water, waste and electrical points.
  6. Wall units: the hanging rail is fixed, the units are hung and tightened with the hanging brackets. A gap of around 50 to 60 cm is usually left between the worktop and the wall units.
  7. Worktop: it is cut accurately, because walls are rarely at a true right angle. Sink and hob cut-outs follow the template or dimensions from the appliance manufacturer. On better worktops, corners are joined with a routed joint and worktop bolts, as with an invisible mitred joint for worktops, which is almost invisible and resists moisture better. Cut edges are sealed. A gap of a few millimetres is left at the wall so the worktop can move with changes in humidity.
  8. Finishing items: plinths, cover trims, end panels and the wall trim or upstand that hides the gap behind the worktop are fitted.
  9. Adjustment: doors and drawers are fitted and the hinges adjusted so gaps are even and everything closes.

Kitchen fitting price: what it depends on

The guide labour price is €55.00 per running metre. The running metre is measured along the length of the kitchen against the wall and normally includes both base and wall units over that length. For L-shaped or U-shaped kitchens, the runs are added together. Ask for tall units and an island to be priced separately in the quote, so quotes can be compared. The final price is affected by:

  • Condition of the room: this matters most. In a new build with straight walls and a new floor, fitting runs smoothly. In older flats and period houses with uneven walls, larger deviations have to be taken up, trims adjusted and the worktop scribed to an uneven wall. The job takes noticeably longer.
  • Layout and make-up of the kitchen: a straight run is simpler than an L or U shape with corner units, tall units or an island. Every corner means a worktop joint and more precise measuring.
  • Worktop material: laminate is the most common and is cut on site. Solid wood needs room for natural movement and oiling. With stone and quartz, the fitter comes twice: once to fit the units and for templating, and again to fit the worktop.
  • Wall type: brick and concrete take standard wall plugs, aircrete blocks need special fixings, and plasterboard needs cavity wall fixings or, better, noggins or reinforcement inside the stud wall. Special fixings are slower and more expensive.
  • Bespoke adjustments: shortening units, cut-outs for pipes and boxing, or scribing panels to a sloping ceiling or into an alcove are often charged extra.
  • Additional tasks: removing the old kitchen, carrying to an upper floor without a lift and taking away packaging add to the cost.

Typical mistakes that show up later

A kitchen can look fine on fitting day, and problems appear only after a few months. The most common causes are:

  • Units not level: doors swing open on their own and drawers stick.
  • Wall units on unsuitable fixings: they gradually work loose, especially once filled with crockery.
  • Unsealed cut edges of a laminate worktop at the sink: the board absorbs water and swells. The repair usually means a new worktop.
  • Worktop pushed hard against the wall without a gap: it bows or cracks as humidity changes.
  • Kitchen fitted before the floor or tiling is finished: it then has to be taken apart.
  • Appliance cut-out made by guesswork: the hob or sink does not fit, and an oversized cut-out cannot be undone.
  • Covered services: a socket or valve ends up behind a side panel, and part of the kitchen has to be dismantled if something goes wrong.
  • Wall units too low above the hob: the extractor hood cannot be fitted according to the manufacturer's instructions.

Most of these mistakes are avoided by keeping to the right order of work and using good-quality fixings chosen for the wall type.

How to check the finished installation

At handover, go through the kitchen calmly with a spirit level in hand. Check that:

  • the worktop is level along its length and front to back,
  • gaps between doors are even and the doors line up,
  • doors stay put in any position and do not open on their own,
  • drawers run smoothly and close fully,
  • wall units do not move when pulled,
  • worktop joints are smooth and cut edges sealed,
  • sink and hob cut-outs match the appliance dimensions,
  • water and electrical points are accessible through the holes in the units,
  • plinths and trims fit properly and nothing is scratched,
  • you have the instructions, spare fittings and leftover cover caps, if the manufacturer supplied them.

DIY guide: assembling a kitchen

A capable DIYer with a spirit level, a drill and a helper can assemble and fit a simple straight kitchen. Leave electrics, plumbing and gas to professionals. Never hang wall units alone, always with two people. L-shaped kitchens with a worktop corner joint and stone worktops are better left to a kitchen fitter.

  1. Check the delivery against the list and unpack the units.
  2. Find the highest point of the floor and mark a level line for the base units from it.
  3. Use a detector to check where cables and pipes run in the wall.
  4. Assemble the carcasses according to the manufacturer's instructions, without doors for now.
  5. Position the base units, level them with the legs and screw them together.
  6. Fix the hanging rail with fixings suitable for the wall type.
  7. Hang the wall units with a helper and tighten the hanging brackets.
  8. Measure and cut the worktop and seal the cut edges.
  9. Fix the worktop to the units from below, leaving a small gap at the wall, and cover the gap with a trim.
  10. Fit the doors, drawers and plinths and adjust everything.

Frequently asked questions

The guide price is €55.00 per running metre. The final amount depends on the kitchen layout, the number of corners and tall units, the condition of walls and floor, the worktop material and additional tasks such as removing the old kitchen.