Building work price list: Sanding stair treads + 3 coats of varnish - refurbishing existing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Stairs and balustrades cost | ||||
| Sand stair treads + 3 coats varnish | pcs | €55.00 / pcs | pcs | enter quantity- |
| Install stair treads | pcs | €65.00 / pcs | pcs | enter quantity- |
| Install stair treads with risers | pcs | pcs | - | |
| Install timber handrail | lm | €15.00 / lm | lm | enter quantity- |
What stair refurbishment involves and when it is needed
Timber stairs wear faster than the floor. The varnish dulls on the nosings, worn patches and scratches appear in the middle of the treads, and in places the finish starts to peel. If the structure is sound, the stairs do not need replacing. The old surface is sanded off, small defects are repaired and three coats of new varnish are applied. The work is done in place, and the original staircase and balustrade stay as they are.
Stairs are usually refurbished during a house renovation, after buying an older property, when new flooring around them no longer matches, or when the varnish on the walking line has worn through to bare timber. The whole job takes several days. Most of that time goes on drying the varnish, not on sanding.
When refurbishment is enough and when it is not
Sanding and revarnishing makes sense when the damage is mainly on the surface. Before work starts, walk the stairs and put weight on each tread. Sanding will not cure creaking, a tread that moves underfoot or a loose balustrade. These faults should be fixed before sanding, not afterwards. Tightening or re-gluing a tread easily damages fresh varnish.
Refurbishment is suitable when:
- the treads and strings are firm and nothing moves,
- the timber shows no woodworm or rot,
- the damage goes no deeper than the varnish and a thin top layer of timber.
Deep cracks in load-bearing parts, loose fixings into the wall or treads damaged right through mean that replacing individual treads should be considered, for example by fitting new stair treads. Cracked strings and loose wall fixings affect the structure of the staircase. They should be assessed by a joiner or carpenter as part of carpentry work, not by a decorator or floor fitter. A wobbly handrail can be dealt with by refitting or replacing the timber handrail before sanding begins.
The thickness of the wearing layer also matters. Some stairs have solid timber only as a thin veneer over chipboard or a glued core. These can be sanded only very carefully, or not at all. The thickness can usually be seen on the side edge of the tread or from underneath.
Small exit holes with fine dust around them, soft spots that can be pressed in with a fingernail, or dark patches near the wall suggest woodworm or rot. In that case the cause and the timber treatment come first, and the surface afterwards.
What to decide before placing the order
A few decisions affect both the result and the scope of the job. It is worth agreeing them in advance and having them written into the quote.
- What will be sanded. Only the tread surfaces, or also the risers, strings, landing and balustrade.
- Colour. After sanding, the timber shows its natural colour. This is usually lighter than the old yellowed varnish. A darker shade or a match with the floor is achieved with wood stain or a tinted varnish. This adds one step and a colour test in an inconspicuous spot.
- Type of varnish and sheen level. The options are described in a separate section below.
- Slip resistance. Varnished timber can be slippery in socks. Some manufacturers offer floor varnishes with improved slip resistance. If children or older people live in the house, ask about them.
- Using the stairs during the work. If the staircase is the only way upstairs, agree whether it will be varnished in alternate steps or whether the upper floor will be out of use for a few days. With alternate varnishing, every other tread is coated first and the rest once those are dry. Each coat is therefore applied in two rounds, and each round has to dry. Varnishing takes roughly twice as long.
- Old paint. If the stairs are painted rather than varnished and the paint is very old, it may contain lead or other harmful substances. Tell the tradesperson beforehand so that they can work with dust extraction and suitable respiratory protection, for example a mask of at least FFP2 class.
How the work proceeds step by step
The method is the same for most timber stairs. The differences are mainly in the number of sanding passes and the type of varnish.
- Inspection and preparation. The tradesperson checks that the treads are firm and how thick the wearing layer is. Beading and covers that get in the way are removed, and the surroundings are masked off with sheeting and tape. If lights are built into or next to the treads, disconnecting and removing them is a job for an electrician.
- Coarse sanding. A coarse abrasive, usually P40 to P60 grit, removes all the old varnish and levels out worn areas. A random orbital sander is used on flat surfaces, and a belt sander on thick solid timber and deeply worn treads. A belt sander removes material quickly. On thin treads or veneer it could easily sand through to the core, so it is not used there and sanding starts with a finer grit. A detail sander or hand sanding is used for corners, edges and around the balustrade.
- Fine sanding. The grit is gradually increased to P80 to P100 and then P120 to P150. This removes scratches from the coarse abrasive and brings out the grain. Grits are not skipped, otherwise visible scratches remain.
- Edge finishing. The nosings are lightly rounded. On a sharp edge the varnish forms only a thin film and wears away quickly.
- Filling. Small cracks and dents are filled with a wood filler in a matching colour that is suitable for use under the chosen varnish. Once dry, the area is sanded smooth.
- Dust removal. The dust is vacuumed off and the surface wiped down. Water always raises the wood grain, whatever the type of varnish. Before a water-based varnish this does not matter, because the varnish itself raises the grain and it is levelled when the first coat is denibbed. A slightly damp cloth is therefore enough. Before a solvent-based varnish, water is not used, as the raised fibres would stay in the surface. A dry anti-static tack cloth or a cloth dampened with thinners is used instead. Any dust left behind is sealed into the varnish and shows.
- Staining, if agreed. Stain is applied before the varnish and must dry completely. It must be compatible with the chosen varnish.
- First coat of varnish. This is often a primer or sealer coat that seals the timber and improves adhesion of the following coats.
- Denibbing and second coat. Once the first coat is dry, the surface is lightly sanded with a fine P180 to P240 abrasive, dusted off and the second coat applied.
- Denibbing and third coat. The second coat is sanded in the same way and the final coat applied. The third coat is not sanded and remains as the finished surface.
- Curing and refitting. Beading and covers are refitted only once the varnish can be worked on safely without leaving marks.
Drying times between coats are set by the varnish manufacturer. They depend on room temperature and humidity. For a typical water-based varnish it is roughly 2 to 4 hours, so two coats can sometimes be applied in one day. Solvent-based varnishes generally take longer. In cold and damp conditions all times are longer. Full curing takes considerably longer than drying a single coat.
Which varnish to choose and why three coats
Stairs need a varnish designed for floors, not for furniture. Stairs take more wear than a living room floor, because every day the same spots are stepped on. Polyurethane varnishes are the most common choice, as they resist abrasion well.
- Water-based varnishes smell less, dry faster and cause less yellowing of the timber. They are the usual choice for an occupied home.
- Solvent-based varnishes can enrich and warm the colour of the timber more. However, they have a strong smell and need good ventilation with no naked flames.
- Sheen level is a matter of taste. Matt and satin finishes show fine scratches less. Gloss looks more striking, but every mark shows on it.
Why three coats? A single coat is thin and wears through quickly. Three coats with denibbing in between create a continuous film. This protects the timber from wear and from moisture brought in on shoes, and lasts longer before the next refurbishment. Oil is sometimes used on stairs as an alternative, but it needs more frequent maintenance. Rags soaked in oil can self-ignite. After work they should be laid flat outdoors or soaked in water.
What affects the price
The guide price for the work is €55.00 per tread. The final cost for the whole staircase can differ depending on the condition of the stairs and the scope of the work.
- Number and width of treads. The price is multiplied by the number of treads. Much wider treads or a landing mean a larger area, which is often priced separately.
- Surface condition. Thin, worn varnish sands off quickly. Deeply worn treads, several layers of old finish or older varnish that clogs the abrasive mean more sanding and more abrasive. This lengthens the job noticeably.
- Timber species. Hard oak or beech takes longer to sand than spruce or pine. Softwoods, on the other hand, are easier to dig into, so they are worked more carefully.
- Thin wearing layer. Veneer or thin solid timber is sanded slowly with a finer abrasive, which adds to the cost.
- Shape of the staircase. Straight flights are the simplest. Winders and spiral treads have irregular shapes and more corners that must be sanded by hand, so they take more work.
- Balustrade and newel posts in the treads. Every post and baluster has to be sanded and varnished around by hand. The more there are, the slower the work.
- Scope. Risers, strings, landing and balustrade are usually priced separately. If these are to be refinished too, the amount of work can double.
- Repairs. Extensive filling, repairing cracks or re-gluing loose parts is added to the standard price.
- Removing coverings and adhesive. Stair carpet, rubber or glued anti-slip strips and adhesive residue must be scraped off before sanding, otherwise they clog the abrasive. If the tradesperson does this, it is extra work.
- Staining and special varnish. A change of colour adds a step and drying time. Solvent-based, tinted or anti-slip varnishes tend to cost more than a standard water-based varnish.
- Occupied home. If furniture and surroundings must be covered thoroughly, or the stairs varnished in alternate steps, the work takes longer.
When comparing quotes, ask whether materials, abrasives and varnish are included and whether the price is per tread or per m². Also check exactly what is covered - only the tread surfaces, or also the risers and nosings.
How to prepare so the work goes quickly
A lot of time can be saved by what the customer arranges before the tradesperson arrives.
- Remove stair runners and decorations. Take furniture, pictures and plant pots away from the staircase. Whatever cannot be moved should be covered.
- Provide a free socket near the stairs and access to water for cleaning tools.
- Agree where tools and varnish will be stored. If the upper floor will be out of use, arrange temporary living space downstairs.
- Keep the house at normal room temperature and leave the heating on. In cold and humid conditions varnish dries more slowly.
- Ensure ventilation without draughts. A draught carries dust and hairs onto wet varnish.
- Keep pets and children off the stairs until the varnish is dry. Pet hair and paw prints in wet varnish are a common reason for rework.
- Do not plan vacuuming, sweeping or other dusty jobs in the house on varnishing days.
Typical mistakes and how they show up later
- Remnants of old varnish. New varnish adheres poorly to them, patches appear and it later peels.
- Uneven sanding. Skipping grits or pressing hard in one spot creates waves and hollows, which the varnish then highlights.
- Sanded-through veneer or edge. With a thin wearing layer, especially with a belt sander, a moment's inattention is enough for the core to show through.
- Sharp nosings. The varnish stays thin on them and bare timber appears on the edge within a few months.
- Skipped denibbing. The coats bond less well and the surface is rough with dust and raised grain.
- Poorly dusted surface. Dust and hairs are sealed into the varnish and the surface feels gritty.
- Too thick a coat at once. The varnish runs over the edges, dries slowly and may stay soft.
- Furniture varnish instead of floor varnish. It looks good only briefly and wears quickly on the walking line.
- Incompatible stain, filler or varnish. The varnish may wrinkle, dry badly or peel later.
- Sanding without fixing creaking treads. The stairs look good but still creak, and a later repair damages the new varnish.
- Using the stairs too early. Walking on them in shoes before the varnish has cured leaves marks.
How to check the finished stairs
At handover, inspect the stairs in daylight and also look along them at an angle against a window. This shows unevenness that is missed when looking from above.
- the varnish has the same sheen on all treads, with no dull or glossy patches,
- there are no roller marks, runs or trapped hairs and dust,
- the surface feels smooth, not gritty, when a palm is run over it,
- no sanding scratches or swirl marks from the orbital sander are visible at an angle,
- the nosings are smooth and the core does not show through anywhere,
- filled areas match the timber in colour and cannot be felt with a finger,
- corners at the wall and around balustrade posts are sanded and varnished,
- the colour matches the agreed sample, if the timber was stained,
- the treads do not creak or move underfoot, if their repair was part of the agreement,
- surrounding walls, floor and balustrade are clean and free of varnish marks,
- you have details of the varnish used and of when the stairs can take full use.
Refurbishing timber stairs yourself: what to watch out for
With patience and suitable hired sanders, the job can be done as DIY. The method is the same as in the steps above. For home work, these principles are also worth following.
- Choose a random orbital sander. A belt sander removes material quickly, and a beginner can easily dig a hollow or sand through veneer.
- Test the sanding and the colour first on the least visible spot, for example the bottom tread next to the wall.
- Protect against dust with a mask of at least FFP2 class and eye protection. Very old paint that may contain lead is better left to a professional with dust extraction.
- Move the sander smoothly without pressing, and do not let it stand in one spot.
- Apply varnish in thin coats and keep to the drying times on the tin.
- Varnish from the top down so that you are not trapped upstairs.
If you live in a block of flats, for example in a maisonette, check with the managing agent or in your lease at what times noisy work is permitted. Leave repairs to loose strings, wall fixings and any work on stair lighting to professionals.
Frequently asked questions
The guide price is €55.00 per tread. The final figure depends on the timber, the shape of the treads, the number of balustrade posts, the depth of damage and whether risers, staining or repairs are included.
For a typical staircase in a house it usually takes several days. The sanding itself often takes one day, and drying three coats of varnish takes longer. With a water-based varnish, the stairs can usually be walked on carefully in socks about 24 hours after the last coat. Shoes, runners and full use should wait until the varnish has fully cured, which takes roughly 7 to 14 days. Exact times are given by the varnish manufacturer.
Usually yes. Older stairs are often made of good-quality solid timber that looks very good once sanded. The condition is a sound structure and timber free of rot and woodworm.
Yes. Once sanded back to bare timber, a wood stain or tinted varnish can be used. The colour is tested first in an inconspicuous spot, because every piece of timber takes up colour differently. Dark timber cannot be lightened this way.
Vacuuming and wiping with a well wrung-out cloth and a cleaner for varnished wood is enough. Harsh chemicals dull the varnish. Timber prefers a stable temperature and a relative humidity of usually around 40 to 60 per cent, otherwise it may shrink and crack.
Only the sanding stage is noisy. Sanders with dust extraction capture most of the dust, but fine dust still spreads. It is therefore sensible to cover nearby furniture and close the doors to other rooms.
It is not essential, because risers are not walked on. However, if they are grubby or no longer match the newly varnished treads, it is worth sanding and varnishing them together with the treads so the staircase looks uniform. If the risers are damaged beyond refinishing, fitting new timber treads with risers may be the better option.
Related work
How timber stair treads are fitted to concrete stairs, steel spine stringers or timber strings, what to prepare beforehand and how to check the result.
How wooden stair treads and risers are fitted to concrete or steel stairs, which timber and finish to choose, and what to check when the work is done.
How a wooden handrail is fixed to a wall or a balustrade, which timber and finish to choose, what to watch out for and how to check the finished job.
Price list for carpentry and joinery in 2026: fitting doors, windows, built-in wardrobes and boarding. What affects the price and a quick estimate in NUMIQ.
How kitchen units are installed without appliances, how to prepare the room, which mistakes to avoid and how to check the finished kitchen.
How an invisible routed worktop joint is made, which worktops suit it, what makes the job harder and how to check the finished joint.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.