Laying Block Paving, 8-10 cm Thick

Laying block paving 8-10 cm thick creates a hard standing for cars on a driveway or parking area. The guide price is €15.00 per m². Sub-base depth, the shape of the area and access affect the price most. A typical driveway takes about a week.

Updated 09/2026·11 min read·8 price list items
Standard labour price
€15.00/ m²
Indicative range
€12.00 - €19.50
60 m² flat
€2250.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Laying Block Paving, 8-10 cm Thick

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Paving and block paving8 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Paving cost

Laying block paving, 8-10 cm thickm²€15.00 / m²m²enter quantity-
Laying block paving, 4-6 cm thickm²€11.00 / m²m²enter quantity-
Laying decorative block pavingm²m²-
Surcharge for small pavers up to 10×10 cmm²€5.50 / m²m²enter quantity-
Cutting block paving, 4-6 cm thicklm€3.50 / lmlmenter quantity-
Cutting block paving, 8-10 cm thicklm€5.50 / lmlmenter quantity-
Jointing with silica sandm²€1.90 / m²m²enter quantity-
Final sanding and brushing into jointsm²€1.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

When 8-10 cm block paving is needed

Thicker block paving is for areas that cars drive and park on: a garage entrance, a driveway, a parking space next to the house or a commercial yard. Thinner paving of 4-6 cm suits paths and patios better. The method is similar for both. The main difference is the load the paving can take and how deep and firm the sub-base underneath must be.

This work usually comes up when a new house needs a driveway, when old cracked concrete or tarmac is being replaced, when a front lawn is turned into a parking space, or when the existing surface has failed under the car.

The difference between 4-6 cm and 8-10 cm paving

Thickness decides how much load the area can carry. A thicker block spreads the weight of a wheel into the sub-base better, tilts less under braking and turning, and stays level for longer.

  • 4 cm: paths, garden walkways and patios, meaning foot traffic only, or perhaps a wheelbarrow or lawnmower,
  • 6 cm: yards, areas around the house, occasional passage of a car on a good sub-base,
  • 8 cm: garage entrances, driveways and daily parking of cars,
  • 10 cm: areas also used by vans or service vehicles, commercial yards and loading areas.

It is common for 4 cm paving to be laid on a driveway because "the car only stands there now and then". After a few seasons, ruts appear in the wheel tracks and blocks come loose or crack. For a combined area, thinner paving for the path can be joined to thicker paving for the drive - the path part follows the method for laying block paving 4 to 6 cm thick. The levels where the two parts meet must be agreed in advance. Thicker paving needs a deeper dig, and for both surfaces to finish flush, this has to be allowed for at the excavation stage.

What to decide before placing the order

Most disputes over paving do not arise during laying, but because something was not agreed beforehand. It pays to settle the following points:

  • What will drive on it: a car, a van, occasionally a delivery lorry or a bin lorry. Both the paving thickness and the sub-base depth are chosen accordingly.
  • Where the water will go: the fall should run away from the house and garage. For a larger area, or a driveway that slopes down towards the garage, a decision is needed on a channel drain in front of the door and where the water will discharge.
  • Connecting levels: the garage threshold, the front door, an existing path, the road. The finished paving must not be higher than the threshold or form a step.
  • Bond and pattern: bonds that interlock well, such as herringbone, suit vehicle areas. Straight rows running in the direction of travel separate more easily under wheels. A more complex pattern or mix of colours means more cutting.
  • Kerbs and edgings: which type, where, and whether they are flush or raised. Where the drive meets the road, a dropped kerb has to be considered.
  • What the price includes: whether it covers laying only, or also excavation, muck-away, aggregate supply, kerbs, drainage channels and the paving itself. Quotes can only be compared when they include the same items.
  • Consent: a new dropped kerb onto a public road needs the agreement of the local council, and paving over a front garden can require planning permission depending on how the surface drains. Check with the local council before work starts rather than assuming nothing is needed.

Before digging, find out where underground services run, especially gas, electricity and water. If a gas pipe is damaged during digging, move to a safe place and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Diverting gas or electricity supplies is work for qualified, registered specialists only.

How the work is done step by step

  1. Setting out the area with pegs and string lines, fixing levels and falls. Water must drain away from the house; for block paving a fall of about 1.5 to 2.5 % is usual. With less fall, especially on textured paving, puddles form easily.
  2. Stripping topsoil and excavating. For a path the dig is usually about 20 to 30 cm, for a vehicle area roughly 30 to 60 cm depending on the ground and the load.
  3. Compacting the formation, and on clay or soft ground laying a geotextile membrane.
  4. Placing the sub-base of crushed aggregate in layers and compacting each layer separately with a plate compactor.
  5. Bedding the kerbs or edgings on concrete with a concrete haunch behind them. Any channel drains are also installed at this stage.
  6. Spreading the laying course and screeding it with a straight edge over screed rails. The laying course is not compacted before laying and must not be walked on.
  7. Laying the paving to the pattern from a fixed edge, cutting the edges and checking the lines. Blocks are taken alternately from several packs so that shade variations are spread evenly.
  8. Brushing jointing sand into the joints, compacting the area with a plate compactor fitted with a rubber mat, and topping up the joints.

Blocks are laid with a joint of about 2 to 3 mm. Most block paving has spacer nibs on the sides that keep this width automatically, so the blocks should not be forced tight together. If laid too tight, the arrises chip off during compaction; if the joints are too wide, the blocks move under the wheels.

Which sub-base and how deep to dig for driveway block paving

Why does paving sink after a few years? Almost always because of a poor sub-base, not the paving itself. A thicker block will not make up for a fault in the ground below.

For a vehicle area the build-up usually consists of these layers:

  • sub-base of coarser crushed aggregate, for example 0-32 or 0-63 grading, usually about 25 to 40 cm on driveways, less on paths,
  • blinding layer of finer material that closes the surface of the sub-base,
  • laying course of fine crushed aggregate, commonly 2-4 or 4-8 grading, usually 3 to 5 cm thick, on which the paving is laid directly.

Compaction should be done in layers of about 10 to 15 cm, not the full depth at once. A plate compactor only reaches a certain depth, so an overly thick layer stays soft at the bottom and settles later. A lighter plate is enough for a path; for a driveway with 8-10 cm paving a heavier plate is normally used, often a reversible plate weighing several hundred kilograms. A well-compacted sub-base does not give underfoot and shows no marks after the plate has passed over it.

The fall is formed in the sub-base, not in the laying course. The laying course should be the same thickness everywhere. If it is used to take out unevenness in the sub-base, the paving will later settle more in the thicker spots and dips will appear.

Kerbs and edgings along a driveway take the sideways thrust of the wheels, so they are set deeper and with a heavier concrete haunch than on a path. The concrete bed and haunch are usually about 10 to 15 cm, and the kerb must be firmly bedded in, not simply placed on top of the sub-base.

What the price depends on

The guide labour price is €15.00 per m². The actual cost can differ considerably depending on the area and what the job includes. For context on the wider trade, see the overview of block paving and edging costs.

  • Shape of the area: a simple rectangle is cheapest. Curves, corners, steps, posts and curved kerbs mean many cuts, and on a very irregular area the labour can rise by tens of percent.
  • Paving thickness: a 10 cm block is heavier and cuts more slowly with a more powerful saw, so laying takes longer than with 8 cm. Cutting thinner material is priced separately as cutting paving slabs 4-6 cm thick.
  • Type of ground: on clay or waterlogged ground the dig must be deeper, with a geotextile and drainage. A deeper dig also means more aggregate and more compaction.
  • Access: if neither an aggregate lorry nor a mini digger can reach the area and material has to be carried by hand or wheelbarrow, the work slows down several times over.
  • Breaking out: removing old concrete or tarmac and muck-away are separate costs that make up a large part of the price on an old driveway. Before the rubble or a skip load is handed over, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • Precise connections: meeting the garage, a door threshold or an existing path at an exact level needs more measuring and cutting.
  • Drainage: channel drains and gullies are charged separately, including the groundwork to connect them.
  • Pattern and bond: herringbone, mixed formats or coloured bands take longer than a simple bond. Small cobble-style units carry a surcharge for paving small cobbles up to 10x10 cm.
  • Size of the area: on a small area the cost of bringing in plant and materials weighs more, so the price per m² tends to be higher.

When comparing quotes, ask what sub-base depth the contractor has allowed for. A cheaper quote often means a thinner sub-base, and that is exactly the saving that comes back a few years later as a sunken driveway.

How to prepare the site before the contractor arrives

How well the property is prepared also affects how quickly the work goes:

  • Clear access: keep the way clear for a lorry and digger, move cars and remove obstacles such as planters, logs or trailers.
  • Storage area: packs of paving and heaps of aggregate need a firm spot as close to the area as possible, not soft lawn where a lorry will sink.
  • Marked services: if service drawings are available or the utility companies have marked the routes, excavation is faster and without risk.
  • Water and power on site: a water-cooled masonry saw needs water and electricity. If they are not available, the contractor has to bring their own supply.
  • Paving delivered on time: if the paving is bought separately, order the full quantity at once from a single production batch and have it delivered before laying starts.
  • Weather: in rain the sub-base compacts poorly and a wet laying course cannot be screeded level. Heavy rain or frozen ground stops the work.
  • Decisions made: when levels, the pattern or the position of a drain change during the work, part of the finished work often has to be redone.

Typical mistakes and how they show up later

A sub-base that is too thin, or soil instead of aggregate. In the first year the area looks fine. After a winter and a few months of parking, dips form in the wheel tracks and hold water.

Compacting the full depth at once or with too light a plate. The surface gradually becomes wavy and sinks unevenly, most of all where vehicles drive.

Missing or shallow-set kerbs. The edges spread under the wheels, wide joints open between the blocks and the outer rows tip.

Wrong falls. Water stands on the surface or runs towards the house and garage. Puddles form, ice in winter, and the base of the house wall can become damp.

A thick or compacted laying course. The blocks cannot bed in properly, they later settle in the thicker spots and the surface becomes bumpy.

Blocks laid too tight. During compaction and later under wheels, they bear on each other at the arrises, which chip off.

Small cuts at the edges. Narrow pieces of block do not have enough area to interlock and break out or tip under a wheel.

Joints not fully filled. The blocks do not support each other, they rattle when driven over and the edges spall.

How to check the finished area

Inspect the area in daylight and, if possible, after rain as well. At handover it is worth checking that:

  • no dips or waves are visible when a straight edge is run across the surface,
  • water drains away after rain and does not stand anywhere,
  • the fall runs away from the house, garage and steps,
  • kerbs and edgings are firm, straight and in line,
  • blocks do not move or rattle when stepped on,
  • joints are full, even and without large gaps,
  • edge cuts are not too small or broken,
  • the connection to the garage, path and thresholds has no step,
  • channels and gullies are at the right level and water runs into them, not past them,
  • the pattern is consistent across the whole area and block shades are evenly mixed, not in patches,
  • there are no cracks or chipped edges on the surface.

Also ask what sub-base depth the contractor actually installed. Once the paving is laid it can no longer be checked, so photographs of each stage of excavation and compaction are helpful.

Frequently asked questions

The guide price is €15.00 per m². The price depends mainly on the depth of excavation and sub-base, the type of ground, the shape of the area and the number of cuts, access for plant, and whether old concrete or tarmac has to be broken out.