Building work price list: Laying Geotextile Membrane
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Sub-base preparation | ||||
| Laying geotextile membrane | m² | €1.90 / m² | m² | enter quantity- |
| Removal of block paving | m² | €2.70 / m² | m² | enter quantity- |
| Excavation for paving sub-base | m³ | €35.00 / m³ | m³ | enter quantity- |
| Preparation of gravel sub-base including compaction | m² | €7.50 / m² | m² | enter quantity- |
| Levelling bedding / laying course | m² | €2.50 / m² | m² | enter quantity- |
| Formation of sub-base up to 30 cm deep | m² | €2.00 / m² | m² | enter quantity- |
| Formation of sub-base up to 50 cm deep | m² | €2.70 / m² | m² | enter quantity- |
| Compaction of sub-base with vibratory plate | m² | m² | - | |
What geotextile is for
Manufacturers list several functions for geotextiles. For ordinary work around the house, these are the main ones:
- separation: it keeps fine soil apart from gravel. Without it, the soil is gradually pushed into the gravel bed by rain and load, the gravel is ‘lost’ into the subsoil and the paving or drive settles,
- filtration: it lets water through but holds back fine soil particles. That is why it is used in drainage, so that the gravel around the drainage pipe does not silt up,
- protection: it protects a liner or waterproofing from sharp stones, for example under a pond liner or beneath a swimming pool,
- reinforcement: heavier types help spread the load on soft ground, for example on temporary site roads.
On a family house, geotextile is most often laid under the block paving of the driveway and parking space, under paths, under gravel areas and drives, in drainage trenches around the foundations and under ponds.
What geotextile cannot do
Weeds in gravel
On forums you often come across the idea that fabric under gravel will stop weeds for good. It will not. It only limits weeds growing up from the soil beneath it. Over time, dust, leaves and grass clippings get into the gravel and form a thin layer of humus. Seeds blown onto it by the wind will germinate there regardless of what lies under the gravel. The area therefore still needs cleaning, and weeds should be pulled out before they set seed.
Load-bearing capacity of the base
Geotextile is no substitute for a properly compacted base. If the gravel layer under the paving is thin or not compacted, the paving will settle even with the most expensive fabric. Load-bearing capacity comes mainly from a coarse gravel sub-base of sufficient thickness and from compaction with a plate compactor. The fabric only stops the layers mixing over time.
Impermeable sheeting instead of geotextile
Black plastic sheeting is not geotextile. It lets through neither water nor air, water sits on it, and under paving or gravel it does more harm than good. Areas for walking and driving, as well as drainage, always need a permeable geotextile.
What to decide before work starts
Non-woven or woven
In shops you will mainly find two types:
- non-woven geotextile is a felt of polypropylene (PP) or polyester (PES) fibres, bonded by needle punching or heat. It filters well and adapts to an uneven excavation floor. It is the type most often used for separation under paving and gravel and for drainage,
- woven fabric is a dense weave of plastic tapes. It has higher tensile strength for a lower weight but filters less well. Cheap black weed control fabrics for flower beds also belong here. These are not intended for areas that carry vehicles.
Weight, and why it is not everything
Geotextiles are sold by weight per unit area, typically in a range of roughly 100 to 500 g/m². Drainage geotextiles are commonly sold at 200 g/m². For separation under driveways, paths and gravel areas, manufacturers' data sheets give heavier types of around 300 g/m². The logic is that the greater the load and the sharper the gravel, the stronger the fabric should be.
Weight alone, however, does not guarantee quality. Two fabrics of the same weight can differ in strength and service life. For example, the data sheet of one thermally bonded geotextile made from recycled polyester at 300 g/m² states a tensile strength of 3 kN/m and a minimum service life of 5 years in the ground. Other manufacturers state a service life of 25 years or more for their products. When choosing, therefore, look at the data sheet, not just the figure on the label:
- tensile strength in kN/m in both the longitudinal and transverse directions,
- puncture resistance (static puncture, often referred to as CBR) in kN,
- declared service life in the ground,
- CE marking and the standards the product is intended for, for example EN 13249 for roads and paved areas and EN 13252 for drainage systems.
Exactly where it will lie
For paving and gravel areas, geotextile is laid on the levelled and compacted floor of the excavation, i.e. between the original soil and the gravel sub-base. Some manufacturers also mention laying it under the sand or grit bedding layer of the paving, so that the bedding is not washed down into the coarse gravel below. This decision should be made before ordering materials, because it changes the area required.
Who buys the material
Agree in advance whether the contractor or you will buy the fabric, and which specific product will be used. Otherwise, when comparing quotes, it is easy for one firm to price cheap fabric from a DIY store and another a certified type for trafficked areas.
How the work is done, step by step
- Preparing the excavation floor: the floor is levelled, and roots, sharp stones and leftover building rubble that could puncture the fabric are removed. The floor is compacted if needed.
- Unrolling: the fabric is unrolled across the full width of the area, loosely, without wrinkles and without being pulled taut. On drives it should cover the full width of the gravel sub-base, not just the middle.
- Overlaps: adjacent strips overlap. One manufacturer of non-woven fabrics specifies an overlap of at least 30 cm at joins between two rolls and in drainage, and 30 to 50 cm for car parks and permanent roads. On soft ground the overlaps are increased.
- Weighting the edges: in windy weather the fabric is held down with piles of gravel so it does not blow away. It is not unrolled far ahead of the gravel spreading.
- Turning up at the edges: at the kerbs the fabric is brought up the side of the excavation so that soil cannot get into the gravel from the side.
- Spreading the gravel: gravel is tipped onto the layer already spread and pushed forward. Neither a lorry nor an excavator should drive directly on the fabric. The largest stone should not exceed one third of the layer thickness.
- Covering on the same day: manufacturers state in their data sheets that geotextile must be covered on the day it is laid. Sunlight degrades it, and rain washes fine soil onto it, which dries into an almost impermeable crust.
- Compacting in layers: the gravel sub-base is compacted in layers. Only then do the bedding layer and paving follow.
Geotextile by application
Under block paving
It is laid on the excavation floor beneath the gravel sub-base. It pays off most on clay and loamy ground that is wet and soft. For a driveway carrying cars, choose a stronger type than for a path. The full procedure from excavation to sweeping the joints is covered in the article on block paving and kerbs.
Gravel driveway and parking
This is where geotextile works hardest, because the gravel is not held in place by paving and cars push it into the subsoil. For roads on soft ground, one manufacturer specifies a first gravel layer of at least 25 cm and levelling out ruts once their depth exceeds one third of the layer thickness. With plastic grass or gravel grids, the fabric goes under the grids, and manufacturers often supply them with fabric already attached.
Drainage around the house
In a drainage trench the geotextile is laid as a ‘wrap’: over the bottom and sides of the trench, then gravel, the drainage pipe in the gravel, more gravel, and finally the fabric is folded over the top with an overlap of at least 30 cm. One manufacturer of dimpled membranes recommends at least 15 cm of gravel surround around the pipe and, where the soil would silt up the gravel, wrapping the whole gravel surround in filter fabric rather than the pipe itself. A thin fabric tight around the pipe clogs with fine particles faster than fabric around the perimeter of the whole surround.
Pond and swimming pool
Under a pond liner and under a pool, geotextile serves as a protective layer against sharp stones and roots. A thicker type is chosen here and it is laid without gaps.
What the price depends on
The guide price for labour in the price list is €1.90 per m² of laid area, excluding materials. The final total is mainly affected by:
- area and shape: a straight rectangular driveway is laid quickly. Curved paths, corners and cut-outs around manholes mean more cutting and more waste,
- overlaps: with 30 to 50 cm overlaps you use more fabric than the area itself, which shows mainly in the cost of materials,
- type of work: a flat area under paving is simpler than wrapping a drainage trench, where the fabric goes on the bottom and sides and is then folded over the top,
- condition of the excavation floor: picking out roots, stones and rubble and re-levelling the floor is a separate job,
- type of fabric: certified fabric for trafficked areas costs more than cheap DIY fabric. Material is not included in the labour price,
- related work: excavation, soil removal, gravel sub-base and compaction are charged separately.
With paving, the cost of geotextile is only a small part of the total. Most of it is made up of excavation, gravel, compaction and the paving itself.
What should be ready
- the excavation is finished to the design depth and the floor is levelled,
- it is clear where utilities and drainage run, so that no digging is needed once the fabric is down,
- gravel for the sub-base has been delivered or is ordered for the same day, so the fabric can be covered straight away,
- the type of fabric and who buys it have been agreed,
- there is access on site for the gravel lorry so it does not have to drive over the laid fabric.
Typical mistakes and how they show later
No overlap or too small an overlap
The strips pull apart during spreading and compaction and soil is pushed through the gap into the gravel. After a few years this shows on the paving as a strip that has sunk.
Fabric left in the sun too long
The fabric loses strength and tears when gravel is spread. If it rains in the meantime and soil is washed onto it, it stops letting water through.
Driving on the fabric
Wheels and the excavator bucket tear it or press it into the mud. Torn fabric does not work at that spot.
Sharp objects on the floor
Lumps of concrete, bricks and stones from rubble puncture the fabric during compaction.
Too light a type under a driveway
Light fabric from a DIY store will last under a path, but under a car on soft ground it can tear. Soil then works its way into the gravel and ruts form in the driveway.
Fabric tight around the drainage pipe
Fine soil clogs the thin layer of fabric around the pipe and over time the drain stops taking water. It is better to wrap the whole gravel surround.
Weed control fabric instead of geotextile
Cheap woven fabric for flower beds is not designed to take load and filters less well. Under paving or a drive it can tear or clog.
How to check the finished work
- before covering: the fabric lies over the whole area without holes or folds and is turned up at the edges of the excavation,
- overlaps are at least what the manufacturer specifies, usually 30 cm or more,
- there is no soil or mud washed onto the fabric,
- in drainage, the fabric is folded over the gravel and the pipe has a gravel surround,
- the fabric is covered on the same day,
- ask for the delivery note or the packaging showing the product name and weight, so you know what was actually used.
Once the fabric is covered, it can no longer be checked. It is therefore worth being present or asking for photos before it is covered.
DIY guide: what to watch out for
Laying geotextile is within reach of a non-professional and is one of the simplest jobs in paving. The important points are:
- Buy a permeable geotextile with a data sheet, not black sheeting or weed control fabric.
- Before laying, pick roots, stones and rubble out of the excavation floor.
- Unroll the fabric loosely with overlaps of at least 30 cm and bring it up to the edges.
- Cut with a sharp knife or scissors, and in wind weigh the edges down with gravel.
- Cover it on the same day and push the gravel forward over the layer already spread, rather than driving a wheelbarrow or vehicle directly on the fabric.
- Compact the gravel, never the bare fabric.
Frequently asked questions
The guide price for labour in the price list is €1.90 per m², excluding materials. On top of that comes the fabric, depending on type and overlaps, plus related work such as excavation, gravel sub-base and compaction.
It is not compulsory, but on loamy and clay ground it is very useful. It stops soil being pushed into the gravel sub-base and the paving settling over time. On sandy and gravelly ground the benefit is usually smaller.
For drainage and filtration around 200 g/m² is often used, and for gravel drives and driveways stronger types of around 300 g/m² or more. More important than weight, however, are the tensile strength, puncture resistance and service life given in the data sheet.
Its basic place is the excavation floor, i.e. between the soil and the gravel sub-base. It goes under the sand or grit bedding of the paving only when the build-up requires it or the fabric manufacturer recommends it.
Only partly. It stops weeds from the soil beneath it, but not seeds that germinate in the dust and leaves between the stones. The gravel area still needs cleaning.
Manufacturers usually specify at least 30 cm at roll joins and in drainage, and 30 to 50 cm for roads and car parks. On soft, wet ground the overlaps are increased.
As briefly as possible. Manufacturers' data sheets specify covering on the day of laying. Sunlight weakens the fabric and rain washes soil onto it, which clogs it.
Drainage system manufacturers rather recommend wrapping the whole gravel surround around the pipe in geotextile. Thin fabric directly on the pipe clogs faster in loamy soil.
Related work
How to lift block paving without needless damage, when to reuse the blocks, and what to watch with kerbs, buried services and waste disposal.
What a levelling course under block paving is, which material to use, how thick it should be and how to screed it flat before laying.
How to compact a gravel sub-base with a vibrating plate: layer thickness, number of passes and how to check the base is firm enough for paving.
How a compacted gravel sub-base up to 30 cm thick is built, when it is enough, how the layers are compacted and what to check before paving goes on.
When a crushed stone sub-base up to 50 cm is needed, how it is laid and compacted in layers, which aggregate to use and how to check it before paving.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.