Building work price list: Sprayed Closed-Cell Foam Insulation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Insulation cost | ||||
| Spray foam insulation - closed cell | m² | €17.00 / m² | m² | enter quantity- |
| Spray foam insulation - open cell (20-25 cm) | m² | m² | - | |
| Spray foam insulation - open cell (30-35 cm) | m² | m² | - | |
| Blown-in glass wool insulation for lofts and cavity walls | m² | €15.00 / m² | m² | enter quantity- |
What rigid spray foam is and where it is used
Rigid spray foam is a polyurethane foam sprayed by a specialist contractor onto ceilings, rafters, walls or foundations. It expands on contact and sets within moments. The result is a continuous, seamless layer that insulates well and absorbs almost no water. Boards and mineral wool have joints where heat can escape. Spray foam has none, and it also fills irregular shapes and the gaps around pipes and other penetrations.
Rigid foam suits any situation that needs insulation that resists water and is mechanically strong:
- pitched roofs and loft rooms, where the foam fills the space between rafters and seals awkward details around chimneys and roof windows,
- flat roofs, where the foam is sprayed from outside and then protected with a top coating or a further layer,
- foundations, plinths and substructures in contact with soil or exposed to splashback,
- industrial units, warehouses, agricultural buildings and cold stores, where large areas of metal or concrete need insulating quickly,
- complex structures, where boards are hard to cut and would leave many joints.
If the main aim is sound reduction in a dry interior, for example in a partition or an intermediate floor, rigid foam is not the best choice. Soft open-cell foam or mineral wool performs better there. For lofts and existing cavities, blown insulation for lofts and cavity walls is another common option.
Open-cell and closed-cell foam: comparison and drawbacks
Sprayed PUR foam is made by mixing two liquid components, a polyol and an isocyanate. They only combine in the spray gun, foam immediately and set within seconds. The formulation and density determine the type of cells that form.
- Closed-cell (rigid foam): the cells are sealed and filled with gas. The foam is strong, holds its shape and takes up very little water. Typical systems start at a density of roughly 30 kg/m³, with a closed-cell content of around 90 % or more.
- Open-cell (soft foam): the cells are interconnected. The foam is light, flexible, vapour-open and better at reducing noise, but it does not cope well with moisture. It is mainly used in dry interiors, for example as open-cell PUR spray foam at 20-25 cm.
Rigid foam is often chosen to save space. Manufacturers typically quote a thermal conductivity (lambda) of about 0.025 W/(m·K), against roughly 0.037 W/(m·K) for open-cell foam. A thinner layer therefore gives the same insulating effect. This matters in a loft with shallow rafters, where headroom is precious. Achieving the same result with open-cell foam usually means a much thicker layer, such as open-cell spray foam insulation 30 to 35 cm thick.
Rigid foam is far less vapour-permeable than open-cell foam, but it is not fully vapour-tight. Its vapour resistance factor is usually in the tens, so at normal thicknesses it behaves more like a vapour control layer than a full vapour barrier. Any moisture that gets into the structure can only escape through it slowly.
Drawbacks of rigid foam to bear in mind:
- it usually costs more per m² than open-cell foam or mineral wool,
- standard foam is combustible and must be covered in habitable rooms,
- nobody may be in the space during spraying or for a period afterwards,
- it bonds firmly to the substrate, so later removal is only possible mechanically, by cutting and scraping, with considerable effort,
- it is less effective at reducing noise than soft materials,
- some mortgage lenders and surveyors are cautious about spray foam on the underside of roofs, so it is worth checking first if a sale or remortgage is planned.
What to decide before placing an order
Spraying is quick, but changes afterwards are difficult. The following points should be clear in advance:
- Build-up of the structure: on a pitched roof the foam is just one layer of the whole build-up and ties in with sheet metal and roofing work, meaning the breathable membrane or sarking boards, battens and roof covering. The designer decides exactly where the foam goes, whether a ventilated gap is needed and how the roof timbers will be protected from moisture.
- Vapour control layer: with timber rafters, do not leave it out simply because the foam is rigid. Whether it is needed depends on a calculation for the whole build-up and on the manufacturer's system. Timber must never be sealed in with moisture.
- Layer thickness: this follows from the required thermal performance. Ask for it to be stated in the design and then in the contractor's quotation.
- Condition of the roof or wall: leaks, damaged roof coverings, damp masonry or timber with rot or insect damage must be repaired before spraying. In homes built before 2000, have suspect materials tested before drilling or stripping. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Services: electrical wiring, waste pipes, ventilation ducts and heating pipework in the insulated area should be complete and tested. Electrical work must only be carried out by a qualified electrician to BS 7671:2018+A4:2026, the current IET Wiring Regulations. A new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts. Junction boxes and joints that will need access later must not be sprayed over.
- Covering layer: in a habitable loft this is usually plasterboard, on a flat roof or outdoors a protective coating or further layer. Agree in advance who will do it and when.
- Documents: ask for the technical data sheet, the declaration of performance and the reaction to fire classification.
- Approvals and consent: for insulating a facade, a flat roof or any other alteration to the building, check with local building control what approval is required. In a block of flats, always contact the freeholder or managing agent first, as the roof and external walls are normally shared or retained parts of the building.
How spraying is carried out step by step
This work is always done by a specialist contractor with spraying equipment. Isocyanate irritates the airways during spraying, so the operative needs a respirator or breathing apparatus and everyone else must stay out of the area. It is not suitable work for a non-specialist.
- Survey: a technician inspects the structure, confirms the layer thickness against the design and checks that the roof or wall is dry and free of leaks.
- Masking: windows, floors, electrical installations and anything that must not be sprayed are covered with sheeting and taped. Cured foam is very hard to remove from surfaces.
- Substrate preparation: the surface is cleaned of dust, grease and loose material.
- Checking conditions: the operative measures air and substrate temperature and humidity and compares them with the technical data sheet. Manufacturers generally require substrate and air temperatures of at least around +5 to +10 °C and a dry surface above the dew point.
- Spraying: the foam is applied in several passes until the required thickness is reached. Each pass is usually 2 to 5 cm, and the manufacturer sets the maximum. The next pass is only applied once the previous one has cooled.
- Trimming and measuring: excess foam is trimmed, for example flush with the rafters, and the thickness is checked at several points.
- Ventilation: the space is aired and the re-occupation time stated by the manufacturer is observed.
- Finishing: as designed, a vapour barrier or vapour control layer and covering layers are added, such as plasterboard in a loft or a protective coating on a flat roof.
What affects the price
The guide price for the work is €17.00 per m². The final cost varies from job to job. The main factors are:
- Layer thickness: the biggest influence. Foam usage rises in proportion to thickness, so doubling the thickness needs roughly twice the material. Labour, travel and masking stay largely the same, so the price per m² rises more slowly than the thickness.
- Complexity of the structure: a large flat area in an industrial unit or on a flat roof is the cheapest per metre. Roofs with many rafters, collar ties, chimneys, pipes and roof windows take much longer and need more foam for trimming and making good.
- Access and height: a low loft where the operative works bent over, or high ceilings needing a platform or scaffold, add to the cost.
- Condition of the substrate: a dry, clean substrate carries no extra charge. Dusty, greasy surfaces or ones covered with remains of old insulation must be cleaned first, which adds labour.
- Size of the job: on small jobs the cost of bringing and setting up the equipment is spread over few square metres, so the price per m² is noticeably higher. Contractors often set a minimum charge.
- Masking: an occupied or furnished space, many windows and lots of services mean more time spent masking.
- Covering and protective layers: fire protection boarding, a UV-protective coating or a further layer on a flat roof are usually charged separately.
Only compare quotations for the same area and the same thickness. A cheaper quotation may mean a thinner layer or a different foam density.
What makes the job easier and what slows it down
Spraying a typical loft often takes just a day, but a lot of time is lost waiting for the site to be ready. It helps if the client arranges:
- a cleared loft or ceiling area with no stored items, furniture or old belongings,
- access for the equipment vehicle as close to the house as possible, as the hoses have a limited length,
- agreement in advance on whether the contractor needs an electricity or water supply,
- completed services and a repaired roof covering before the spraying date,
- that no people or animals are in the house during spraying and ventilation, or alternative accommodation for the necessary time,
- advance notice to neighbours if windows or shared areas nearby are open.
The job is delayed if the date falls in cold or very humid weather and spraying has to be postponed. It is also held up if the substrate turns out to be damp on the day and has to dry first.
Typical mistakes and how they show up later
Open-cell foam in a damp location. The cheaper open-cell foam is sometimes chosen for a plinth or flat roof. It absorbs moisture and loses effectiveness over time. This shows up as higher heating bills and damp patches on the structure.
Vapour control layer omitted without a calculation. If only rigid foam is relied on in a timber roof, vapour from inside can condense on the cold side. The timber then becomes damp, which may only show as mould or rot years later.
Poor substrate preparation. Dust, grease or moisture weaken adhesion and the foam may later come away. Voids then form between the foam and the substrate, where condensation collects.
Spraying in unsuitable weather. In cold or very humid conditions the foam expands and cures unevenly. The result is brittle, soft or tacky areas with poorer insulation.
Too thick a layer in one pass. A thick pass overheats and the foam can crack, delaminate or give off an unpleasant smell.
A thinner layer than agreed. The insulation then falls short of the designed performance. It cannot be seen, and only shows as a colder loft in winter and overheating in summer.
Foam left exposed to sunlight. UV radiation gradually breaks down PUR foam, so outdoors it must always be covered. An unprotected surface yellows, turns powdery and gradually wears away.
Missing fire protection. Standard PUR foam usually falls into reaction to fire class E. In a habitable loft it therefore normally needs covering, for example with plasterboard. Treat claims of "non-combustible foam" with caution and ask for the specific classification.
Spraying onto a leaking roof or damp timber. The foam hides the problem but does not solve it. Water spreads unnoticed beneath it, and by the time it is discovered, the repair means removing the foam.
Spraying directly onto the underside of tiles. When a damaged tile or the whole covering needs replacing, the foam has to be laboriously removed and the roof repair becomes much more expensive.
Junction boxes and joints sprayed over. If wiring or pipework needs repair later, the foam has to be cut out and the area sealed again.
How to check the finished insulation
At handover, inspect the whole area before it is covered with plasterboard or another layer, as defects cannot be seen afterwards. Check that:
- the layer is continuous, with no holes, cracks or places where the substrate shows through,
- the thickness matches the agreement, verified with a probe or by measuring at several points,
- the foam is firmly bonded to the substrate and does not come away when pressed,
- the surface is even, without large bubbles or soft, tacky areas,
- details around chimneys, windows and penetrations are thoroughly sealed,
- the foam does not cover electrical boxes, joints or access points that need to stay accessible,
- windows, floors and services are free of foam overspray,
- outdoors, the foam is covered or a date for the protective layer has been agreed,
- no strong smell remains in the space after ventilation,
- you have the technical data sheet, reaction to fire classification and warranty terms.
Frequently asked questions
The guide price is €17.00 per m². The final price depends mainly on layer thickness, the complexity of the structure, access, the size of the job and whether covering or protective layers are also needed.
Thanks to its closed cells it absorbs almost no water, which is why it is used on foundations, plinths and flat roofs. It only replaces a proper waterproofing layer if the manufacturer explicitly states this for the system and the design allows for it.
It depends on the structure and the thermal performance required by building regulations. Insulation on renovations in England must currently meet Approved Document L (2021 edition). The new 2026 edition (Future Homes Standard) takes effect on 24 March 2027. In lofts, around 10 to 15 cm of rigid foam is often specified, but the exact thickness should be set by the designer or an energy assessor. Less rigid foam is usually needed than open-cell foam.
Not during spraying and for a period afterwards. The space must be vacated and thoroughly ventilated. The foam manufacturer states when it is safe to return. For typical systems this is around a day.
It may be. Rigid foam lets little vapour through, but at normal thicknesses it acts more like a vapour control layer than a full barrier. With timber rafters, the decision rests on a calculation for the whole build-up and on the manufacturer's system. Do not omit it without the designer's confirmation.
If the foam is protected from sunlight, moisture and mechanical damage, it can be expected to last for decades, like the other layers of the roof. Lifespan is shortened mainly by an unprotected outdoor surface and by moisture getting behind the foam.
It depends on the extent of the work and whether the appearance or structure of the building changes. Check with local building control in advance. In a block of flats, agree the work with the freeholder or managing agent first.
Related work
How open cell PUR spray foam is applied to roofs and ceilings, when 20 to 25 cm is enough, and what to check before the foam is covered.
How open-cell spray foam is applied at 30 to 35 cm: extending rafters, spraying in passes, vapour control, typical mistakes and checks before plasterboard.
How glass wool is blown onto a loft floor and into cavity walls, what depth and density to ask for, common mistakes and how to check the work.
What a roof replacement costs: stripping, checking the roof structure, underlay, tiles or metal, flashings, asbestos cement and a 150 m² labour example.
Price list for sheet metal works in 2026: gutters and downpipes, chimney flashing, sills, cappings and metal roofs. What drives the cost and a NUMIQ estimate.
How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.