Building work price list: Sprayed Foam Insulation (Open Cell PUR, 20-25cm)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Insulation cost | ||||
| Spray foam insulation - open cell (20-25 cm) | m² | €13.00 / m² | m² | enter quantity- |
| Spray foam insulation - closed cell | m² | €17.00 / m² | m² | enter quantity- |
| Spray foam insulation - open cell (30-35 cm) | m² | m² | - | |
| Blown-in glass wool insulation for lofts and cavity walls | m² | €15.00 / m² | m² | enter quantity- |
What open-cell spray foam is and when it is used
Open-cell spray foam insulation is a soft polyurethane foam. The installer sprays it directly between the rafters, onto sloping ceilings or onto the ceiling below an unheated loft. Two components are mixed in the spray gun. Within seconds the foam expands several times and forms a continuous layer without joints. It also fills corners, the areas around timbers and small irregularities that boards or quilt rolls struggle to reach.
It is mostly chosen in these situations:
- when converting a loft into a habitable room,
- when renovating an old roof while the structure is open from the inside,
- when a complicated roof with many timbers, struts and corners needs to be insulated quickly and without gaps,
- when the loft room is cold in winter, overheats in summer and the existing insulation is poor or missing.
This work is sometimes described as "blown PUR insulation", but the foam is actually sprayed, not blown. Blown insulation for lofts and cavity walls is a different material, such as mineral wool or cellulose fibre blown loose into the space.
What to decide before booking an installer
Once cured, spray foam is difficult to remove, and the ceiling will cover it for decades. Several points are therefore worth settling before the spraying date.
Layer thickness
This insulation is priced in two variants that differ only in thickness. Open-cell foam insulates slightly less per centimetre than closed-cell foam, so it is applied more thickly.
- 20 to 25 cm is the usual standard for pitched roofs and ceilings of habitable loft rooms. Rafters are often only about 14 to 18 cm deep, so even at this thickness battens are usually added under the rafters.
- 30 to 35 cm suits those aiming for a low-energy standard or noticeably better comfort in both summer and winter. More material is used, spraying takes longer and deeper battens are needed under the rafters, so the room loses more headroom. More details are given under open-cell spray foam insulation at 30 to 35 cm.
The right thickness does not depend on centimetres alone. What matters is the resulting thermal performance of the whole roof, calculated from the thickness and the thermal conductivity of the specific foam. Open-cell PUR foam has a thermal conductivity of roughly 0.036 to 0.040 W/(m·K), and the exact value is given in the technical data sheet. The required U-value for the roof follows from the applicable building regulations. In England, insulation on renovations and extensions must currently meet Approved Document L (2021 edition), and the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027. Wales and Scotland have their own energy standards. The calculation for your particular roof build-up should be done by a designer or energy assessor. For a new design it is worth aiming for better than the minimum, because nobody will want to open the roof again in a few years.
A simple way to check how much battening is needed: measure the depth of a rafter. If the rafter is, for example, 16 cm deep and you want 22 cm of insulation, the missing 6 cm must be made up with battens under the rafters. This lowers the ceiling line and the room loses a little height.
Roof build-up and design
The foam is only one layer of the roof. The full build-up, meaning the breathable roofing membrane, the ventilated gap above it, the vapour control layer on the room side and the junctions with gable walls and the chimney, should be specified by a designer. Without a clear build-up it is hard to compare quotes or to check the finished work.
Approvals and consents
If you are insulating a roof in a block of flats, first agree it with the freeholder, managing agent or management company, as the roof is a shared part of the building. For a loft conversion or work on the roof, check with your local authority building control what approval you need. Check the Planning Portal before you start: many house extensions are permitted development, but you will usually still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. In Scotland, structural alterations, extensions and loft conversions need a building warrant from the council before work starts. Do not assume that no approval is required. It is also worth checking with your mortgage lender before ordering, as some lenders and surveyors are cautious about spray foam in roofs.
What must be finished before spraying
- roof windows are fitted and the roof covering is complete, with no leaks,
- flashings around the chimney, roof windows and other details are finished, as part of the sheet metal works,
- the roofing membrane is intact or repaired,
- electrical wiring in the roof slope is complete, installed to BS 7671:2018+A4:2026 and photographed, because it will no longer be accessible under the foam. A new circuit is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start,
- positions of light fittings, sockets and ventilation ducts through the ceiling are decided,
- the area around the chimney is dealt with according to the instructions of the foam manufacturer and the chimney system manufacturer.
Open-cell vs closed-cell PUR foam: pros, cons and roof build-up
The cells of open-cell foam are interconnected, so it is soft, light and vapour-permeable. Sprayed closed-cell foam insulation is harder, insulates better per centimetre and absorbs almost no water, so it is better suited to flat roofs, plinths or foundations.
Advantages of open-cell foam in a loft:
- it forms a continuous layer without joints and seals the roof structure against air movement,
- it is vapour-permeable, so the build-up can dry out if moisture gets in,
- it dampens the noise of rain and hail well,
- it is light and does not load the roof timbers.
Disadvantages to allow for:
- it soaks up water if the roof leaks, so the covering and membrane must be in good condition,
- it needs a thicker layer than closed-cell foam for the same thermal performance,
- it is difficult to remove once cured, and services underneath are inaccessible,
- polyurethane is combustible, so it must not be left exposed in a habitable loft.
For the whole roof to work, the rest of the build-up must also be right:
- under the roof covering there is a roofing underlay with a ventilated gap between it and the covering, and the foam is sprayed from below onto the membrane, never directly onto the tiles,
- on the warm side, that is the room side, a vapour control layer or vapour check membrane is fitted as specified by the designer,
- below that comes the ceiling, for example plasterboard, which covers the foam,
- on a completely new roof, counter-battens and tile battens are fixed above the membrane,
- the specified clearance is kept around the chimney.
How spraying is carried out step by step
The work is done by a trained installer with spraying equipment. The components must be metered precisely, heated to the correct temperature, and the operatives must protect themselves from fumes. The usual procedure is:
- Survey and measuring: the installer assesses the roof structure, rafter depth and condition of the membrane and proposes the layer thickness. The areas of the slopes, ceiling and gables, if they are to be insulated, are measured.
- Checking the substrate: the timber and membrane must be dry and not frozen. Timber moisture is measured with a moisture meter and should generally be no more than about 18 to 20 %, with the exact limit set by the foam manufacturer. If the roof is damp or cold, the work waits or the space is heated.
- Preparation: dust and debris are removed, and windows, floors, stairs and anything that must stay clean are covered. Penetrations, the chimney and areas the foam must not reach are masked off.
- Battening: if the rafters are not deep enough, battens are fixed underneath to achieve the agreed thickness.
- Spraying: the foam is applied gradually in several passes up to the agreed thickness. Work usually starts at the wall plate and moves up towards the ridge.
- Trimming: foam that rises above the face of the rafters or battens is cut off once cured, so that the ceiling can be fitted.
- Thickness check: the installer measures the layer in several places and tops up any thinner areas.
- Ventilation and clean-up: the space is ventilated, offcuts and protective sheeting are collected and removed if this is included in the quote.
- Further layers: the vapour control layer and ceiling are fitted by the same or another contractor, as agreed. Spraying alone does not include these layers.
The foam surface is tack-free and firm almost immediately, but it remains soft and flexible. During and after spraying, nobody should be in the space without protective equipment, and it must be ventilated. Manufacturers often state about 24 hours before people return without protection, but the specific manufacturer's figure applies. A typical loft in a family house is usually sprayed in one working day.
What affects the price
The guide price for the work is €13.00 per m². It covers the spraying itself. Check whether the quote includes the foam material; the vapour control layer, ceiling and battening under the rafters are priced separately. The price is based on the area of insulated slopes and ceiling, not the floor area of the loft. A pitched roof has a larger area than its footprint, so it is worth having the actual areas measured. The final cost depends mainly on these factors:
- Layer thickness: the price per m² is tied to thickness. Nearer 25 cm means more material than 20 cm, and the 30 to 35 cm variant is a separate, more expensive item.
- Roof complexity: dormers, valleys, roof windows and many struts and collar ties mean more cutting, masking and slower spraying. A very complicated roof costs noticeably more than a plain slope.
- Penetrations: the chimney, soil vent pipe, aerial or ventilation ducts must be worked around and masked, and each one adds work.
- Size of area: a large continuous area is quick to do. On a small area, preparation, travel and setting up the rig take a larger share, so the price per m² tends to be higher.
- Condition of the roof: removing old insulation or repairing the membrane is separate additional work. In homes built before 2000, have suspect materials tested before you drill or demolish, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Site conditions: a cold or damp substrate means waiting or heating the space.
- Access: when hoses run through an occupied house, over several floors or a long way from where the rig vehicle can park, more masking and labour are needed.
When comparing quotes, always check the thickness and type of foam stated and whether trimming, cleaning up and waste removal are included. Before waste is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
How to prepare so that spraying goes quickly
A lot of time is saved when the site is genuinely ready for spraying. It helps to have:
- a cleared loft without furniture, boxes and old clutter,
- an agreed parking spot for the rig vehicle and a clear route for the hoses,
- agreement in advance on whether the installer needs power from the property and where the supply point is,
- nobody living in the house during spraying and ventilation, or at least living areas closed off, and pets out of the house,
- a date already booked for fitting the vapour control layer and ceiling, so the foam is not left exposed for long.
The job is delayed by unfinished work from other trades, such as the electrician or roofer, which forces spraying to be interrupted or rescheduled.
Common mistakes and how they show up later
Most problems arise not from the material but from preparation and choices.
A thinner layer to make the quote look cheaper
The roof does not reach the required thermal performance. The loft is harder to heat in winter and overheats in summer, and putting it right means taking down the ceiling.
Spraying onto damp or frozen timber
The foam then adheres poorly and can pull away from the rafters. Gaps form that let air through, and cold spots may appear on the ceiling.
Missing vapour control layer
Moisture from the rooms enters the build-up and accumulates there. This shows as damp patches, mould or damaged roof timbers.
Foam sprayed directly onto the roof covering
Without a membrane and ventilated gap, moisture under the covering has nowhere to go, the batten timber can become damp, and when the roof is re-covered the foam is stuck to the tiles.
A leaking roof covered with foam
Open-cell foam soaks up water and hides the point where the roof leaks. The fault then shows up late, only as a wet patch on the ceiling, while the timber beneath the foam suffers.
Unfilled corners at the wall plate and ridge
This is exactly where thermal bridges form. They show as a cold strip on the wall below the slope, where condensation and mould can develop.
Services buried in foam without records
When a fault occurs later or a light fitting is installed, nobody knows where the cable runs.
Comparing quotes only by price per m²
Each quote may assume a different thickness and type of foam. Only quotes with the same thickness, or the same resulting thermal performance, are comparable. Also ask for the technical data sheet of the foam used and references from similar roofs.
How to check the finished work
Inspect the work before the insulation is covered by the ceiling. Later it will no longer be accessible.
- the layer thickness has been measured in several places and matches the agreed value, and you can be present during measuring,
- the foam is continuous, without holes or unfilled corners at the wall plate, ridge and penetrations,
- the foam adheres well to the rafters and does not pull away anywhere,
- excess foam is trimmed flush with the rafters or battens,
- the ventilated gap between the membrane and roof covering has stayed clear,
- the clearance around the chimney has been kept,
- windows, floors and stairs are free of foam,
- the vapour control layer is fitted as designed and sealed to the surrounding structures,
- the installer has provided documentation of the material used and the actual thickness as a basis for the guarantee.
Frequently asked questions
The guide price is about €13.00 per m² of insulated area. The final cost depends on the actual thickness, roof complexity, number of penetrations, size of the area and whether old insulation must be removed or the membrane repaired first. The vapour control layer and ceiling are separate items.
For a typical habitable loft, 20 to 25 cm is usually enough. A thicker layer makes sense if you want a higher energy standard or less overheating in summer and do not mind a lower ceiling. It is best to base the decision on a thermal calculation.
Usually not. Rafters tend to be about 14 to 18 cm deep, so battens are fixed underneath to make up the missing thickness. Measuring a rafter shows how much will be needed.
Yes, it soaks up water if the roof leaks. However, it is vapour-permeable, so in a correctly designed build-up it can dry out. This requires a dry substrate at the time of spraying, a sound roof covering, a working roofing underlay and a vapour control layer on the room side.
It is not recommended. Good spraying requires professional equipment, precise metering, the correct temperature of the components and substrate, and protective equipment. DIY kits do not guarantee an even thickness or proper adhesion.
A family house loft is usually sprayed in one day. The foam quickly becomes tack-free, but the space must be ventilated, often for about 24 hours before people return without protection. The exact time is stated by the foam manufacturer.
PUR foam is sprayed and expands on site into a continuous layer that also seals gaps against air movement. Blown mineral wool or cellulose is blown loose into the space, is better suited to horizontal loft floors and does not provide an airtight seal.
Related work
How rigid closed-cell PU spray foam is applied, where it makes sense, what to check before ordering and how to inspect the finished insulation.
How open-cell spray foam is applied at 30 to 35 cm: extending rafters, spraying in passes, vapour control, typical mistakes and checks before plasterboard.
How glass wool is blown onto a loft floor and into cavity walls, what depth and density to ask for, common mistakes and how to check the work.
What a roof replacement costs: stripping, checking the roof structure, underlay, tiles or metal, flashings, asbestos cement and a 150 m² labour example.
Price list for sheet metal works in 2026: gutters and downpipes, chimney flashing, sills, cappings and metal roofs. What drives the cost and a NUMIQ estimate.
How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.