Building work price list: Laying Paving Slabs into Concrete (Without Edging)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Kerbs cost | ||||
| Installation of paving into concrete (as kerb alternative) | lm | €4.20 / lm | lm | enter quantity- |
| Installation of garden kerbs | lm | €5.50 / lm | lm | enter quantity- |
| Installation of road kerbs | lm | €7.50 / lm | lm | enter quantity- |
| Installation of kerbs into semi-dry concrete | lm | €10.50 / lm | lm | enter quantity- |
What laying paving into concrete means and why it is done
Block paving and setts need a solid restraint at the edge. Without one, the blocks slowly spread outwards. A kerb or edging usually does this job. When paving is laid into concrete instead of a kerb, the outer row is bedded in concrete and backed on the outside with a sloping concrete haunch. For foot traffic the edge then holds much like a kerbed edge, without an extra visible element. The wider context of this work is covered in the overview of block paving and edging costs.
Homeowners choose this for patios, garden paths and paving around the house when they want a clean edge, when there is no room for a kerb, or when the paving meets a lawn or gravel. With no restraint at all, the edge blocks are pushed out by foot traffic and frost, the joints open up and the paving breaks up from the edge inwards.
You may also come across paving laid entirely on concrete. That is a different, rigid construction that needs a concrete slab, movement joints and properly designed drainage. Do not confuse it with this item.
When to choose a concrete haunch and when a kerb is better
A concrete haunch under the outer row works well for paths, patios, paving next to the house and smaller areas with foot traffic. It also suits edges where paving runs into lawn and should be mown without an obstacle, and curves or irregular shapes where a kerb would be hard to follow. For decorative edges in gardens and parks, laying park kerbs is a common alternative.
On a driveway or parking space, car wheels push on the edge far more. The haunch is made wider and heavier, the blocks thicker (usually around 80 mm instead of 60 mm) and the sub-base deeper. For heavier traffic, or an edge next to a change in level, a kerb is often the safer choice, for example a properly bedded road kerb installation. If the paving belongs to a block of flats, agree the work beforehand with the managing agent or residents' management company. For a new access from a public road, ask the local council or highway authority what approval is needed.
Before ordering, it is worth clarifying a few things:
- Line of the edge: exactly where the edge will run, whether it is straight, angled or curved. On curves the edge blocks are cut, which affects time and paving waste.
- One or two rows in concrete: one is enough for an ordinary path, two are used on more heavily loaded paving.
- Paving level against the ground: whether the paving will be flush with the lawn or above it. This decides whether the haunch can be covered and hidden.
- What covers the haunch: soil and turf, gravel or bark. If there is to be lawn alongside, allow for topsoil to backfill.
- What the price includes: whether the contractor also does the dig-out, sub-base and the main paving area, or only the concrete edge.
- Spare blocks: a few extra blocks from the same batch are useful for later repairs, because edge blocks are often damaged when a concreted edge is taken up.
How the paving edge is bedded and haunched in concrete
The main area is laid in the usual way, on a compacted sub-base and a laying course of sharp sand or fine grit. Only the outer row goes into concrete, or two rows on more heavily used paving. The concrete is usually around C12/15 to C16/20. The process normally looks like this:
- Dig-out and sub-base: the excavation and compacted sub-base are prepared across the whole area plus an extra strip beyond the edge, so the haunch has a firm base to sit on.
- String line: a line is set along the edge at finished paving level, with the fall running away from the house, usually around 2 %.
- Concrete bed: a semi-dry concrete is placed under the outer row. When squeezed in the hand it should hold its shape without water running out. The bed is usually about 10 cm thick. Only as much is laid as can be paved before it starts to set.
- Laying the blocks: the blocks are tapped into the concrete with a rubber mallet, exactly to the line, keeping the joint widths.
- Checking levels: level and fall are checked continuously with a spirit level.
- Haunch: a sloping concrete haunch is formed on the outside, reaching about two thirds of the block height. At the base it is roughly 10 to 15 cm wide, and more on driveways, around 20 cm.
- Cleaning and curing: concrete residue is wiped off the blocks while still soft. Fresh concrete is protected with polythene or damp hessian against sun, rain and frost, and left to cure as the mix manufacturer specifies.
- Finishing the paving: once the concrete has hardened, the main area is completed, jointed with sand and compacted with a plate compactor fitted with a rubber mat.
- Backfill: the haunch is covered with soil or gravel and the surrounding ground is brought up to the paving.
Why does the haunch not reach the top of the block? So that soil or gravel can be placed over it and the concrete stays hidden. It still holds the paving firmly from the side.
What affects the price
The work is priced per running metre of edge, that is by the length of edge set in concrete. The paved area itself is charged separately. The guide labour price is €4.20 per running metre. The final figure depends on:
- Shape of the edge: a long straight edge on a well compacted sub-base with good wheelbarrow access is the cheapest. Curves and angled edges where blocks must be cut take much more work and produce more waste.
- Surroundings: an edge next to a wall, steps or the house, where the haunch is awkward to form, takes longer.
- Ground conditions: soft, clay or waterlogged ground has to be stabilised first. That means extra labour and material and a noticeably higher price per metre. Whether it is needed usually only becomes clear during the dig.
- Difference in level: a larger drop between the paving and the surrounding ground means a bigger haunch, more concrete and more backfill.
- Number of rows in concrete: two rows instead of one on a loaded area means roughly twice the concrete and more time per metre.
- Load on the paving: for driveways the haunch is wider, the blocks thicker and the sub-base deeper, so the price per metre is higher than for a path.
- Access: if concrete has to be carried by hand, for example through the house or a narrow side passage, the job takes noticeably longer.
- Small jobs: for just a few metres of edge the price per metre usually rises, because setting up, mixing and cleaning take almost as long as on a longer edge.
What you can prepare so the work goes smoothly
- Marked edge line: be clear where the edge should run, ideally marked beforehand with pegs or spray paint. The shape cannot be changed once concreted.
- Known underground services: before any digging, find out where water, electricity, gas and drainage connections run. If a service lies under the edge, it needs to be dealt with by a specialist before work starts.
- Paving and materials on site: blocks from one batch, sub-base, sand or grit and concrete mix delivered in advance and stored close to the area, not where digging will take place.
- Water and power: access to water for mixing and cleaning and a socket for the mixer.
- Clear space: room to mix concrete and a clear route for the wheelbarrow, with the car parked away from the work area.
- Spoil removal: agree beforehand where the excavated soil will go, whether it stays on site or is taken away, for example in a skip or grab lorry.
- Weather-dependent timing: concrete is not laid in frost or strong heat. In bad weather the work is moved, so allow for this in the schedule.
- Leave the fresh edge alone: until the concrete has hardened, keep children and dogs off the edge and do not put anything on it.
Typical mistakes and how they show up later
Poorly compacted sub-base under the edge. The edge is concreted onto a sub-base that has not been properly compacted. The concrete then settles with it and the outer row cracks or tips over.
Concrete too wet. It slumps, the haunch does not hold its shape and the blocks float in it. The edge is then out of line and the blocks sit at different heights.
Token haunch. The haunch is only a thin skim. Such a restraint cracks at the first frost or load and the edge starts spreading as if there were no restraint.
Plate compactor on a fresh edge. Running it over a freshly concreted edge, or without a rubber mat, loosens or chips the edge blocks.
Wrong fall. A concreted edge cannot be corrected once hard, so the fall must be set at the string line stage. Block paving is usually laid at around 2 %, typically between 1.5 and 2.5 %. With less fall, for example only 1 %, water ponds in low spots, and with fall in the wrong direction it runs towards the house.
Concreting in unsuitable weather. Below about +5 °C concrete hardens very slowly and can freeze, while in heat it dries too fast and cracks. A fresh edge must be protected from direct sun, rain and frost.
Paving left uncleaned. Dried concrete on the face of the blocks is hard to remove and leaves grey stains.
Edge joints filled with concrete. The joint between the outer row and the main area should be filled like the others, not with concrete up to the surface. Otherwise the edge looks different and is harder to take up for repairs.
How to concrete a paving edge yourself
This is manageable as a DIY job if the compacted sub-base is ready, the edge is straight or gently curved and you have some patience. The process is the same as described above for a contractor. For driveways, soft ground or larger level differences it is better to call a professional. You will need a string line, pegs, a spirit level, a rubber mallet, a bricklaying trowel and bagged concrete mix or a mixer. Before digging, check where underground services run. If you prefer a conventional edge, the related method of kerb laying and edging in dry mix concrete uses a very similar technique.
These principles help when working yourself:
- Work in short sections, roughly one to two metres at a time, and only then mix the next batch.
- Start on a straight section and leave curves until last, when you are used to the consistency of the concrete.
- Cut blocks for curves in advance and lay them out in order, so there is no waiting for cutting while the concrete sets.
- When cutting paving with an angle grinder, wear safety glasses, a dust mask and ear defenders, and ideally cut wet.
- Wear gloves when handling concrete, as cement irritates the skin.
- Check each section once more with the line and level before it sets, as nothing can be moved later.
- Do not finish or compact the main area before the concrete has hardened according to the mix manufacturer's instructions.
How to check the finished work
- the outer row runs in one straight line without kinks or steps,
- the edge is level with the rest of the paving, nothing sticks up or sinks,
- the fall carries water away from the house and no water stands on the paving,
- edge blocks do not rock or tip when stood on,
- the concrete haunch is continuous, without cracks, and there are no bare gaps under the blocks,
- no dried concrete residue is left on the face of the blocks,
- joints are filled and the edge joints are not filled with concrete up to the surface,
- the haunch is covered and the surrounding ground meets the paving,
- cut blocks in curves are clean and without large gaps.
Frequently asked questions
The guide price is €4.20 per running metre. The final figure mainly depends on the shape of the edge, the ground conditions, the number of rows in concrete and whether cars will drive on the paving.
For paths and patios, yes, provided the sub-base is well compacted and the haunch is substantial enough. Under car traffic the edge is loaded more, so a wider haunch and thicker blocks are used, or a kerb is chosen instead.
Usually after a few days, once the concrete has hardened enough. The exact time depends on temperature and the mix, so follow the manufacturer's instructions. Compacting the paving and driving on it needs a longer wait.
No. With this item only the edge goes into concrete. The main area stays on a sand or grit laying course so it can drain and can be taken up if needed.
Yes. The edge blocks are lifted, the old bedding under the edge is removed, the sub-base is recompacted and the blocks are relaid in concrete with a haunch. If the edge has already spread, a few rows behind it often need relaying too, so the joints line up again.
Yes, but with effort. The concrete has to be broken out and the edge blocks are often damaged in the process, so allow for replacing them when repairing.
Related work
How park kerbs are set in a concrete bed, what base they need, which mistakes to avoid and how to check the finished work.
How road kerbs are set in a concrete bed, what base they need, when to install them and how to check the finished work before you accept it.
How kerbs and edging are set in dry mix concrete, what base they need and what to watch for with garden, path and road kerbs.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
How to lift block paving without needless damage, when to reuse the blocks, and what to watch with kerbs, buried services and waste disposal.
What a levelling course under block paving is, which material to use, how thick it should be and how to screed it flat before laying.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.