Laying of Park Kerbs

Laying park kerbs means setting low concrete or stone kerbs into concrete as the edge of a path, patio or flower bed. It costs roughly €5.50 per running metre, depending mainly on the ground, curves and access.

Updated 09/2026·10 min read·4 price list items
Standard labour price
€5.50/ lm
Indicative range
€4.40 - €7.15
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Laying of Park Kerbs

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Paving and block paving4 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Kerbs cost

Installation of garden kerbslm€5.50 / lmlmenter quantity-
Installation of road kerbslm€7.50 / lmlmenter quantity-
Installation of kerbs into semi-dry concretelm€10.50 / lmlmenter quantity-
Installation of paving into concrete (as kerb alternative)lm€4.20 / lmlmenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a park kerb does and when it is needed

A kerb forms a solid edge to a paved area. It holds the paving and its bedding together so the edges do not spread. It also separates the paving from lawn, gravel or bark with a clean line. Without it, the edge blocks or slabs are slowly pushed out into the lawn, the bedding washes out, and the edge of the paving starts to break up and sink.

Kerbs are needed whenever a new paved area is built around the house, when the failed edge of old paving is repaired, or when parts of the garden need dividing, for example a flower bed from a path. For an overview of related work, see the guide to block paving and edging costs.

How to choose a kerb and what to decide before ordering

Kerbs are laid before the paving because they form the frame the paving is then laid into. Decisions made at this stage are hard to change later. Before ordering, be clear about:

  • Top edge height: the kerb can sit flush with the paving and the lawn, which makes mowing easy and removes a trip hazard. It can also stand proud, for example next to a gravel or bark bed, so the material does not spill onto the path. The height must suit the thickness of the paving and its sub-base.
  • Fall of the surface: water must drain away, usually away from the house. The fall is set when the kerb line is set out, not later when the paving goes down.
  • Loading: whether the area will only be walked on or a car will park on it. This decides the kerb thickness, the depth of digging and the strength of the bed.
  • Shape of the line: straight lines are the simplest. Curves are built from shorter cut pieces or from radius units, which need ordering in advance.
  • Material and appearance: concrete, stone or simple plastic edging, and possibly a concrete colour matched to the paving.

Types of kerb

The most common are concrete park kerbs (often sold as garden or path edging), usually about 5 to 10 cm thick and around 20 to 25 cm high. They suit paths, patios and areas around the house. Where a car will park, thicker units and a stronger bed are chosen. Road kerbs are heavier and belong on roads and busy car parks - see road kerb installation.

Stone kerbs (for example granite) are very durable and look high quality, but they are heavier, and laying and cutting them takes longer. Split units have uneven faces and less accurate dimensions, so each one has to be levelled individually. Sawn granite is more dimensionally accurate. Plastic garden edging is only used to separate lawn from gravel or mulch. It will not hold paving that is walked or driven on.

A kerb that restrains paving should almost always sit on concrete. Laying in gravel alone is acceptable for purely decorative garden edging, but the kerb will shift or tip more easily over time.

Underground services, permissions and flats

Before digging, check whether any underground services run along the line (water, gas, electricity, telecoms). Utility companies can provide plans of their apparatus, and a cable detector helps to locate cables on site. Diverting or interfering with gas or electrical services is strictly for a qualified specialist - a Gas Safe registered engineer for gas and a qualified electrician for electrics. If the kerbs are part of a new vehicle access, a connection to a public road (for example a dropped kerb) or larger changes to ground levels, check with the local council whether permission is needed. It cannot be assumed in advance that no approval is required. In a block of flats, work to the surrounding areas is agreed with the managing agent or freeholder.

How to lay a park kerb: step by step

Each step builds on the one before. A mistake in height or sub-base will not be hidden by the paving later.

  1. Setting out: pegs and a tight string line mark the route and, above all, the height of the top edge of the kerb, based on the finished paving level and the agreed fall.
  2. Excavation: a trench slightly wider than the kerb is dug. It must be deep enough for the sub-base, the concrete bed and the kerb itself. For a standard park kerb 20 to 25 cm high, this is usually about 35 to 45 cm below the top edge, and deeper for areas used by cars.
  3. Sub-base: the bottom of the trench is compacted and topped with a layer of compacted Type 1 sub-base or crushed stone. Soft, clay or made-up ground is dug out and replaced.
  4. Concrete bed: semi-dry concrete is spread on the sub-base (a mix that can be squeezed into a ball in the hand but does not run), usually about 10 cm thick. Concrete of class C12/15 to C16/20 is commonly used. It is spread as the work progresses, only a few units ahead, so that it does not start to set.
  5. Laying: the kerb is pressed into the bed and tapped down to the string line with a rubber mallet. Level and alignment with the previous unit are checked continuously with a spirit level.
  6. Joints and cuts: a small, even joint is left between units. At corners and on curves the kerbs are cut so the joints are tight.
  7. Haunching: on one or both sides the kerb is supported with a concrete haunch of the same mix, reaching roughly a third to half of its height. This haunch is what stops the kerb leaning over time.
  8. Curing: the concrete is left to harden and the kerbs are not loaded in the meantime. In hot weather the concrete is covered or kept damp.
  9. Backfilling and next steps: the trench on the lawn side is backfilled with soil and work on the sub-base and paving can begin. For slabs bedded directly in concrete without a kerb, see laying paving slabs into concrete without edging.

What affects the price

The guide price for labour is €5.50 per running metre. It applies to a typical job: a straight line on level, firm ground with good access. The final figure is affected by the following:

  • Curves and corners: every cut and radius unit slows the work. A route with many bends costs noticeably more per running metre than a straight line.
  • Slopes and level changes: when the kerb height has to change gradually, more frequent measuring and adjusting of the bed are needed. The effort rises with the steepness of the ground.
  • Poor ground: clay or made-up ground that has to be removed and replaced with stone adds digging, material and compaction.
  • Removing old kerbs and concrete: breaking out and disposal are usually charged separately, and with old, hard concrete they can take longer than the laying itself.
  • Access: if materials have to be carried by hand through the house or garden, and a wheelbarrow cannot get through or concrete and stone cannot be delivered close by, the work takes much longer.
  • Stone kerbs: they are slower to lay than concrete ones, especially split units, which shows in a higher price per running metre.
  • Loading: for an area used by a car, the trench is deeper, the sub-base thicker and the bed stronger, which means more labour and material.
  • Length of the run: on very short sections, preparation and travel make up a larger share of the cost, so the price per running metre can be higher.

When comparing quotes, it is worth asking whether the price includes the kerbs, concrete, sub-base, excavation and removal of spoil, or labour only. For details of the bedding method, see kerb laying and edging installation in dry mix concrete.

What makes the work easier and what slows it down

Apart from the ground itself, a lot depends on how well the site is prepared.

  • Services marked out: if underground services are marked before the contractor arrives, digging can start straight away without careful hand searching.
  • Known paving level: when the paving, its thickness and its level relative to door thresholds and the ground are known, the kerbs are laid right first time. Later changes mean pulling them out.
  • Space for materials: a firm place close to the line for a pallet of kerbs, stone and bags of concrete, and clear access for the delivery vehicle.
  • Water and electricity on site: an outside tap and a socket for the mixer and cutting saw save time.
  • Clear route: shrubs, stones, old hoses and garden furniture removed, and any plants worth keeping moved elsewhere.
  • Weather: concrete should not be laid below roughly 5 °C or on frozen ground. In hot weather it dries out quickly. Long spells of rain waterlog the trench and stop the work.
  • Agreement on spoil: it should be agreed in advance whether excavated soil stays on site or is taken away. Before handing over rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

The most common mistakes when laying kerbs

A kerb that looks fine on the day it is laid can lean after the first winter. The cause is usually one of these mistakes:

  • uncompacted sub-base: the kerb gradually settles and the line becomes wavy,
  • missing haunching: under pressure from the paving and passing cars the kerb tips outwards,
  • concrete too wet: the kerb "floats" in it and the height is hard to hold,
  • wrong height relative to the paving: puddles form by the house or water runs towards the wall,
  • water ignored: a waterlogged sub-base loses strength and frost moves it in winter,
  • early loading: compacting the paving with a plate compactor right next to fresh concrete,
  • light kerbs under cars: a thin unit in a shallow bed where cars park cracks and the paving edge breaks up.

The most common saving is made on the haunch on the lawn side. It cannot be seen after backfilling, yet it is one of the most important parts of the job. It is therefore worth inspecting it before it is covered with soil.

How to check the finished work

At handover, walk the whole line slowly and look along it from the side as well - irregularities show up best at a low angle. Check:

  • that the line is straight or the curves smooth, without steps or kinks,
  • that the top edges of neighbouring units meet without lips,
  • that the kerb height matches the planned level of the paving and the ground,
  • that the fall is as agreed and no water stands along the kerb,
  • that the joints between units are even,
  • that the concrete haunching is continuous and the kerb does not move when pushed,
  • that the cuts are clean and the corners meet without large gaps,
  • that the area is left tidy, with no concrete residue on the paving or kerbs.

Laying kerbs yourself

For a garden path or a patio without cars, the work can be done as a DIY job. The method is the same as above. The tools needed are a spade, string line, pegs, spirit level, rubber mallet, a hand tamper or plate compactor, and a mixer or bucket for the concrete. Kerbs are heavy, so lift with a straight back and preferably in pairs. When cutting with an angle grinder or disc cutter, wear eye protection, ear defenders and a dust mask - cutting wet keeps dust to a minimum. If a gas pipe or electric cable is found along the line, stop work, and the next steps are decided by the utility company or a qualified specialist. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).

Points to watch when doing the work yourself:

  • check the route of underground services before digging,
  • set the string line at the height of the top edge and avoid knocking it during the work,
  • buy a dry concrete mix of a suitable class and mix it to the manufacturer's instructions, only to a semi-dry consistency,
  • spread the bed for only two to three kerbs at a time,
  • check each unit with the spirit level and against the previous one,
  • do not leave out the haunching and smooth it with a trowel,
  • do not load the concrete until the manufacturer allows it, and hold off with the plate compactor next to the paving.

Frequently asked questions

Roughly €5.50 per running metre. The price rises mainly with curves and cuts, slopes, replacing poor ground, breaking out old kerbs, difficult access and stone kerbs. Check whether the price includes materials and removal of spoil.