Building work price list: Road Kerb Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Kerbs cost | ||||
| Installation of road kerbs | lm | €7.50 / lm | lm | enter quantity- |
| Installation of garden kerbs | lm | €5.50 / lm | lm | enter quantity- |
| Installation of kerbs into semi-dry concrete | lm | €10.50 / lm | lm | enter quantity- |
| Installation of paving into concrete (as kerb alternative) | lm | €4.20 / lm | lm | enter quantity- |
What a road kerb is and when it is needed
A road kerb is a heavy precast concrete unit that edges a carriageway, driveway or car park and separates it from a footway or soft landscaping. It holds the edge of the asphalt or paving in place, guides surface water towards gullies and stops vehicles leaving the paved area. Kerbs are needed for a new driveway, a car park, or the repair of an old edge that is breaking up, rocking or holding water. An overview of related edging work is available in the guide to block paving and edging costs.
A kerb looks like a simple piece of concrete, but its service life depends mostly on what cannot be seen: the sub-base, the concrete bed and the haunching behind it. The price is calculated per running metre, meaning the length of the kerb line, not the area of the road.
What to decide before digging starts
Kerbs are laid before the paving or asphalt. They form the fixed edge the surface is laid against, so adding them later makes little sense. Most decisions should be made together with the design of the whole area:
- Finished surface level. The kerb is set to the level of the future asphalt or paving. If the thickness of the surface and sub-base layers is not yet known, the kerb cannot be set correctly either.
- Where the water goes. Decide whether the area will fall towards a gully, onto soft landscaping or into a soakaway. The kerb falls are set accordingly.
- Where the entrances and crossings are. At these points the kerb is lowered, or dropper and transition kerbs are used. Changing this afterwards means breaking out finished kerbs.
- What loads the area must carry. Whether only cars will use it, or also vans, refuse lorries or delivery lorries with building materials.
- What happens to the old edge. Whether the old kerbs are just realigned, or removed completely along with their bed.
Types of kerb and when to choose each
In the UK, a standard road kerb is usually a precast concrete unit around 915 mm long, about 255 mm high and 125 or 150 mm wide, in half-battered or bullnosed profile. It is heavy and strong, so it can take lorries driving over the edge. Other variants are also used:
- dropped kerbs with a low, sloping profile that let a vehicle drive smoothly onto a footway or into an entrance,
- transition (dropper) kerbs that join a full-height kerb and a dropped kerb without a step,
- radius kerbs for bends and corners, so the edge is not made up of short straight sections,
- edgings and park kerbs, which are lower and thinner and suit only footpaths and gardens, not roads - see laying park kerbs for that work.
The choice should be driven by load, not appearance. If a delivery van or a refuse lorry uses the area, a garden edging will not last long. Good quality concrete kerbs are made to the applicable standards and should be frost resistant and resistant to de-icing salt. When the delivery arrives, it is worth checking that the units are whole, without chipped arrises, and from one batch so the colour matches.
How the installation is carried out step by step
- Setting out the line and level. The route is marked with pins and a string line, and level and falls are set with a level or laser to suit the future surface.
- Excavating the trench. The trench must be deep and wide enough for the granular sub-base, the concrete bed, the kerb and the concrete haunching behind it.
- Compacting the base. The trench bottom is compacted, a layer of sub-base is placed and compacted thoroughly again with a plate compactor.
- Concrete bed. A semi-dry, stiff concrete is laid on the sub-base so it holds its shape and the kerb does not sink into it.
- Laying the kerbs. The units are laid onto the fresh bed, tapped down to the string line with a rubber mallet, and level and falls are checked continuously.
- Cutting and radii. Where a shorter unit or a joint to an existing edge is needed, the kerb is cut with a diamond blade saw. Radius kerbs are laid on bends.
- Haunching. Concrete is placed behind the kerb, and on roads often in front as well, so it does not tilt when a wheel strikes it. On longer runs, movement joints are left in the haunching at regular intervals so the concrete does not crack with temperature changes.
- Joints and finishing. A narrow joint is left between units and filled with mortar where specified. The surrounding ground is backfilled and compacted.
- Curing. The concrete in the bed and haunching must harden. Only then is the area loaded by plant laying asphalt or paving, and later by vehicles.
Sub-base, concrete bed and drainage
Why does a kerb lean after a few winters when it was straight at first? The cause is almost always the base or water, not the concrete unit itself.
The sub-base under the bed is typically around 150 to 200 mm thick, more on clay or waterlogged ground, and must be well compacted, otherwise it will settle over time. On roads, the concrete bed is usually around 100 to 150 mm thick. Concrete of strength class C12/15 to C20/25 is commonly used for the bed and haunching, depending on the load.
Haunching is roughly 100 to 150 mm thick and usually reaches a third to a half of the kerb height. The kerb upstand above the finished road surface is typically around 100 to 150 mm on an ordinary street and is reduced at entrances and crossings. The rest of the kerb height sits below the surface, within the road construction and the concrete.
In older practice, a dry mix was often placed and simply watered after laying. This method is less reliable, as the concrete may not harden evenly. Properly mixed semi-dry concrete is the better choice. For lighter edging work where the dry mix method is still used, see kerb laying and edging in dry mix concrete.
Water must have somewhere to go. The road edge falls towards gullies or soft landscaping, and the kerb must not form a dam with a puddle behind it. Water that soaks into the base and freezes in winter can push a kerb out of even a good bed.
What affects the price of installation
The guide price for labour is €7.50 per running metre. Treat it as a starting point for standard installation on a straight run. The actual price is mainly affected by the following:
- Length of the run. On a short run, preparation and delivery of plant and concrete make up a larger share of the cost, so each metre is dearer. Long continuous runs cost less per metre.
- Ground conditions. Firm sandy or gravelly ground is the easiest. Clay or waterlogged ground needs deeper excavation and more sub-base, which raises the price noticeably.
- Removing the old edge. Breaking out and disposing of old kerbs and concrete is extra work, and with thick old concrete it can double the labour on that section. Before the rubble or a skip load leaves site, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Radii and cutting. Many bends, cut units and joints to existing asphalt slow the work, as each cut and joint must be measured precisely.
- Level changes. Dropped kerbs at entrances, transition kerbs and dropper units mean more setting out than a continuous line.
- Access for plant. Where a digger and a delivery lorry cannot reach, digging is done by hand and heavy units are carried or moved on a trolley. This is slower and more expensive.
- Working next to traffic. If traffic management or a partial closure is needed, both cost and time increase.
- Materials. Whether the kerbs are included in the price or bought separately, and whether they are standard straight units or more expensive radius and special units.
When comparing quotes, check whether the price per running metre includes excavation, sub-base, concrete for the bed and haunching, jointing and removal of spoil, or only laying the units.
What makes the work easier and what slows it down
Apart from the ground, a lot depends on how well the site is prepared. The work goes faster when:
- there is clear space for the concrete lorry and for stacking kerbs, without parked cars, spoil heaps or materials in the way,
- it is agreed where the excavated soil will go, whether it stays on site or a skip is ordered,
- water is available on site, for example to keep the concrete damp in hot weather,
- a power socket is accessible for a mixer or tools,
- neighbours know about plant movements and temporary restrictions on access.
On the other hand, rain that turns the trench to mud, frost and waiting for special units that are not usually in stock all slow the work. Radius and dropped kerbs are best ordered well in advance.
Installing road kerbs as a DIY project is not recommended. A single unit typically weighs several tens of kilograms, easily traps fingers or injures backs, and without a level and a plate compactor it is hard to achieve a straight, solid line.
Permissions, underground services and weather
Work on an edge within your own property is usually a minor alteration. As soon as the work affects a public road, footway or a vehicle crossing onto the highway, consent from the local council as highway authority is needed. A new or widened dropped kerb for a driveway normally has to be approved by the council, and on the public highway the work is often carried out or supervised by the council or an approved contractor. Check the requirements with the council in advance and do not assume that a simple notification is enough. Approval should be in place before the start date, otherwise the contractor will be waiting. In a block of flats, alterations to shared areas are decided by the managing agent or the freeholder.
Before excavation, have the underground services located, especially gas, electricity, water and telecoms cables, ideally before the contractor arrives. If a gas pipe is damaged or you smell gas, leave the area immediately and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Excavation near cables and gas services should be left to an experienced contractor.
Concreting is best done from spring to autumn. Below about 5 °C concrete sets slowly and risks frost damage, and above about 30 °C it dries out quickly and needs to be kept damp or covered. Kerbs are not laid on a frozen or muddy base.
Common mistakes and how they show up later
Poorly compacted base. The kerbs gradually settle unevenly and the line becomes wavy. This often appears only after the first winter or after a heavy vehicle has passed.
Missing or thin haunching. The kerb gradually tilts outwards under wheel loads and a gap opens up behind it.
Haunching without movement joints. On a long continuous run, the concrete cracks at random points with temperature changes, and the cracks let water reach the bed.
Wrong falls. Water stands along the edge, runs under the paving and damages the base in winter. The paving next to the edge starts to sink.
Kerb set too shallow. The unit feels solid but moves under the first load.
Garden edging used beside a road. The thin unit cracks or breaks off, usually at an entrance where wheels strike it most often.
Dry mix instead of mixed concrete. The bed hardens only in places, and the kerbs come loose one by one over time.
Loading fresh concrete. If vehicles run over the kerbs before the concrete has hardened enough, the bed is damaged and the repair means lifting the units and laying them again.
No dropped kerb at the entrance. Vehicles hit the edge, damaging tyres and the kerb itself, and lowering it later means breaking out.
How to check the finished kerbs
At handover, walk the whole length of the line, look at it from a distance and close up, and go through this list:
- the line is straight or smoothly curved, without steps or kinks,
- adjacent units have no level difference and the joints are even,
- no unit moves when pushed firmly with a foot,
- concrete haunching is visible behind the kerbs, not just soil,
- the upstand above the surface matches what was agreed and the kerb is dropped at entrances,
- after rain or hosing, water drains away and does not stand along the edge,
- the kerbs are not cracked, spalled or soiled with concrete,
- cut units are cut straight and are not shorter than reasonable,
- the contractor has said when the area can take vehicle traffic.
Once the kerbs have cured, the surface can follow, for example paving slabs laid into concrete or block paving against the new edge.
Frequently asked questions
As a guide, €7.50 per running metre. The final amount depends mainly on the ground, removal of the old edge, the number of radii and access for plant. Check whether the price also covers excavation, sub-base and concrete.
Usually 100 to 150 mm remains above the finished surface, and the rest of the kerb height sits below it, within the road construction and the concrete bed. The haunching normally reaches a third to a half of its height. The exact setting depends on the kerb type, the load and the thickness of the sub-base layers.
For roads, driveways and car parks, yes - the concrete bed and haunching are essential. Only light garden edgings in areas without vehicle traffic can be laid without concrete.
It depends on the concrete and the weather. In normal weather, cars can usually be allowed after about 7 days, while heavy plant and cold weather require longer. The contractor will confirm the exact time based on the concrete used.
If a unit is whole and has moved only slightly, it can be lifted, the bed corrected and the kerb relaid. If the base is damaged over a longer section, it is usually worth rebuilding the whole section, including the base.
A road kerb is taller, thicker and stronger, designed to take vehicle loads. A park kerb is lower and thinner and is used to separate footpaths, lawns and planting beds.
Related work
How park kerbs are set in a concrete bed, what base they need, which mistakes to avoid and how to check the finished work.
How the edge row of paving is bedded and haunched in concrete instead of edging, when it makes sense, common mistakes and how to check the work.
How kerbs and edging are set in dry mix concrete, what base they need and what to watch for with garden, path and road kerbs.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
How to lift block paving without needless damage, when to reuse the blocks, and what to watch with kerbs, buried services and waste disposal.
What a levelling course under block paving is, which material to use, how thick it should be and how to screed it flat before laying.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.